生產(chǎn)指標(biāo)簡(jiǎn)介_第1頁(yè)
生產(chǎn)指標(biāo)簡(jiǎn)介_第2頁(yè)
生產(chǎn)指標(biāo)簡(jiǎn)介_第3頁(yè)
生產(chǎn)指標(biāo)簡(jiǎn)介_第4頁(yè)
生產(chǎn)指標(biāo)簡(jiǎn)介_第5頁(yè)
已閱讀5頁(yè),還剩10頁(yè)未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、DMAIC Problem-Solving e-Program (Session A)CA ED - Apr 2007.6. Training Method7. Training Measurement Criteria8. Training Discipline 9. Application FormOutline1.Background2.Objectives 3. Training Schedule4. Training Software5. Coach group.1. Background In order to enhance our Engineer staffs Problem

2、- Solving skills, based on each departments requirements, ED launched Problem-Solving e-Program on Mar.2007.2. Objectives Equip participants with problem-solving skills to effectively manage strategically aligned projects. Offers a general conceptual framework to integrate different skills, and incl

3、udes alternative methods for determining the appropriate solution, and applying guidelines for analyzing a task or problem in order to solve it.3. Training Schedule.DMAIC Problem-Solving4. Training Software - bought from USA.5. Coach group Internal recognized Six-Sigma black belt/green belt Veteran

4、engineering professionals.6. Training Method case-based learning Basic Theory Project Design Group Discussion (case/problem based) Seminar & Sharing (Expert involved in)Training Medium:English.7. Training Measurement Criteria CriteriaWeight rate Assessment methods Attendance Necessary conditionAsses

5、sed by ED program coordinator Group Discussion 30% Assessed by Coach group and professionalsIndividual Project (real life case)40% Assessed by direct manager, Coach group and professionalsSharing & transfer contribution 30%Assessed by direct manager.I) Attendance 70 % of attendance rate is the prere

6、quisite for completing DMAIC Problem-Solving e-Program. Participants could apply no more than 2 days leave in written format with the approval of their direct manager. Application should submit to the ED prior to the lecture. II) Group PresentationParticipants are required to hand in one related rea

7、l life case, and complete group assignments during the lecture. Their on-going performance will be assessed by Coach group .7. Training Measurement Criteria.III) Individual PresentationAt least one individual project from daily working, which to be solved during this training. The topic of individua

8、l project should be discussed and agreed by the trainee and his/her direct manager and coach team. The presentation will be assessed according to the participants preparation, the presentation manner, and the ability to transfer the knowledge into working environment.IV) Sharing & transfer contribut

9、ion Sharing & transfer contribution will be assessed by direct managers within three months, in which the assessment is supposed to be a continuous process and needs a long term support.7. Training Measurement Criteria.To make the training run smoothly, the participants shouldobey the following rule

10、s:DepositEach trainee is required to hand in a deposit of RMB200, which will be kept by ACCT. It will be returned as long as the trainee finishes the whole training and pass the final evaluation.Any one who absents twice without notice; resign or exit the training before the training finished, misse

11、s the final test will be rejected to return the 200 RMB deposit; Anyone who fails in the final test will be deducted 50 RMB deposit. Evaluation RecordAnyone whose attendance rate is lower than 70% will be not allowed to attend the final evaluation.Passing the final evaluation and with an attendance

12、above 70% will be regarded as finishing the training successfully. 8. Training Discipline.Class disciplineTrainees are required to sign the attendance form each time before the class. Be sure not to sign for others. Trainees should arrive at class on time. Being 15mins late or leave early will be regarded as absence. If trainee has to ask for leave , he or she should in advance inform the trainer by phone or and hand in the leave note (with superiors signature) before the next class. Without the leave note, it will be regarded as absence.Advised to turn off cell phone or

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論