



下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、Installation guidePurpose of this guideThis guide contains information regarding the installation and safe handling of solar street lights. All instruction should be read and understood before attempting to install. If there are any questions, please contact our sales department for further explanat
2、ion. The installer should conform to all the safety precautions in the guide when and installing the lamps. Local codes should also be followed in such installation.Before installing the solar street light, the installer should become familiar with the mechanical and electrical requirement for such
3、a system. Keep this guide in a safe placefor future reference (care and maintenance) and in case of sale or disposal of all the solar street lightsGeneralThe solar street lamp installation is different from traditional one especially for solar paneland battery. The installationand constructionproced
4、ureis as below: locationselected,cementbasepouring,preparationin field(batteryplacing,solarpanelandbracketconnection), post assembling (threading, light installation, panels and brackets mounting),pole lifting, battery connection, controller fixed, post location re-checked, and final inspection.1. L
5、ocation selected.Field survey. Make sure no shelter around and enough lifted space (no high-tension cable surrounding).According to street lamp road installation standard and requirement, there are three decoration methods for fixing post. Unilateral, bilateral cross and bilateral symmetry three kin
6、ds. Post height are based on effective road width and decoration method, and separation distance are about the height and light illuminate angle (General is three timesof height)2.cement base pouring:(1). Embedded part dimension.Accordingto factoryprovidinginformationand our actual demand,we suggest
7、postheight and embedded items dimension as below:dimensionEmbedded partsScrewNo.Height ( m )( L*W*H ) mmdiagonal dimensionSignNotes( mm )Model14400400800220M182465005001000280M203686006001400360M2448128008001500400M285(2).Digging hole.According to embedded parts dimension to ensure hole size, especi
8、ally reserve enough place for battery. Details as below:(3). Cement base pouring.Use C20 standardconcreteto pour , andtamp cementbase heavily with bobbingmachine. When pouring,do not make concrete splash whereon screw rod to slow downinstallation. When threading PVC pipe, take as the drawing require
9、ments to make sure noconcrete inside. Noticethere is250mm gap between downpipe terminal to flat surface.Finally make sure the surface ishorizontal witha tester toensure four feet in the samelevel.Preparation :As the installation requirements, prepare all the necessary tools and list themTransport an
10、d carry all the components listed, and check the quantity and models one by one.Installation :1. Battery installation.Before operation, make sure battery models are the same as configuration listed (if a group, make sure connection method first. If in parallel, should not be over 4 pcs). Connect eac
11、h terminal firmly and place them in battery cabinet. Seal the cabinet well with screws to avoid water seepage. Next put the cabinet in the hole and cover or bury it. What doing it, choose a fine day. After burying finish, check the voltage whether normal or not.2. Mounting solar panel.Fix the panel
12、into the bracket firmly with screws and connect as the requirement(inseries or parallel).Afterconnection,make a test for the output voltage whether meet theinstallation. In general, the tested voltage should not lower than 18V in 12V system. If 24Vsystem, the voltage not lower than 36V.3. Post assem
13、blingCheck the installation position and direction. Confirm the length of wires stripping required. Each terminal should be peeled out 150mm in general. And then install lamp and check the position and levelness based on post. After wire connection, notice the positiveandnegativepolesand inspectterm
14、inalswhetherfixedhard.All thesedone shouldaccording to the drawing picture.After finish lamp installation, use a multimeter to test the resistance and check there in no ground connection with the pole body. And then connect the battery to do light test.4. Lifting.Before lifting, prepare all the nece
15、ssary tools, such as spray paint, Rohan pull, hammer, allen, screws and etc and clean the cement base. When lift the pole up to 1m high, .adjust direction of solar panel and fix it. Do make sure the direction face the south. Meanwhile, spray paint if possible.In the process of lifting, notice the sp
16、eed and direction,meantime, people should helppole up. Slowly drop the pole and give a right order to the hoist man. Keep screws symmetrical when tighten and use the Strength stem when fix M24 and above screws. The stem should not be less than 1.2m. Four feet should stand balance and upright.5. Cont
17、roller installation.Operate as the manual instruction, battery connection first, load (light) second (light on or not, if on, check and change new one), solar panel last (observe light status. if off is normal. Some kinds have delayed function, off delayed for 3-5minutes is normal). When operation all these, do not mis-connect positive and negative terminals so as not to shock or destroy circuit. Close inspection window well.6.Post location re-checked.Finish above operations,re-check the post balance and stand level. Meantime, doantiseptic treatment
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 離婚調(diào)取征地協(xié)議合同
- 砼結(jié)構(gòu)構(gòu)件銷售合同協(xié)議
- 租地作廢合同協(xié)議范本
- 瑜伽合同退款協(xié)議范本
- 石子廠轉(zhuǎn)讓合同協(xié)議
- 一年級(jí)第二學(xué)期教學(xué)工作計(jì)劃
- 銷售放款合同協(xié)議
- 工業(yè)廢料買賣合同協(xié)議
- 社保解除勞動(dòng)合同協(xié)議
- 石廠承包生產(chǎn)合同協(xié)議
- 資助感恩教育主題班會(huì)ppt課件(圖文)
- 多模態(tài)視域下北京市核心區(qū)語言景觀研究
- 《單軸面筋脫水機(jī)設(shè)計(jì)報(bào)告(論文)》
- 內(nèi)分泌系統(tǒng) 腎上腺 (人體解剖生理學(xué)課件)
- GPS靜態(tài)數(shù)據(jù)觀測(cè)記錄表
- 山西省城鎮(zhèn)教師支援農(nóng)村教育工作登記表
- 軟件項(xiàng)目周報(bào)模板
- 著名中醫(yī)婦科 夏桂成教授補(bǔ)腎調(diào)周法
- VSM(價(jià)值流圖中文)課件
- 考古發(fā)掘中文物的采集與保存課件
- 人工氣道的護(hù)理劉亞課件
評(píng)論
0/150
提交評(píng)論