![Construction method of 14 box culvert_第1頁](http://file3.renrendoc.com/fileroot_temp3/2022-1/18/a509c146-cbad-47d7-b194-f910617b1266/a509c146-cbad-47d7-b194-f910617b12661.gif)
![Construction method of 14 box culvert_第2頁](http://file3.renrendoc.com/fileroot_temp3/2022-1/18/a509c146-cbad-47d7-b194-f910617b1266/a509c146-cbad-47d7-b194-f910617b12662.gif)
![Construction method of 14 box culvert_第3頁](http://file3.renrendoc.com/fileroot_temp3/2022-1/18/a509c146-cbad-47d7-b194-f910617b1266/a509c146-cbad-47d7-b194-f910617b12663.gif)
![Construction method of 14 box culvert_第4頁](http://file3.renrendoc.com/fileroot_temp3/2022-1/18/a509c146-cbad-47d7-b194-f910617b1266/a509c146-cbad-47d7-b194-f910617b12664.gif)
![Construction method of 14 box culvert_第5頁](http://file3.renrendoc.com/fileroot_temp3/2022-1/18/a509c146-cbad-47d7-b194-f910617b1266/a509c146-cbad-47d7-b194-f910617b12665.gif)
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
1、PROJECT: APPROACH ROAD OF CAN THO SIDE PACKAGE: 3CONSULTANT: JV CONSULTANT CONTRCTOR: CSCEC- 1 -CONSTRUCTION METHOD STATEMENT FOR BOX CULVERT 1.Description1.1QuantityThere are total 14 sets box culverts for drainage with two types size (Type A: 2 x 2.5 x1.5m; Type B: 2 x 2.5 x 2m) in Package3. The m
2、ore details refer to the following list:LIST OF BOX CULVERTleftcenterright1Km7+8262x2.5 x230.624.064.284.060.2drainage2Km8+8902x2.5 x238.73.33.6853.4180.55drainage3Km9+3262x2.5 x1.524.12.5022.7472.5020.252drainage4Km9+6202x2.5 x1.530.922.5142.8692.5140.264drainage5Km10+3102x2.5 x230.213.6373.93.5750
3、.825drainage6Km10+6902x2.5 x1.524.12.4192.6642.4190.169drainage7Km10+9502x2.5 x1.524.12.5392.7842.5390.289drainage8Km11+4512x2.5 x1.524.12.8433.0882.8430.593drainage9Km11+6902x2.5 x1.524.12.9553.22.9550.705drainage10Km12+1802x2.5 x232.95.1055.355.1050.7drainage11Km12+7562x2.5 x228.533.6563.93.6190.7
4、drainage12Km13+6002x2.5 x1.524.12.6242.8692.6240.374drainage13Km14+4502x2.5 x1.524.13.1993.4443.1990.949drainage14Km14+8902x2.5 x1.524.12.4252.672.4250.175drainageFinished elevation (m)Bottomelevation(m)remarkNo.StationSize (m)length(m)PROJECT: APPROACH ROAD OF CAN THO SIDE PACKAGE: 3CONSULTANT: JV
5、CONSULTANT CONTRCTOR: CSCEC- 2 -1.2Related articles Concrete:The batch plant concrete will be used for the cast-in-site culvert, and the requirement of the concrete refers to the following list:LIST OF REQUIREMENT FOR CONCRETEConcrete ClassStrengthfc (MPa)Kind of structure in useE24Box culvert, pipe
6、 culvertRetaining wall, wing wall, support of pipe, drop inlet, catch coverF20Apron, kerbG15Lean concreteRebar:NoDescriptionStrengthfy (MPa)Related specification1PLAIN ROUND BAR250(Min)ASTM A615 or equivalent2High yield deformed bar390(Min)ASTM A615 or equivalentSpecification:LIST OF RELATED SPECIFI
7、CATIONNO.RELATED SPECIFICATION1.AASHTO 98 _ LRFD BRIDGE DESIGN SPECIFICATION 2.AASHTO GUIDE SPECIFICATION FOR DESIGN AND CONSTRUCTION OF SEGMENT CONCRETE BRIDGES3VIETNAMESE HIGHWAY BRIDGE STANDARD 19792.Preparation for construction2.1 MaterialPROJECT: APPROACH ROAD OF CAN THO SIDE PACKAGE: 3CONSULTA
8、NT: JV CONSULTANT CONTRCTOR: CSCEC- 3 - Rebar: the grade, dimension should be accordance to the contract requirement, supply with certification of quality, and keep the rebar surface from rust. Cement: Use the qualified PC40 type. Course aggregate: gravel1X2cm, capacity of compress resistance500kg/c
