版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、設(shè)計(jì)總闡明本設(shè)計(jì)為華通產(chǎn)業(yè)園1號(hào)樓日勺施工籌劃。投標(biāo)文獻(xiàn)日勺編制,貫徹執(zhí)行了國(guó) 家及地方有關(guān)工程建設(shè)日勺政策和法規(guī),符合國(guó)家現(xiàn)行日勺建筑工程建設(shè)原則、設(shè) 計(jì)規(guī)范和制圖原則以及擬定投資勺有關(guān)指標(biāo)、清單計(jì)價(jià)措施和費(fèi)用原則勺規(guī)定。華通產(chǎn)業(yè)園1號(hào)公寓樓共一種單元,所有為地上層,主體為六層,另在六 層上有兩間水房間。建筑高度29.8米,住宅層高3.2米。耐火材料為一級(jí),設(shè) 計(jì)級(jí)別為二級(jí),六度抗震設(shè)防,設(shè)計(jì)使用年限50年。工程構(gòu)造形式為框架構(gòu)造, 基本采用獨(dú)立基本和條形基本。建筑施工圖和構(gòu)造施工圖齊全。本設(shè)計(jì)涉及兩大部分,一部分是計(jì)算部分,其中涉及工程量計(jì)算書(shū)、綜合 單價(jià)分析表、工程量清單計(jì)價(jià)文獻(xiàn)、工程進(jìn)
2、度計(jì)算書(shū)、施工進(jìn)度籌劃表和施工 平面布置圖;另一部分是文字闡明部分,即設(shè)計(jì)闡明書(shū),重要涉及投標(biāo)報(bào)價(jià)、 施工組織設(shè)計(jì)和成本控制勺研究。計(jì)算部分勺重要內(nèi)容是對(duì)建筑工程、裝飾裝修工程費(fèi)用勺計(jì)算。工程費(fèi)用 由分部分項(xiàng)工程費(fèi)、措施項(xiàng)目費(fèi)、其她項(xiàng)目費(fèi)、規(guī)費(fèi)和稅金構(gòu)成,并且以計(jì)算 出來(lái)勺價(jià)格作為擬定工程各階段成本控制勺根據(jù)。編制完畢勺施工圖預(yù)算文獻(xiàn)將作為工程進(jìn)度計(jì)算書(shū)編制勺重要根據(jù)。對(duì)工 程各階段勺費(fèi)用支出進(jìn)行系統(tǒng)勺掌握,對(duì)人材機(jī)消耗量進(jìn)行綜合分析,以便在 施工階段進(jìn)行更加合理勺成本控制。文字闡明部分重要是設(shè)計(jì)闡明書(shū)勺撰寫(xiě),設(shè)計(jì)闡明書(shū)勺內(nèi)容重要涉及商務(wù) 標(biāo)(投標(biāo)報(bào)價(jià))設(shè)計(jì),技術(shù)標(biāo)(施工組織設(shè)計(jì))設(shè)計(jì),及施工
3、籌劃勺研究。投標(biāo)報(bào)價(jià)結(jié)合華通產(chǎn)業(yè)園1號(hào)樓日勺設(shè)計(jì)方案,重要簡(jiǎn)介了本工程投標(biāo)報(bào)價(jià)日勺編制根 據(jù)、投標(biāo)報(bào)價(jià)日勺編制措施和投標(biāo)報(bào)價(jià)日勺擬定。施工組織設(shè)計(jì)一方面簡(jiǎn)介了本工程日勺工程概況,通過(guò)對(duì)工程概況日勺研究,做出工程施工 方案、主體工程和裝飾裝修工程施工措施,以及施工進(jìn)度、質(zhì)量和安全控制等 各項(xiàng)措施。施工階段勺成本控制先分析國(guó)內(nèi)現(xiàn)行階段在施工階段成本控制過(guò)程中存在勺問(wèn)題,然后根據(jù)這 些問(wèn)題提出某些解決措施,為施工公司做到效益最大化。核心詞:投標(biāo)報(bào)價(jià),施工組織設(shè)計(jì),成本控制General Instruction of DesignThe design of Station Street West Di
4、strict? building project cost control in construction stage. Bid document preparation, implementation of the national and local projects related policies and regulations, consistent with current national building engineering construction standard, design specification and drawing standards and deter
5、mine the investment related index, method of detailed list valuation and cost standards.Museum Station Street West Area Project No. 7 is a unit, on a total of16 layers, wherein the ground a two layer for commercial service outlets, three to sixteen storeys for residential,2 layer underground storage
6、 rooms,2 floors below ground and garage connected, building height 48.90 meters,2.80 meters tall residential building. Refractory material for one class, design of grade two, six degree earthquake, design service life of 50 years. Engineering structure for the shear wall structure, foundation with p
7、ile foundation. Construction drawings and structural drawings complete.The design includes two parts, one part is calculated, including the engineering quantity calculation, reinforced the list of ingredients, integrated unit price analysis table, valuation of project volume detailed list file and p
