1、.IntroductionThe Three Gorges Dam which is located in YiChang of China is the biggest hydropower project all over the world and the whole project costs 16 years from Dec. 14th 1994 to 2009. There are two important parts, the main building works and diversion projects, included in the project. The in
2、vestment of the project is 248.537 billion Yuan in total: dam Project costs 126.385 billion Yuan, power transmission project spends 36.499 billion Yuan, and the amount of resettlement funds is 85.653 billion Yuan.Why this project was selected for reviewSo far, as the biggest hydroelectric project, t
3、his project costs a huge number of money, time as well as numerous human and material resources, at the same time, it creates world record in many ways. The project needs not only very strict requirements in technical aspect, but also the harsh demanding in project management. So this project meets
4、the requirements of the course, which will help us understand senior project management intuitively and deeply by studying this case.Brief explanation of project objectives, proposed scope and key stakeholders;1:project objectives:(1) The benefit of Flood controlThree Gorges Dams primary objective i
5、s to reduce the losses and;.damage by controlling the frequent and hazardous floods of Yangtze River(2) The capacity of electric power generationThe dams secondary benefits are producing cheap and clean electric power which is equivalent with 15 nuclear plants.(3) The benefit of shippingThe Gorges D
6、am project that has improved more than 600 km navigation mileages and increased the shipping capacity will accelerates the waterborne traffic and lower cost.(4)The function of drought resistingThree Gorges Dam of the huge storage can effectively ease the drought situation by adjusting the water rele
7、ase.2:Proposed scope:This project will form a huge reservoir which is 600 km long. The length of the dam crest is 3035 meters; the height of the dam is 185 meters. The ordinary water level is 175 meters with water storage of 39.3 billion cubic meters, of which flood control storage capacity is 22.15
8、 billion cubic meters.3:key stakeholders:China Three Gorges Corporation which is the legal entity for Three Gorges Dam Project is in the charge of the State Council. Its;.responsibilities include the financing, constructing, operating and balancing the economy benefits and the environment protection
9、.The Three Gorges DamProject led to the biggest immigrant throughout our country history. Immigrants who lose their land and home were placed separately to 11 provinces from the reservoir region according to the principle of local settlement and relocated settlement.Outline of key success criteria a
10、nd deliverables1. The criteria of flood controlFlood always causes more terrible impact in this region than others owing to its rich agricultural land and prosperous cities. There are some criteria for flood control of the dam. First, the flood control standard of this project should be upgraded to
11、a level of preventing 100-year floods. With such flood coming, the dam can regular the flow which will not exceed 56700 cubic meters every second. Secondly, The Three Gorges project need to reduce the sediment by the scour of flood into the Dongting lake. Not only can we effectively mitigate the thr
12、eat to Dongting lake, but also extend the life of the Dongting lake. Thirdly, it should strengths the flexibility and reliability of control flood to avoid terrible losses such as the destroy to Wuhan, the terminal of Jinghan trunk railways, and the damage to people and their property2. The criteria
13、 of electric power generationThe project has been predicted that 26 turbine-generator units;.can generate electricity in 2003.From then on, they can put 2.8 million KW every year. The dam should be able to product the energy for central and east of China to satisfy their need of reducing cost and ac
14、celerating the development of economy. Whatsmore, this benefit should gives impetus to replace the thermal power which used to be dominated in China by this kind of clean and green energy which can reduce large amounts of carbon dioxide and more than 2 million tons harmful gas emissions a year.3 The
15、 criteria of navigationThe significant criteria of navigation is accelerating the prosperity of waterborne traffic and lowering cost. For one hand, By the Three Gorges reservoir sregulation, in dry season, the water release can get 5860 cubic meters per second which is larger than the amount of natural circumstances that ensure the ton fleet from Chongqing to Shanghai easily. For another hand, the completion of the dam
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025-2030年中國絕緣制品市場十三五規(guī)劃與投資戰(zhàn)略研究報告
- 2025-2030年中國紅木市場競爭格局及發(fā)展趨勢分析報告
- 2025-2030年中國精密減速器市場發(fā)展現(xiàn)狀及前景趨勢分析報告
- 2025-2030年中國碲行業(yè)運行狀況及發(fā)展趨勢分析報告
- 2025年遼寧省安全員C證考試(專職安全員)題庫附答案
- 2025-2030年中國皮帶輸送機市場運行狀況及發(fā)展前景分析報告
- 2025-2030年中國電解銅行業(yè)發(fā)展?jié)摿σ?guī)劃研究報告
- 重慶郵電大學《電腦輔助設計》2023-2024學年第二學期期末試卷
- 成都信息工程大學《藝用人體解剖學》2023-2024學年第二學期期末試卷
- 泰山學院《財政政策與貨幣政策》2023-2024學年第二學期期末試卷
- 新教材背景下思政教育在高中英語課中的滲透與應用分析
- 機械拆除舊房施工方案
- 獨家投放充電寶協(xié)議書范文范本
- P氣瓶充裝模擬考試題及答案
- 社區(qū)獲得性肺炎(1)護理病歷臨床病案
- 新人教版高中數(shù)學必修第一冊-3.3 冪函數(shù)【課件】
- 生物基有機硅材料的研究進展及前景展望
- 國有企業(yè)保密管理制度
- 一年級上冊數(shù)學試題-期中試卷五 蘇教版(含答案)
- 鄉(xiāng)村振興背景下農(nóng)業(yè)碩士產(chǎn)教融合培養(yǎng)模式的創(chuàng)新
- 人美版(2024)七年級上冊美術第二單元 色彩魅力第1課《自然的色彩》教學設計
評論
0/150
提交評論