9、m2, impurity ratio1%; Sand: course sand or river sand, impurity ration 1.3m drainage2Km8+8902x2.5 x238.70.55-0.1Max level 1.3m drainage3Km9+3262x2.5 x1.524.10.252-0.398Max level 1.3m drainage4Km9+6202x2.5 x1.530.920.264-0.386Max level 1.3m drainage5Km10+3102x2.5 x230.210.8250.175Max level 1.3m drain
10、age6Km10+6902x2.5 x1.524.10.169-0.481Max level 1.3m drainage7Km10+9502x2.5 x1.524.10.289-0.361Max level 1.3m drainage8Km11+4512x2.5 x1.524.10.593-0.057Max level 1.3m drainage9Km11+6902x2.5 x1.524.10.7050.055Max level 1.3m drainage10Km12+1802x2.5 x232.90.70.05Max level 1.3m drainage11Km12+7562x2.5 x2
11、28.530.70.05Max level 1.3m drainage12Km13+6002x2.5 x1.524.10.374-0.276Max level 1.3m drainage13Km14+4502x2.5 x1.524.10.9490.299Max level 1.3m drainage14Km14+8902x2.5 x1.524.10.175-0.475Max level 1.3m drainageBottomelevation(m)remarkNo.StationSize (m)length(m)Excavationlevel for boxculvert (m)Current
12、 waterlevel in February2009(m)According to site condition on every location, the Contractor will propose to apply two methods of excavation under water for 14 box culvert. One method is driving steel piles (L=12m) for cofferdam PROJECT: APPROACH ROAD OF CAN THO SIDE PACKAGE: 3CONSULTANT: JV CONSULTA
13、NT CONTRCTOR: CSCEC- 6 -along with the bound of excavation. Other method will use the associated operation method of collocation well and water pump to lower the water level in excavation area. The detail information will refer to follow description:cofferdamcolloctaionwell (1:1.5 or1:2 for slope)1K
14、m7+82639.6 x10.6-0.453.72Km8+89048.4 x 11.7-0.13.63Km9+32631.1 x 9.9-0.3982.74Km9+62037.9 x 9.9-0.3862.85Km10+31039.2 x 10.60.1753.86Km10+69031.1 x 9.9-0.4812.17Km10+95031.1 x 9.9-0.3612.18Km11+45131.1 x 9.9-0.0572.39Km11+69031.1 x 9.100.0552.510Km12+18041.9 x 10.60.054.711Km12+75637.9 x 11.30.053.2
15、12Km13+60031.1 x 9.9-0.2762.313Km14+45031.1 x 9.90.2992.714Km14+89031.1 x 9.9-0.4752Existinglevel (m)Excavationbottomlevel (m)No.StationApply methodExcavation sizeat bottom levelLxW (m)For box culvert 7+826: Due to the high embankment and surcharge, this box culvert will excavated more deep. And the
16、re are a lot of water will flow in to excavation pool which can be not pumped completely by water pump. Whats more, considering condition of construction and progress, the cofferdam will be carried out. The main material for cofferdam is steel sheet pile and H-beam. PROJECT: APPROACH ROAD OF CAN THO
17、 SIDE PACKAGE: 3CONSULTANT: JV CONSULTANT CONTRCTOR: CSCEC- 7 -The follow sketch shows the arrangement of cofferdam:Cofferdam for Box culvert Km 7+826PlanMain material list:No.Itemsize(m)quantity(m)used equipmentremark1Steelpile(12m/set)0.751584Vibration hammercrawler crane2H-beam0.4144Vibration ham
18、mercrawler crane3H-beam0.3105crawler cranePROJECT: APPROACH ROAD OF CAN THO SIDE PACKAGE: 3CONSULTANT: JV CONSULTANT CONTRCTOR: CSCEC- 8 -After finished the cofferdam, the big capacity water pump will pump water in the cofferdam. Then the grab will excavate soil along the bound of cofferdam to desig
19、n bottom level. For other box culvert (location refers to above list)In order to catch up our progress, the Contractor would like to propose construct 3 location box culvert at one time. So the relative equipments will be put in 3 sets. And these box culverts almost were located low embankment area.
