1、stimulation test of sidetracking horizontal well with turning on super-short radius in NB field北布扎奇油田短半徑側(cè)鉆水平井增產(chǎn)試驗(yàn)綱要1 水平井是上世紀(jì)80年代以后世界上快速發(fā)展的一項(xiàng)新型開(kāi)發(fā)技術(shù).特別是老井開(kāi)窗側(cè)鉆水平井技術(shù)的發(fā)展和短半徑水平井鉆井技術(shù)的成熟不但使水平井鉆井成本大大降低,并且更有利于淺井的機(jī)械采油作業(yè),可滿(mǎn)足淺層井的抽油泵的泵掛深度,因此,舊井開(kāi)窗短半徑水平井技術(shù)目前已做為成熟技術(shù)在世界油氣田的開(kāi)發(fā)中廣泛應(yīng)用于老油田的增產(chǎn)中。 In 1980s, HW technologies a
2、s a new method developed very quickly in the world, especially sidetrack HW by slotting in old well and super-short radius HW which decreased drilling cost and also made for mechanical production of shallow well , that means in shallow well the traditional pump also can be used to pump oil though th
3、e well in very low fluid level. Now sidetrack HW by slotting in old well with short radius being an good way has already been applied widely in development of old well stimulation in oil and gas field of the world .1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test側(cè)鉆水平井技術(shù)概述 Brief int
4、roduction of sidetrack HW technology21.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test利用停產(chǎn)報(bào)廢井開(kāi)采平面剩余油;to produce remaining oil in plain ?in wells shut in or abandoned.開(kāi)采停產(chǎn)報(bào)廢井中的薄油層或低滲油層,提高開(kāi)發(fā)效益. To develop thin layer or oil formation with low permeability of wells shut in or abandoned.
5、稠油油藏的開(kāi)采 to produce in sticky reservoir.側(cè)鉆水平井技術(shù)概述 Brief introduction of sidetrack HW technology3advantage 1(優(yōu)點(diǎn)1:)井眼橫向穿過(guò)油層, 井眼在油層中具有很大的裸露面積,油井生產(chǎn)時(shí)的生產(chǎn)壓差小,壓力涉及面大,產(chǎn)量高; bore hole drills through oil formation in parallel. With a big bare area. Producing pressure difference of Producer is small but exists in
6、 big area that get high production.垂直井泄油面積drainage area in vertical well水平井泄油面積drainage area in HW1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test側(cè)鉆水平井技術(shù)概述 Brief introduction of sidetrack HW technology4Advantage(優(yōu)點(diǎn)): 2對(duì)底水油藏有較高的臨界采油速度,有利于底水油藏的高速開(kāi)采 For reservoir with bottom water, it
7、 has a higher critical oil recovery rate , which is good for producing at high speed .垂直井水錐形式water coning in vertical well水平井水錐形式water coning in HW1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test側(cè)鉆水平井技術(shù)概述 Brief introduction of sidetrack HW technology5Advantage(優(yōu)點(diǎn)):3尤其是對(duì)薄層油層,可大大提高油井
8、產(chǎn)量。Especially for thinner layer, production rate can be greatly increased.1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test側(cè)鉆水平井技術(shù)概述 Brief introduction of sidetrack HW technology6利用超短半徑水平井技術(shù)挖掘目前低產(chǎn)井的生產(chǎn)潛力 To tap potential of dog wells with super-short R HW.自2003年以來(lái),油田有近19口井處于長(zhǎng)期低產(chǎn)或停產(chǎn)狀態(tài)
9、,占油田生產(chǎn)總井?dāng)?shù)的47%.用各種方式挖掘這些低產(chǎn)井的潛力對(duì)油田開(kāi)發(fā)效益非常重要.Since 2003, there are about 19 wells in low production for long time or stopping production, accounting 47% of whole wells in the field. To tap potential of these dog wells with methods is critical for field development benefit.1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of S
10、uper-short Radius Sidetrack HW Test在北布扎奇油田開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的The reason of Super-short Radius Sidetrack HW in NB7為北布扎奇油田薄油層和底水油層的開(kāi)采尋找高效的開(kāi)采方法To find an efficiency producing method for thinner oil layer and oil formation with bottom water.白堊系油藏的油層主要以薄層和薄層底水稠油油藏為主,有32%的儲(chǔ)量用現(xiàn)有技術(shù)開(kāi)發(fā)效率不高和難以開(kāi)發(fā). Pay zones of K ma
