




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、 INSPECTION OPERATION SHEETIOS NO.DESCRIPTIONXM-14-REV0Mains Voltage Class I LightsNO.AQLCLASSINSPECTION/TESTPARAMETERMEASMETHODSPECIAL INSTRUCTIONSCONFROMANCEYESNON/A10CriticalMains Plug Check for correct symbols and their authenticity. Check if there is foreign metal object within the plug.VisualP
2、remier Specification: PD/303 and BS 1363.This check to be reported as found on FRI report.20CriticalPull test for terminals:20 N for 1 min. Terminal should not detach fm the wire.Visual/Physical30CriticalCheck cable anchorage by pulling the wires with 60N (round 6kg weight), 25 times, 1 S each time.
3、 The wire movement should not exceed 2mm.Visual/PhysicalPremier Specification No. PD/303. 42.5MajorCheck 10% of sample for the following: a) Open plug and check for correct wiring.b) Ensure no strands protrude out of terminals and that both terminals are screwed tightly onto the wire.c) Ensure termi
4、nals are not soldered.Visual Premier Specification No. PD/30350CriticalCheck for correct fuse (3 Amp) and its authenticity.VisualFuse to meet BS specification BS 136260CriticalSecurity of Bulbholdersa) Check for Premier approved bulb and bulb holder against Premier Product Specification Sheet.b) Che
5、ck 10% of sample size to ensure bulb glass does not rotate when subjected to a torque of 0.025NmVisualAny other bulb holder is unacceptable.70CriticalConduct a push test on bulb holder with a force of 15N (1.5kg) to each wire then 30N (3kgs) to 2 wires together. All for 1min. After test, the wires s
6、hould not move more than 0.8 mmVisual/Physicalspecification PD/304.80CriticalConduct a pull test on bulbholder with a force of 30N (3kg) to each wire for 50 times. After test, the wires should not move more than 2 mmVisual/Physicalspecification PD/304.90CriticalFire Retardant of Bulbholder:Put the b
7、ulbholder in needle flame for 10 s. After removal of flame, the holder burning shall not exceed 30 s and burning drops fm holder shall not ignite tissue 200 mm below Visual/Physical102.5MajorReplacing bulbs:The bulb should not be pull out with force less than 3N (0.3kg).If the bulb need more than 10
8、 N to pull out, a bulb mover is required.Visual/Physical112.5MajorSpare BulbsCheck spare bulbs, supplied with the lightest, for fit and function. Check they are correctly labelled with bulb rating Visual/PhysicalRefer to Premier Product Specification sheet120CriticalFuse BulbsCheck the bulb tip colo
9、r in white or matches as per the instruction sheet and cable labelVisual/ PhysicalRefer to Premier Porduct Specification sheet130CriticalFor rope light, do the pull test on the connector of cable with rope and end cap with 60N (round 6kg weight), 25 times, 1 s each time. The wire or rope movement fm
10、 the connector should not exceed 2mm.Visual/ Physical140CriticalControl Box (if fitted)Conduct a drop test from a height of 1M on a sample of 10%.Visual/Physical150CriticalConduct a pull test of cable with 60N (round 6kg weight), 25 times, 1 s each time. The wire movement should not exceed 2mm.Visua
11、l/PhysicalPremier Specification No.PD/304160CriticalConduct a destructive test on 2% of the boxes by removing the cover and examining for:(a) damage to the insulation at the point where the cable is anchored. (b) Creepage and clearance between mains leads this should be 2mm minimum.(c) If there is f
