




版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、HP C7000機箱快速安裝指南HP BladeSystem c7000 Enclosure Quick Setup Instructions*-401Part Number 123Site requirementsSelect an installation site that meets the detailed installation site requirements described in the server user guide on the Documentation CD and on the HP website (/doc/5d1b9d7401f69e*-*27.ht
2、ml). Verifying the pallet contents * Not shown4Installing the enclosure*: Because the fully-populated enclosure can weigh up to 217.7 kg (480 lb), remove all components and the rear cage from the enclosure before removing the enclosure from the pallet to reduce the risk of personal injury when movin
3、g the enclosure.*: When removing the rear cage and midplane assembly, the connectors on the midplane assembly are susceptible todamage. Use caution to avoid damage to the pins and connectors.*: Be sure the hinges are completely open before installing the rear cage into the enclosure. Failure to do s
4、o can cause damage to pins and connectors.The enclosure can be installed in a rack or rack-free environment.Select the proper location based on requirements detailed in the HP BladeSystem c7000 Enclosure Setup and Installation Guide.Remove all components from the front and rear of the enclosure,and
5、then remove the rear cage.(Optional) Install the enclosure into a rack. See the HP BladeSystem c7000 Enclosure Rack Template. For rack-free installations, omit this step.5Install the rear cage into the enclosure, close the hinges, andtighten the thumbscrews.Enclosure bay identification Before instal
6、ling front or rear components into the enclosure, reviewenclosure bay numbering for each component. Full-heightdevice bay numberingHalf-height device bay numberingPower supply bay numbering Fan bay numberingInstalling the front components*: To prevent improper cooling and thermal damage, do not oper
7、ate the enclosure unless all bays are populated with a component or a blank.6*: Do not mix HP 2250W, HP 2400W High Efficiency, HP BL7000 2400W Platinum, or -48vDC power supplies in one enclosure. Install only one type of power supply in a single enclosure.If your HP BladeSystem c7000 Enclosure is eq
8、uipped with a three-phase power configuration, you need six power supplies. To install a power supply: 1. To gain access to all power supply bays, slide the HP BladeSystem Insight Display to the right or left as needed. 2. Remove the power supply blank.Insert the power supply into the enclosure, and
9、 then close the power supply bracket.NOTE: This document discusses installation of AC powersupplies only. For information on configuring DC powersupplies or HP Carrier Grade Solutions, see the documentation that came with your power supply.Add any ordered options to each server blade: o Additional p
10、rocessor o Additional memory o Mezzanine option cards(Optional) If you are installing a full-height device, remove the half-height device bay shelf. If you are installing a half-height device, omit this step.Remove the connector covers.Install the server or storage blades.Install device bay blanks i
11、nto any unused device bays. If the empty bays are configured for a full-height device, join two device bay blanks to create a full-height blank.Installing the rear components*: To prevent improper cooling and thermal damage, do not operate the enclosure unless all bays are populated with a component
12、 or a blank.Install fans in even-numbered groups, based on the total number of blades installed in the enclosure:o Four fan co nfiguration Fan bays 4, 5, 9, and 10 are used to support a maximum of two devices located in device bays2, 9, or 10. Only two device bays can be used with four fans. o Six f
13、an configuration Fan bays 3, 4, 5, 8, 9, and 10 areused to support devices in device bays 1, 2, 3, 4, 9, 10, 11, or 12. o Eight fan configuration Fan bays 1, 2, 4, 5, 6, 7, 9, and10 are used to support devices in all device bays.o Ten fan configurationAll fan bays are used to supportdevices in all d
14、evice bays.NOTE: When installing a fan in the top row of fan bays, orient the fan so that the LED is in the lower right corner. When installing a fan in the bottom row of fan bays, orient the fan so the LED is in the upper left corner.Install fan blanks in any unused fan bays.Install the Onboard Adm
15、inistrator with KVM modules into theOnboard Administrator with KVM tray based on the total number ordered:o One Onboard Administrator with KVM module: Bay 1 o Two Onboard Administrator with KVM modules: Bays 1 and 2Install an Onboard Administrator with KVM blank into any unused Onboard Administrator
16、 with KVM bay.Connecting the cablesIdentify all connectors.8To connect to the management network, connect a standard CAT5 patch cable to the OA/iLO port of each installed Onboard Administrator with KVM module.If more than one enclosure is installed in the rack, use a CAT5 patch cable to connect the
