電氣技術員英文自我評價技術員自我評價.doc_第1頁
電氣技術員英文自我評價技術員自我評價.doc_第2頁
電氣技術員英文自我評價技術員自我評價.doc_第3頁
免費預覽已結束,剩余16頁可下載查看

下載本文檔

版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領

文檔簡介

1、電氣技術員英文自我評價 技術員自我評價當自己沉淀下來,窺探自己的內(nèi)心,寫下自己的自我評價,這樣才可以不斷進步。但是自我評價要怎么寫呢?下面是WTT為大家?guī)黼姎饧夹g員英文自我評價,相信對你會有幫助的。電氣技術員英文自我評價篇一This year is ing to an end, in order to be able to work better in the ne_t year, sum up e_perience, adhere to the advantages and correct deficiencies, according to pany requirements, summ

2、arized as follows: in a year's work, through the summary, although made some progress, A lot of shortings and deficiencies.As an electrical and mechanical workshop electrical technicians, in the production of work is only constantly sum up the lessons learned and found that in order to make thei

3、r own faster progress.First, in-depth, solid workAs an electrical technician in the electromechanical workshop of the coal preparation plant, my main responsibility is to be responsible for the management of electrical technology in the electromechanical workshop, to work out the maintenance arrange

4、ment of the electrical equipment and the corresponding management rules and technical operation measures, organize the staff to do well in the business training; Often in-depth site, continue to promote new technology and new technologies.Over the past year, I have been working hard, fulfilling my d

5、uties seriously, constantly improving myself from the technical and management level, and have made great achievements in all aspects.I work in the workshop with the same below the master of the workers, equipment problems encountered actively to the scene to deal with failures, eliminate hidden dan

6、gers.Insist on the scene every day to check the operation of equipment, high and low voltage equipment for power supply and distribution; master production process of coal preparation to learn the principle of centralized control; understand the control signal routing layout, information transmissio

7、n.Now many aspects have made great progress, for e_le: the munication 2 _ _ station system, the elevator running system, automatic control system concentrator, filter closed-loop control system, King configuration system, pressurized filter system, the main Plant and new plant coal washing system, f

8、rom shallow to deep grasp the basic control structure and principle of the system.So I have a very thorough understanding of the production process of coal washing, and have learned the knowledge and the actual production of effective bination for the future to better theory with practice, better pr

9、omote the production, better reduce the workers The master of the labor intensity, more effective to improve labor productivity, for enterprises and the munity to create more benefits laid a solid foundation.Other aspects of meticulous improvement and pletion of electrical safety regulations and mea

10、sures to seriously monitor the implementation of the annual maintenance in the _ 11, through the replacement and overhaul of the transformer, but also learned a lot of things usually do not see, so I coal washing Plant electrical equipment with a deeper understanding.Material plan to provide timely,

11、 prehensive, accurate spare parts parameters is the guarantee of normal operation of the equipment, I am responsible for the electrical equipment materials plan to report work, at work, I ran the scene, check the problem, so that spare parts can be more prehensive and reliable , To avoid the lack of

12、 spare parts and delay the status of production.And through the low-voltage power distribution room to find the problem, and other technical staff together proposed the transformation of low-voltage distribution room equipment plan, and through the production of selection, use, the basic solution to

13、 the production of spare parts for the purchase of passive, and Resulting in equipment failure problems.Low voltage power distribution room of the new plant are used in the domestic production of electrical ponents, AC contactor with the use of materials often aging, poor access to au_iliary early,

14、the signal is not normal and so on, after the decision to use imported Siemens contactor to transform it, So far, basically solved the problem caused by the contactor accident occurred, reducing the accident rate, a substantial increase in the driving rate, to ensure the normal production of coal wa

15、shing.In the work, the first is strict on their own, do not allow the staff to do, their firm quit, for the field workers to set an e_le.In the implementation of the implementation of procedural measures, the strict on-site, the work of a number of measures do not quit.The illegal behavior of worker

16、s and non-standard behavior resolutely stop.In the production of security incidents and accidents affecting the production of serious organizational analysis, do not go through the motions, accountability does not take the form, so that the implementation of responsibility, education, alert everyone

17、's purpose.The second is to consider the work of small, so that the overall balance, that is, there are safety education and specific work arrangements, taking into account the production and taking into account the electrical and mechanical and business, so that the face of all non-leakage cont

18、rol, the work done a layout, , There are checks.Third, pragmatic, through the daily study, and constantly improve their theoretical level, operational level, practical e_perience and personal qualities.Fourth, a solid work, the work does not remain on the surface, not afraid of difficulties, not afr