11、inly consist of thinner oil layer and sticky thinner oil formation with bottom water. 32% of reserve cant be produced or produced hardly by present development technology.Transgressive Lag Shallow Marine to Non-Marine Low Energy - “Wealdon” Type- Includes Seismically Definable ChannelsAs Neo B but l
12、ess “Sandy”Shallow Marine Sand BodiesNeo. ANeo. BNeo. CNeo. D5.2小層subzone厚度thickness(m)地層特征strata40.925.646.71.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test在北布扎奇油田開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的The reason of Super-short Radius Sidetrack HW in NB8為北布扎奇油田薄油層和底水油層的開(kāi)采尋找高效的開(kāi)采方法To find an efficiency pr
13、oducing method for thinner oil layer and oil formation with bottom water.侏羅系的主力油層多數(shù)存在邊/底水,常規(guī)直井技術(shù)開(kāi)發(fā),邊/底水錐井快,油井很快水淹,開(kāi)發(fā)效果差. The most of main pay zone of J has edge/bottom water. With traditional vertical well developing, edge/bottom water cones very quickly. Producer is water out fast. And get bad deve
14、lopment effects.射孔井段perfs底水bottom water在北布扎奇油田開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的The reason of Super-short Radius Sidetrack HW in NB1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test9以住北布扎奇油田水平井試驗(yàn)的效果評(píng)估 evaluation of previous HW test of NB field99年6月到7月,北布扎奇油田先后在&斷塊的侏羅系油藏各鉆了一口水平井(NB3&NB4)in June 7, 1999,
15、 NB3&NB4 HW, in block &, were drilled in J of NB field successively Conductor 導(dǎo)管15m133/8Surface casing 表層套管170m95/8;Intermediate Casing 技術(shù)套管219mm下至800斜向井段;run intermediate casing of 219 mm to the point of hole angle of 80 NB3NB4切割縫繞絲篩管礫石充填完井slotted wire wrapped screen and gravel completion打孔管礫石充填完井s
16、creen and gravel completion1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test10以住北布扎奇油田水平井試驗(yàn)的效果評(píng)估 evaluation of previous HW test of NB field1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test11Top J10BTop J20, Strat. floor to oilBase CretaceousDeeper horizons not shown
17、NB-3Z welltrackNB-3Y welltrackBlock 6 OWC-482mGOC -432mNB-3 J10CJ10BDecrease in SwIncrease in Porosity以住北布扎奇油田水平井試驗(yàn)的效果評(píng)估 evaluation of previous HW test of NB field1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test12以住北布扎奇油田水平井試驗(yàn)的效果評(píng)估 evaluation of previous HW test of NB field1.開(kāi)展短半徑側(cè)
18、鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test13NB-4Z WellpathTop J20 Surfaceabove OWCOWC surface-525m tvdss以住北布扎奇油田水平井試驗(yàn)的效果評(píng)估 evaluation of previous HW test of NB field1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test14NB-4NB-2NB-4Z WellpathTop J20Top J10BTop J20BDecrea
19、se in SwIncrease in PorosityDecrease in SwIncrease in PorosityDepth Cross Section along NB4Z WellpathBlock 7 OWC-525m以住北布扎奇油田水平井試驗(yàn)的效果評(píng)估 evaluation of previous HW test of NB field1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test15以住北布扎奇油田水平井試驗(yàn)的效果評(píng)估 evaluation of previous HW test of N
20、B field1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test16NB3井產(chǎn)量不高最可能的原因是繞絲篩管過(guò)細(xì),造成管外油泥污染堵塞,使其產(chǎn)量大幅度下降.the most possible reason for low production rate of NB3 is over-slim of the wire wrapped screen, outside of which is blocked by oil and silt and then cause big production rate declin