17、enclosure link-down port on the upper enclosure to the enclosure link-up port on the lower enclosure.NOTE: The enclosure link ports are designed only to support c-Class enclosures in the same rack. The enclosurelink-up port on the top enclosure is the service port, and the enclosure link-down port o
18、n the bottom linked enclosure is unused.NOTE: The HP BladeSystem c-Class enclosure link ports are not compatible with the HP BladeSystem p-Class enclosure link ports.Mapping to interconnect portsSeveral port types are referenced in the following tables. ? Examples of 1x ports are 1-Gb Ethernet (1 Gb
19、E) switch modules and Fibre Channel interconnect modules.? An example of a 2x port is a Serial Attached SCSI (SAS) interconnect module. (Reserved for future use.)?Examples of 4x ports are 10-Gb Ethernet (10 GbE) interconnect modules.NOTE: 1x and 2x port mezzanine cards interface with singlewide inte
20、rconnect modules. 4x port mezzanine cards interface with double-wide interconnect modules.The term “ 1x/2x refers to thenumber of interconnect lanes per port provided by the controller. The more lanes provided per port, the higher the data transmission rate coming from that port.Mapping half-height
21、bladesThe following table lists the available configurations for halfheight devices installed in device bay N (1C16).Connectivity to interconnect bays 7 and 8 is only available with four-port mezzanine cards or port 2 of 4x card in Mezzanine slot 2. Mapping full-height bladesThe following table list
22、s the available configurations for fullheight devices installed in device bay N (1C8).Connectivity to interconnect bays 7 and 8 is only available withfour-port mezzanine cards or port 2 of 4x card in Mezzanine slot 2.Mapping BL2x220c Blades910To support network connections for specific signals, inst
23、all aninterconnect module in the bay corresponding to the embedded NIC or mezzanine signals.Interconnect device mapping for double dense server bladesThe following table lists the available configurations for double dense server blades installed in device bay N (1-16).Interconnect device mapping for
24、 AMC Telco I/O expansion bladesThe following table lists the available configurations for AMC Telco I/O expansion blades installed in device bay N (1-16).Bay-to-bay crosslinksFour trace SerDes signals between adjacent bays are provided in the enclosure midplane to permit bay-to-bay communications. I
25、nterconnect modules can only connect horizontally.Device bay crosslinksDevice bay crosslinks are wired between adjacent horizontal device bay pairs.For half-height blades, these signals connect a four-lane PCIe module to a partner blade such as a tape blade or a PCI expansion blade. For full-height
26、blades, these signals are used to connect a PCIe module to a partner blade in the lower adjacent bay and require a PCIe pass-thru mezzanine card installed in mezzanine connector 3. The Onboard Administrator with KVM disables the device bay crosslinks when they cannot be used, such as when two server
27、 blades reside in adjacent device bays.Interconnect bay crosslinksInterconnect bay crosslinks are wired between adjacent interconnect bay pairs.You can enable these signals to provide module-to-moduleconnections, such as Ethernet crosslink ports between matching switches, or Virtual Connect modules
28、as stacking links. OnboardAdministrator with KVM disables the interconnect bay crosslinks when they cannot be used, such as when two different modules reside in adjacent horizontal interconnect bays.Installing interconnect modulesNOTE: For information on the location of LEDs and portson individual i
29、nterconnect modules, see the documentationthat ships with the interconnect module.1.Install the interconnect modules based on the number orderedand the number of fabrics in the configuration.The enclosure ships with interconnect bay dividers installed.Theinterconnect bay dividers must be removed bef
30、ore installingdouble-wide interconnect modules. To remove an interconnectbaythewasbay divider, press the release tab, and pull the interconnectdivider out of the enclosure.2.Install interconnect blanks in any unused interconnect bays.3.Connect each installed interconnect module to the external conne
31、ctions with the appropriate cable.Powering up the enclosureSingle-phase power configurationFor a single phase power configuration:1.Connect the AC power cables to the power connectors onrear of the enclosure corresponding to the power supply thatpopulated on the front of the enclosure.2.Be sure each
32、 power cable is securely attached to the power connectors.3.Connect the AC power cables to the AC power source orto aninstalled power distribution unit (PDU).4.Turn on the AC circuit breakers that power the powercablesinstalled in the enclosure.Locate the power retention bracket that came with the e
33、nclosure.Verify that the power cord retention tabs are on the correct side.o On the left side: To install the power cord retention bracket on the left side of the enclosure, ensure the power cord retention tabs are located to the right of the snap clamps.o On the right side: To install the power cor