12、oreign object within the boxVisual/Physical170CriticalLight Chain connectorsCheck the directions of plug/socket: Socket part (without open pin) should be connected to mains. 180CriticalEarthingCheck the correct earthing. Earthing resistance should be less than 0.5EN60598-1 7.2190CriticalHigh Pot Tes
13、tTo be conducted on complete sample size at minimum voltage of 1500V for 3 second between Live/Neutral and outer surface/earthingTestOnly use calibrated test equipment.202.5MajorFunctional TestTo be conducted on 10% of sample size. Do a life test on the samples for full duration of the FRI or min 3
14、hours. Test210CriticalCable Ensure cable is in compliance with specification. VisualRefer to Premier Product Specification sheet220CriticalOn silhouettes, ensure cable does not touch bulbsVisual232.5MajorCheck cable lengths against Premier Product Specification SheetVisual242.5MajorCheck for correct
15、 cable label including correct batch code i.e. month and year.Visual250CriticalFrame and ShadeIf the frame or shade is made of non fire retardment material (cant pass glow wire test). It should be at least 30mm fm the bulbsVisual/PhysicalEN60598-1 4.15262.5MajorLED Static PreventionCheck LED product
16、ion line to ensure work benches, floor and operatives are adequately equipped to prevent staticVisual/ PhysicalTo be done in OLI272.5MajorLED AssemblyCheck to ensure LED bulb is firmly secure in the cable sleeve if sleeve structure is used.Visual280CriticalFor Edison screw lampholderCheck to ensure
17、central contact to be live and outer contact to be neutral. Also gap between lampholder and bulb should be less than 3 mmVisual292.5MajorIn line switch for candle bridge Ensure the switch is located 12”max from the candlebridge302.5MajorPackaging:Check box instructions for the following:(a) barcode
18、(b) text e.g. bulb ratings, catalogue number are correct. (c) Check bulb changing method is correct.(d) Check function of control box is as per instruction(e) Ensure all claims made on the box are accurateVisualRefer to relevant packaging manualRefer to Premier Product Specification sheet310Critical
19、Drop test outer packaging to ensure product remains undamaged and functional. Use Premier drop test requirements procedure in WI 13.VisualPremier WI 13 latest revision.322.5MajorCheck box material, window acetate against product Specification. Check and report the labelling positions for all labels stuck on the color box (barcode, pre-price, warning)Visual332.5MajorCheck for spare bulbs. Ensure packaging and placement will prevent breakage of glass. VisualRefer to Premier Product Specification sheet344.0MinorCosmeticsCheck for general workmanship. Any vis
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 氟橡膠高壓電纜附件行業(yè)跨境出海戰(zhàn)略研究報告
- 家居裝飾品倉儲行業(yè)深度調(diào)研及發(fā)展戰(zhàn)略咨詢報告
- 《高考備考指南 理科綜合 物理》課件-目錄
- 2025年初中人教版初中生物七年級上冊 第一單元第二章第二節(jié) 生物與環(huán)境組成生態(tài)系統(tǒng) 說課稿
- 小學(xué)生寒假學(xué)習(xí)計劃范文(32篇)
- 個人競聘申請書5篇
- 中小學(xué)教師信息技術(shù)自我提升計劃
- 2024年度四川省專利代理師科目一(專利法律知識)模考模擬試題(全優(yōu))
- 大學(xué)英語學(xué)習(xí)的個人成長心得體會
- 2025年證券投資服務(wù)項目合作計劃書
- 四年級下冊數(shù)學(xué)第1~3單元測試卷
- CB/T 3595-1994不銹鋼酸洗鈍化膏
- 肝移植手術(shù)的麻醉課件
- 呼吸困難 教學(xué)課件
- 工程設(shè)計費收費標(biāo)準(zhǔn)
- 鍋爐專項應(yīng)急演練記錄
- 廣大燈飾制造公司-燈具生產(chǎn)作業(yè)指導(dǎo)書
- 研究思路圖模板
- 氬氣凈化機使用說明書
- 新北師大版七年級下冊數(shù)學(xué)(全冊知識點考點梳理、重點題型分類鞏固練習(xí))(提高版)(家教、補習(xí)、復(fù)習(xí)用)
- 施工質(zhì)量保證措施方案(市政管線、排水、道路等)
評論
0/150
提交評論