21、e.以住北布扎奇油田水平井試驗(yàn)的效果評(píng)估 evaluation of previous HW test of NB field1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test17NB4井含水上升過(guò)快的原因是水平段末端距油水界面過(guò)近,底水上竄造成的. The reason of water cut increasing over-fast of NB4 is of bottom water crossing upward for too short distance between the end of hori
22、zontal interval and WOC .NB-4NB-2NB-4Z WellpathTop J20Top J10BTop J20BDecrease in SwIncrease in PorosityDecrease in SwIncrease in PorosityDepth Cross Section along NB4Z WellpathBlock 7 OWC-525m以住北布扎奇油田水平井試驗(yàn)的效果評(píng)估 evaluation of previous HW test of NB field1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radi
23、us Sidetrack HW Test18結(jié)論:雖然NB3、NB4水平井的生產(chǎn)效果不是最佳,但其生產(chǎn)結(jié)果已經(jīng)反映出了水平井在北布扎奇油田的開(kāi)發(fā)比垂直井有較大的優(yōu)勢(shì)。通過(guò)精心優(yōu)化水平井段的地質(zhì)設(shè)計(jì),精心控制水平井段的軌跡,選擇適用于油藏特點(diǎn)的完井方式,水平井技術(shù)必將能大大提高北布扎奇油田的開(kāi)發(fā)效果。因此,在總結(jié)以往水平井試驗(yàn)經(jīng)驗(yàn)的基礎(chǔ)上,利用老井側(cè)鉆技術(shù)再次進(jìn)行水平井試驗(yàn)是非常必要的。Conclusion:Though the development effect of NB3 and NB4 was not the best one, as to NB field development,
24、it shows that horizontal well has advantage over vertical well. With optimizing geological design of horizontal interval, controlling well track of horizontal interval and selecting completion method suitable for reservoir characteristic, HW technology could improve development effect of NB field gr
25、eatly. So on the basis of previous HW experience, it is necessary for us to conduct HW test by side track of old well.以住北布扎奇油田水平井試驗(yàn)的效果評(píng)估 evaluation of previous HW test of NB field1.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的目的1.Purpose of Super-short Radius Sidetrack HW Test192.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short
26、-radius side track HW testtest principle(試驗(yàn)原則):充分利用老井開(kāi)窗側(cè)鉆水平井技術(shù),利用油田已經(jīng)停產(chǎn)或低產(chǎn)無(wú)效益的井進(jìn)行水平井技術(shù)試驗(yàn),一方面大大節(jié)省試驗(yàn)費(fèi)用,一方面使停產(chǎn)或低產(chǎn)無(wú)效益井發(fā)揮效益。Make full use of slotted side track HW technology in old well shut in or low production rate, save test cost and re-active dog wells and well shut in.根據(jù)油藏特點(diǎn)和應(yīng)用水平井技術(shù)最終要實(shí)現(xiàn)的開(kāi)發(fā)目的,采用先易用后
27、難的原則進(jìn)行側(cè)鉆水平井增產(chǎn)試驗(yàn):先在侏羅系油藏有邊底水的部位試驗(yàn)邊、底水油藏水平井的開(kāi)發(fā)效果,取得成功經(jīng)驗(yàn)后再開(kāi)展薄油層水平井增產(chǎn)試驗(yàn)。Test in reservoir with edge/bottom water of J first, and then at thinner oil formation.為在投資最少的情況下,盡快取得試驗(yàn)效果,鉆井工藝各環(huán)節(jié)盡量采用成熟的技術(shù)。Adopt mature technology during drilling and completion.20根據(jù)試驗(yàn)原則,初步選擇NB30、NB31兩口高含水井做為首批側(cè)鉆水平井試驗(yàn)井: based on te
28、sting principle, NB30 and NB31 conduct side track first.2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test試驗(yàn)初步設(shè)計(jì)(preliminary design of test)1、首批側(cè)鉆井位的選擇(first round well location selection):21Jurassic Current Perforations2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about sho
29、rt-radius side track HW test試驗(yàn)初步設(shè)計(jì)(preliminary design of test)1、首批側(cè)鉆井位的選擇(first round well location selection):22Jurassic Current Perforations2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test試驗(yàn)初步設(shè)計(jì)(preliminary design of test)1、首批側(cè)鉆井位的選擇(first round well location selecti
30、on):232.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test試驗(yàn)初步設(shè)計(jì)(preliminary design of test)1、首批側(cè)鉆井位的選擇(first round well location selection):242.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test試驗(yàn)初步設(shè)計(jì)(preliminary design of test)1、首批側(cè)鉆井位的選擇(first