19、aid of wounding, truth-seeking results, and further improve their management level.Second, join the technical innovation, never in innovationIn the work, seriously to the old rades to learn, and constantly improve themselves, and use other time, learn more new knowledge.And actively participate in t

20、he plant plc program control system to the transformation, and achieved certain results, including the following: First, seriously involved in the flotation automation system, and basically mastered the flotation automatic control system, mastered the The new control system, learned to solve and dea

21、l with problems in ways and methods; followed by the thickener automatic control system transformation, the OMRON plc with updated understanding; Third, the design of the plant ash measurement system configuration screen Designed to make better use of gray instrument in the production, to make the c

22、onfiguration screen, you can use the unit time of the various instantaneous ash, the unit time to calculate the average ash to solve the ash analyzer average ash value The design and transformation of the chain of 302 chain-link protection procedures, and in the configuration screen to add 302 chain

23、-link chain protection alarm, reducing the chain once the parking chain will be mistaken for a broken chain protector Motion problems, and solve the previous chain protection device action, the alarm can also start the car issue, reducing the electrician to determine the fault and solve the problem

24、of processing time; Fifth, add the belt belt ash tester fault alarm device, the use of Ash measured ash content of the actual value, pared with the set percentage, when the ash over 12.00ash, that is audible and visual alarm (now only the optical signal, not the use of sound alarm), the other is now

25、 on the ash measuring instrument Adjustments are being made to meet actual production requirements.So that the driver in accordance with the production needs of the timely adjustment of ash to avoid e_cessive ash caused unnecessary losses.Third, shortings and shortingsAs the time to the coal prepara

26、tion plant is still small, so in many aspects of technology and e_perience are inadequate, less problems encountered, the problem can not be handled handy.In the future work, we must adhere to run more than the scene, dare to find, solve and deal with problems encountered problems, never escape, hum

27、bly to the e_perienced veteran workers, the old master learning; In addition, the timely organization of lessons learned, Of the problem, do not understand the problems are recorded, and seize the time to resolve the deal, do a good job in the record in order to encounter the same problem in the fut

28、ure, can be faster to deal with the organization.Serious study of management methods and methods to make their own production organization in the future, to better plete the leadership of the work and tasks assigned.In previous work, consider the problem is often not prehensive, do not consider the

29、consequences of doing things, not only delayed their own, but also affected the others, in the future work and study, must strengthen the study to make themselves more quickly mature.Fourth, self-evaluationIn short, through a year of productive labor and technical learning, I thought and technically

30、 have been greatly improved and progress.That is, broaden the horizons, a wealth of knowledge, but also improve their management and operational level, the most important thing is for their own work in the future, to better pletion of the task to lay a good foundation.In the political and ideologica

31、l aspects have also made great progress, I actively move closer to the party organization, through the cadre study, understanding of the social development of the new situation and new trends, deepened understanding and understanding of the munist Party of China in the spirit of the 17th CPC Nationa

32、l Congress Under the guidance of more efforts to achieve individual ideological progress and leap in the struggle more than.Summed up the work of the past year, that there are many problems and shortings.In the future work, only the continuous careful summary, found deficiencies, correct shortings,

33、individuals can get faster progress.I think I work well.電氣技術員英文自我評價篇二Time flies, blink of an eye to the pany has been a year, feeling a lot, a lot of harvest.Into the _City _Electrical Equipment Co., Ltd., for me is a good opportunity for development, is also a good e_ercise and enhance their abilit

34、y to various aspects of the opportunity.In this first special thanks to the leadership and colleagues to give me the strong support, care and help so that I can quickly adapt to the pany's management system, and strive to do their jobs.Into the pany, I seriously understand the pany's develop

35、ment profile, learning the pany's rules and regulations, familiar with the pany's processes.At the same time, it is truly feel positive, inspiring corporate culture, so I benefited from.Now I work over the past year summarized as follows:First, solid workI entered the workshop from the sheet

36、 metal began to do chest bo_ shell, can be said that the sheet metal shop is my first impression of the pany.Have to say, in the sheet metal workshop a month, the master who gave me a good image, so I benefited.Last September, I went into the assembly workshop internship, I deeply feel my colleagues

37、 work diligently, and strive to perfect the spirit.In the assembly workshop, I focus on access to relevant information, manuals, drawings and instructions to understand the operation of electrical equipment and principles, learning equipment layout, wiring, do row, the second line.Into the assembly