20、 The method which the associated operation of collocation well and water pump to lower the water level in excavation area will be applied. The follow sketch will explain clear:Drainage ditchCollocation well with water pumpFoundation ditchCollocation well by reinforcement cageFit water pumpPROJECT: A
21、PPROACH ROAD OF CAN THO SIDE PACKAGE: 3CONSULTANT: JV CONSULTANT CONTRCTOR: CSCEC- 9 -Main material and equipment list:No.Itemsize(m)quantity(m)remark1reinforcement cageD=0.812Reinforcement d=25 with steelmesh,the height is 1m2Water pumprefer to watercondition12the capacity of water pump shouldbe mo
22、re the water discharge3drainage piperefer to waterpumpabout 150marrange according to site situationAnd if necessary, the drainage ditch will arrange according to actual condition on every location for drainage.The excavation grade will be 1:1.51:2 (Adjusted with the soil condition), until to the des
23、ign level. And the excavation size of bottom level refers to the above list.Rebar work: Make survey line on the completed lean concrete surface, and also make line for the rebar/ formwork arrangement, then prepare rebar work for bottom slab and side wall. Set steel pipe to support the rebar cage whe
24、n installation to prevent cage deviation. Then minimum cover to main reinforcement shall be not less than 5cm, lap spliced will be not more than one bar than bar 12m for all.Formwork: The concrete for culvert will be cast into two phases, the first phase is that cast the bottom slab concrete, and th
25、e second phase is that cast the side wall and top slab concrete, the construction joint will be set 50cm above the bottom slab. The formwork system will use wood formwork with steel pipe support; the formwork will be pre-designed, fabricated in site. The connection between the interior and exterior
26、formwork of wall will use 16 tension bar, the vertical & horizontal distance will be 60cm; Construction joint: Refer to the original design, there are two construction joints for each segment, the first joint will be set for the two segments connection location; the second joint will be set for the
27、connection between the culvert wall with the wing wall. For the first joint, the width of connection concrete will be proposed to enlarge to 25cm, 2cm cork slab will be pre-embed in the connection, sealed with waterproof strip outside. To ensure the vertical tolerance within the limited requirement,
28、 it should be prepared two separately formwork (clamp the water stop). For the second joint, remain 20 (vertical space 300mm) in the side wall of culvert, use 14 rebar to connect between the wing wall with the side wall. The connection joint detail refer to the following drawing:DETAIL CONNECTION JO
29、INT FOR CULVERT SEGMENTPROJECT: APPROACH ROAD OF CAN THO SIDE PACKAGE: 3CONSULTANT: JV CONSULTANT CONTRCTOR: CSCEC- 10 -DETAIL CONNECTION JOINT FOR BETWEEN BOX WING WALLConcrete pouring: The key point is the second phase for concrete casting, and the important point for the concrete casting is side
30、wall construction. The height of side wall will be 2.0m (1.5m, 3.8m and 4.0m); casting with conduit pipe, remove the pipe per 1.5m. Keep the rebar out in the area of conduit pipe to easily casting. Complete rebar installation when the side wall concrete is totally casting. Cast side wall concrete 50
31、cm per layer. The concrete should be pumped into the formwork equality, the specify worker will be equipped with each poker vibrator and located in specify area. Conform to the working sequence: side wall to middle wall, then other side wall, for each layer and turn. While complete the side wall con
32、crete, begin the top slab concrete.Concrete curing: After the last treatment to surface of the top slab, cover the surface with sacks, keep moisture for 7 days.The non-bearing formwork will be dismantled after 1 days, the bearing formwork will be dismantled after 3 days.4.Quality assurance4.1RebarPR
33、OJECT: APPROACH ROAD OF CAN THO SIDE PACKAGE: 3CONSULTANT: JV CONSULTANT CONTRCTOR: CSCEC- 11 -The rebar type, quality, weld rod, weld flux, will be accordance with the contract requirement,The rebar lap length, quantity, space, anchor distance will be checked and accordance the requirement as descr
34、ibed before. The quantity of loose binding for rebar will be kept within 10% of all.The rebar splice and lap length will be accordance with the requirement, and checked strictly. 4.2FormworkThe formwork support should have enough bearing capacity and stability. The supports have enough support area.
35、The gap between the formworks will be controlled within 1.5mm.The interface between the formwork and the concrete should be cleaned and pre-treated with insulate agent to prevent sticking. The total area of insulate agent will not more than 1,000 cm2.4.3ConcreteThe cement, water, aggregate, adhesive
36、 agent will be accordance to the material requirement and approved by the Engineer.The mix design, material measurement, mixture method, curing and construction joint should be pre-taught to the specify staff, and operate followed the standard procedure.The sample cube will be tested as the AASHTO 98 requirement; the test result sh
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年度建筑泥工工程勞務(wù)與施工技術(shù)培訓(xùn)合同
- 美食博主食品推廣合作合同
- 連帶擔(dān)保借款合同
- 智能設(shè)備銷售及售后服務(wù)合同
- 進(jìn)行專業(yè)網(wǎng)絡(luò)咨詢服務(wù)合同
- 清潔交通基礎(chǔ)設(shè)施合同
- 商貿(mào)公司招商合同范例
- 醫(yī)院培訓(xùn)合同范例
- 全流程合同范例
- 地毯買賣合同范本
- 事業(yè)單位公開招聘工作人員考試題(公共基礎(chǔ)知識試題和答案)
- 低空飛行旅游觀光項目可行性實施報告
- 2024年版:煤礦用壓力罐設(shè)計與安裝合同
- 甲狀腺的科普宣教
- 《算法定價壟斷屬性問題研究的國內(nèi)外文獻(xiàn)綜述》4200字
- 2024年04月浙江義烏農(nóng)商銀行春季招考筆試歷年參考題庫附帶答案詳解
- 涉密計算機(jī)保密培訓(xùn)
- 2024年浙江省五校聯(lián)盟高考地理聯(lián)考試卷(3月份)
- 在線心理健康咨詢行業(yè)現(xiàn)狀分析及未來三至五年行業(yè)發(fā)展報告
- 電動三輪車購銷合同
- 淋巴瘤的免疫靶向治療
評論
0/150
提交評論