34、d retention bracketon the right side of the enclosure, ensure the power cord retention tabs are located on the left side of the snap clamps.Place the power cord retention bracket under the power cords,and then align the power cords with the snap clamps.Open the snap clamps, and then insert each powe
35、r cord insideeach clamp.Slide the power cord retention bracket until the bracket touchesthe enclosure.1112Insert the power cord retention tabs into the slots on the enclosureuntil they snap into place.Slide each snap clamp over the end of each power cord overmold, and then squeeze each snap clamp cl
36、osed.Three-phase power configurationFor a three-phase power configuration, the AC power cables are already attached to the enclosure. To cable the enclosure using a three-phase AC configuration: 1. Connect the AC power cables to the AC power source. 2.Turn on the AC circuit breakers that power the p
37、ower cables installed in the enclosure.The installation is complete.Setting up the HP BladeSystem Insight DisplayTo identify the enclosure, the rear enclosure UID light and the background of the Insight Display are illuminated blue when theenclosure is powered on initially. When the enclosure is pow
38、ered up for the first time, the Insight Display launches an installation wizard to guide you through the configuration process. At the beginning of the installation, the wizard automatically powers on the enclosure UID. After the installation is complete, the wizard powers off the enclosure. After c
39、onfiguring the enclosure, the Insight Display verifies that thereare no installation or configuration errors. If errors are present, the Insight Display guides you through the process of correcting the errors. To set up an enclosure with network connectivity to the Onboard Administrator with KVM: 1.
40、On the Enclosure Settings screen, confirm the default settings. o Use the navigation arrows to navigate to a particular setting,and then press OK . o Navigate to the ? box next to a setting, and then to get help,press OK. 2. Confirm the Power mode for the power supplies, which is typically AC Redund
41、ant.If the facility must limit AC power to the enclosure below what the power supplies can draw, set the Power Limit.To provide the highest power efficiency without affecting server performance, enable Dynamic Power Savings.5.Record the OA1 and OA2 (if present) IP address. This information is needed
42、 when deploying the management software.o If the OA1 or OA2 IP address is ., set the address.Navigate to the address, and then press OK . Use the up and down arrows to select Static IP address. Use the up and down arrows on each field to set the IP, netmask, and gateway one octet at a time. P
43、ress OK, and then press OK again on Accept to confirm the new IP address settings. o If neither IP address is ., record the displayedaddress to use for remote login to the Onboard Administrator with KVM over the management network. 6. (Optional) Edit the Enclosure Name. The default value is t
44、he enclosure serial number.(Optional) Edit the Rack Name. The default value is UnnamedRack.Set the Insight Display PIN to prevent other users of the LCD from changing the settings.Select Accept All at the bottom of the Enclosure Settings, and then press OK to Accept all the settings to continue. If
45、you are setting up a single enclosure, proceed to step 11.10. Select Accept, and then press OK to apply the Enclosure Settings(Redundancy Mode, Limit AC, Power Savings, Rack Name, and Insight Display PIN) to other linked enclosures.Follow the instructions on the Check: Installation Cables screen, an
46、d then select Continue.Follow the instructions on the Blades Powering Up screen, andthen select Main Menu. 13. Open a browser and connect to the active Onboard Administrator with KVM module using the Onboard Administrator with KVM IP address that was configured during the Insight Display installatio
47、n wizard process. 14. Enter the user name and password from the tag supplied with the Onboard Administrator with KVM module to access the remote Onboard Administrator with KVM web interface and complete the Onboard Administrator with KVM first time installation wizard. To set up the enclosure withou
48、t network connectivity to the Onboard Administrator with KVM, see the Onboard Administrator User Guide. Installing the operating system for Gen8 servers ProLiant Gen8 blades do not ship with provisioning media. However, ProLiant Gen8 blades are preloaded with the media to manage and install the syst
49、em software and firmware. To operate properly, the blade must have a supported operating system. For the latest information on operating system support, see the HP website (/doc/5d1b9d7401f69e*- *27.html/go/supportos). To install an operating system on the blade, use one of the following methods: ?