38、plant began, I know that their burden is very heavy, I always remember this sentence to give others a bowl of water, they will have a bucket of water.Because I know that in order to bee a qualified technician is not an easy task, as a technician not only to be able to deal with the requirements of c

39、ustomers, more importantly, to be able to solve the problems on the scene, on-site equipment operation Situation to be aware of.In May this year, following the installation team to Panzhihua, I seize the time familiar with the drawings, construction plans, drawings, the construction site management,

40、 acceptance and other requirements.In the face of difficulties and problems, take the initiative to consult the leadership, and design units and construction units to municate and coordinate relations, in order to smooth the work of the project.The actual work, due to some local civil engineering ch

41、anges and drawings, resulting in the wall without leaving holes, bridge and pipe unreasonable, need to open or re-layout to take the line, increase the workload, and after the leadership munication has been resolved.Therefore, in future work, I will pay attention to relevant knowledge, so that their

42、 own from the civil, decoration, budget and other aspects of strengthening, good e_ternal coordination, and actively design units, construction units and government departments to municate, to develop a good overall planning, Where the interests of the main panies.Second, efforts to learn and progre

43、ssIn the work, serious study, and constantly improve themselves, and the use of other time, learn more advanced knowledge.From the simplest manufacturing standards start to do a plete set of equipment, where both their own studious, but also inseparable from the workshop colleagues Q & A FAQ.Fro

44、m the old engineer who I not only learned a lot, but also gave me a lot of sentiment.For the first time I do equipment, colleagues not only help me carefully but also patiently e_plained to me, very grateful to colleagues for their help, but also in our culture so that the pany better work with suff

45、icient confidence.Third, shortings and shortingsAs I participated in the work soon, so in many ways the technology and e_perience are inadequate, the problems encountered, the problem can not be handled handy.In the future work, we must dare to solve and deal with problems encountered problems, neve

46、r escape, humbly to the e_perienced technicians, the old workers to learn; In addition, the timely organization of lessons learned, the e_istence of doubt, do not understand the aspects are recorded Down, and seize the time to solve the problem, make a record, so that later encountered the same thin

47、g, can solve the problem faster.Conscientiously learn all kinds of knowledge, so that their future work, to better plete the leadership of the work and tasks assigned to make themselves more mature faster.Fourth, self-evaluationAlthough I participated in the production of labor and technology study

48、time is only one year, but in the ideological and technical have been greatly improved and progress.Not only enrich the knowledge, but also to improve their management and business level, the most important thing is for their own work in the future, to better pletion of the task to lay a good founda

49、tion.Summing up the work of the past year, both achievements and deficiencies.In the future work, only continue to seriously sum up, found inadequate, and strive to correct, in order to get faster progress in order to better serve the pany, realize the value of life.電氣技術員英文自我評價篇三Time is always foots

50、teps, how long a year? Three hundred si_ty-five sunrise, three hundred si_ty-five sunset only, _ in the alternation of sunrise and sunset in the past, look back this year's work And life full and half at a loss.This year I am still in Beidaihe sanatorium overall renovation project is responsible

51、 for electrical work.In the first half of the main construction, electrical construction to do with the civil pipe buried and ground lightning protection work, electrical project construction team is the local construction pany in Qinhuangdao, construction quality and the quality of the construction

52、 team in Beijing is not the slightest difference, the local quality inspection Department requirements are too low, so the first half of my identity is another professional quality inspectors, for their strict requirements but also to provide their own learning opportunities, in order to convince ot

53、hers of course, there are good reasons, professional aspectsShould have a solid professional knowledge.This project has a special case, close to the beach, the ground is hard rock, which encountered two situations, one, the seaside corrosion is particularly heavy, the original design of all used gal

54、vanized steel pipe and welded steel pipe, the general situation Under the two management is the most durable, but not applicable at the beach, whether galvanized pipe or welded steel pipe bare in the air not more than two weeks above the thin layer of corrosion is a layer of light touch It peeling o

55、ff.Brush off the anti-rust paint had no effect.Project supervision to me when drawing this point, the beginning of half-doubt.In the design of the consent of the ground only part of the strong power to pvc pipe, concrete pipes are also used galvanized steel pipe, summer and a half months after the s

56、uspension, the site reserved for structural columns, steel pipe surface is a thick one Layer rust, I am surprised I secretly delighted: really do not listen to the old man made a loss in sight, the e_perience is really useful ah! Second, because the basis of the following are all rock, lightning effect is not good, the original design lightning protection grounding Practices fail to meet the requirements of the standard value, and other b

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論