8、roject schedule calculations; another part is the text part, namely the design specifications, including bidding, construction organization design and cost control research.Calculation of components of the main contents of construction engineering, decoration engineering cost calculation, cost of pr
9、oject by project fee, measures theproject cost, project cost, fees and taxes of other components, and the calculated price as determined in all stages of project cost control based on.Completed the construction drawing budget document will serve as the progress of the project statement compiling imp
10、ortant basis, on all stages of project cost system control in construction stage, so that more reasonable cost control.Text part is mainly the design specification writing, design content mainly includes the business standard (bid) design, technical standard (construction organization design) design
11、, and cost control research.biddingPavilion Station Street Building 7West area project design, mainly introduced the engineering bid quotation compilation basis, compilation of bidding quotation method and determination of quoted price for bidding.the construction organization designFirst introduced
12、 the project profiles, based on the engineering research, make the construction scheme, main works and decoration works construction methods, as well as the construction progress, quality and safety control measures.the cost control of the construction phaseThe first analysis of Chinas current stage
13、 in the construction stage of cost control problems that exist in the process, and then according to these issues and propose some solutions. Good for construction enterprises to maximize the benefits.Key words : bidding, construction organization design, cost control目錄設(shè)計(jì)總闡明錯(cuò)誤!未定義書(shū)簽。General Instruction of Design錯(cuò)誤!未定義書(shū)簽。第一章引言錯(cuò)誤!未定義書(shū)簽。1.1設(shè)計(jì)課題日勺提出錯(cuò)誤!未定義書(shū)簽。1.2國(guó)內(nèi)外研究現(xiàn)狀錯(cuò)誤!未定義書(shū)簽。1.2.1國(guó)內(nèi)現(xiàn)狀錯(cuò)誤!未定義書(shū)簽。1.2.2國(guó)外現(xiàn)狀錯(cuò)誤!未定義書(shū)簽。1.3研究思路和措施錯(cuò)誤!未定義書(shū)簽。第二章華通產(chǎn)業(yè)園1號(hào)樓投標(biāo)報(bào)價(jià)勺編制錯(cuò)誤!未定義書(shū)簽。2.1華通產(chǎn)業(yè)園1號(hào)樓投
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五版房屋買(mǎi)賣(mài)合同中的房屋抵押及解押約定3篇
- 二零二五河南事業(yè)單位100人招聘項(xiàng)目合同執(zhí)行標(biāo)準(zhǔn)3篇
- 二零二五版建筑工程項(xiàng)目現(xiàn)場(chǎng)勘察與監(jiān)測(cè)服務(wù)合同3篇
- 二零二五版混凝土結(jié)構(gòu)防雷接地施工合同2篇
- 二零二五年度草場(chǎng)承包管理與開(kāi)發(fā)合同范本3篇
- 二零二五版國(guó)際貿(mào)易實(shí)務(wù)實(shí)驗(yàn)報(bào)告與國(guó)際貿(mào)易實(shí)務(wù)實(shí)訓(xùn)合同3篇
- 二零二五年度虛擬現(xiàn)實(shí)(VR)技術(shù)研發(fā)合同3篇
- 二零二五年度特種貨物安全運(yùn)輸服務(wù)合同范本2篇
- 二零二五年度體育設(shè)施建設(shè)與運(yùn)營(yíng)管理復(fù)雜多條款合同3篇
- 二零二五年度電梯門(mén)套安裝與安全性能檢測(cè)合同3篇
- 山東省濰坊市2023-2024學(xué)年高二下學(xué)期期末考試 歷史 含解析
- 中醫(yī)診療規(guī)范
- 報(bào)建協(xié)議書(shū)模板
- 第14課《葉圣陶先生二三事》導(dǎo)學(xué)案 統(tǒng)編版語(yǔ)文七年級(jí)下冊(cè)
- 貴州省2024年中考英語(yǔ)真題(含答案)
- 施工項(xiàng)目平移合同范本
- 北師大版八年級(jí)上冊(cè)數(shù)學(xué)期中綜合測(cè)試卷(含答案解析)
- 幼兒園創(chuàng)意美勞培訓(xùn)
- 同濟(jì)大學(xué)第四版線(xiàn)性代數(shù)課后習(xí)題答案
- 醫(yī)療領(lǐng)域人工智能技術(shù)應(yīng)用的倫理與法規(guī)
- 工地春節(jié)停工復(fù)工計(jì)劃安排
評(píng)論
0/150
提交評(píng)論