50、Intelligent Provisioning The iLO Maagement Engine is a new feature on ProLiant blades that contains Intelligent Provisioning for embedded deployment, updating, and provisioning capabilities.Intelligent Provisioning can configure the blade and install an operating system, eliminating the need for Sma
51、rtStart CDs and Smart Update Firmware DVDs. To install an operating system on the blade with Intelligent Provisioning (local or remote): a. Ensure network connectivity and power on the blade. b. Through a remote control session, during server POST, press the F10. c. Complete the initial Preferences
52、and Registration portion of Intelligent Provisioning. d. At the Home screen, click the Configure and Install button. e. Follow the on-screen prompts to finish the installation. (To update the firmware and systems software, an Internet connection is required.)? Remote deployment installation UsInesig
53、ht Control serverdeployment for an automated solution to remotely deploy an operating system.For additional system software and firmware updates, download the HP Service Pack for ProLiant (SPP) from the HP website(/doc/5d1b9d7401f69e*-*27.html/go/spp/download).The Smart Update Firmware DVD ISO is al
54、so available at the download tab on the HP website (/doc/5d1b9d7401f69e*- *27.html/go/foundation).For information on using these installation methods, see the HP website (/doc/5d1b9d7401f69e*-*27.html/go/ilo).Installing the operating system forG7 serversTo operate properly, the server must have a su
55、pported operating system installed. For the latest information on supported operating systems, see the HP website (/doc/5d1b9d7401f69e*-*27.html/go/supportos). Methodsto install an operating system on the server include: ?SmartStart assisted installat ion Insert the SmartStart CD into the DVD- ROM drive and reboot the server.?Manual installation Insethrte operating system CD into the DVD-ROM drive and reboot the server. You might have to obtainadditional drivers and firmware from the SPP download site(/doc/5d1b9d7401f69e*-*27.html/go/spp/download).For more informatio
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 全案整裝合同范例
- 借款合同范本 個人
- 醫(yī)院保潔服務合同范本
- 五金合作合同范本
- 中介寄賣合同范本
- 單位廁所裝修合同范本
- 醫(yī)療家具清單購買合同范本
- 公司購買牛奶購銷合同范本
- 出租商用合同范本
- 十三薪標準合同范本
- 中山大學抬頭信紙中山大學橫式便箋紙推薦信模板a
- 皮膚性病學課件:濕疹皮炎
- 無形資產評估完整版課件
- 一體化學工服務平臺、人事管理系統(tǒng)、科研管理系統(tǒng)建設方案
- 市場營銷學課后習題與答案
- 常暗之廂(7規(guī)則-簡體修正)
- 10kV變電所設備檢修內容與周期表
- 制冷系統(tǒng)方案的設計pptx課件
- 修心七要原文
- 中國TBHQ行業(yè)市場調研報告
- 1資產負債表變動情況的分析評價
評論
0/150
提交評論