31、 round well location selection):25Section 1Section 2Section 32.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test試驗(yàn)初步設(shè)計(jì)(preliminary design of test)1、首批側(cè)鉆井位的選擇(first round well location selection):26NB-10NB-31100 MetresTrue scale depth cross section, NB-10 to NB-31(see next
32、 slide for detail/legend)Section 1試驗(yàn)初步設(shè)計(jì)(preliminary design of test)1、首批側(cè)鉆井位的選擇(first round well location selection):2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test27NB-10NB-31Depth Cross Section through NB-10 and NB-31 Showing Hydrocarbon ContactsGOC -436mOWC -482mCl
33、aystone rich base to J10B (CVX Interpretation)Decrease in SwIncrease in PorosityTop J10CTop J20BTop J10BTop J20Section 12.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test試驗(yàn)初步設(shè)計(jì)(preliminary design of test)2、地質(zhì)靶區(qū)方案1示意圖(geological target area):28Section 2200 MetresOWC -482m
34、GOC -436m tvdssTop J10CTop J10BTop J20NB-31Claystone rich base to J10B (CVX Interpretation)Decrease in SwIncrease in PorosityWestward2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test試驗(yàn)初步設(shè)計(jì)(preliminary design of test)2、地質(zhì)靶區(qū)方案2示意圖(geological target area):29Section 3200 Me
35、tresGOC -436m tvdssTop J10CTop J10BTop J20NB-31Decrease in SwIncrease in PorosityOWC -482mClaystone rich base to J10B (CVX Interpretation)West-southwestward試驗(yàn)初步設(shè)計(jì)(preliminary design of test)2、地質(zhì)靶區(qū)方案3示意圖(geological target area):2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track H
36、W test30鉆井方式:老井開(kāi)窗側(cè)鉆水平段方式鉆井drilling way: slotted side track HW in old well2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test試驗(yàn)初步設(shè)計(jì)(preliminary design of test)3、鉆井工藝方案(drill program):31完井方式:方案1:采用114.3mm割縫篩管半程固井完井方式half cementing and slotted screen2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main t
37、rain of thoughts about short-radius side track HW test試驗(yàn)初步設(shè)計(jì)(preliminary design of test)3、鉆井工藝方案(drill program):32完井方式:方案2:采用127mm割縫篩管完井方式 slotted screen completion2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test試驗(yàn)初步設(shè)計(jì)(preliminary design of test)3、鉆井工藝方案(drill program)
38、:33完井方式:方案3:采用114.3mm固井射孔完井方式completion: cementing and perforating 2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test試驗(yàn)初步設(shè)計(jì)(preliminary design of test)3、鉆井工藝方案(drill program):34試驗(yàn)初步設(shè)計(jì)(preliminary design of test)3、鉆井工藝方案(drill program):完井方式:方案4:采用114.3mm割縫篩管封隔器完井方式slotted
39、 screen and packer completion2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test35試驗(yàn)初步設(shè)計(jì)(preliminary design of test) 4、鉆井設(shè)備( drilling equipment):鉆機(jī)載荷既要能夠滿(mǎn)足鉆進(jìn)、下套管作業(yè)要求,又要具備一定的處理復(fù)雜(阻、卡)的能力;drilling rig load meets the requirement of drilling and running casing and deal with b
40、lock.要滿(mǎn)足水平井鉆井對(duì)凈化裝置及循環(huán)系統(tǒng)要求;meet the requirement of slurry purification device and circulation system.固控系統(tǒng)要求配備振動(dòng)篩、除砂器和除泥器等三級(jí)凈化裝置及循環(huán)系統(tǒng),配備3個(gè)30m3鉆井液循環(huán)罐和1個(gè)沉砂罐,以便控制和維護(hù)鉆井液性能,并做好環(huán)境保護(hù)。Shale shaker, desander, desilter, 3 slurry circulating tank and 1 tank for sand settlement.鉆機(jī)的額定載荷要大于500KN。因此,要求采用鉆深能力為1000150
41、0m的輕型鉆機(jī)設(shè)備??蛇x用XJ450車(chē)載鉆井(修井)兩用鉆機(jī)或根據(jù)當(dāng)?shù)貙?shí)際情況,選用俄羅斯生產(chǎn)的A-60/80修井機(jī)和A-50修井機(jī)。Drilling rig should be drill about 1500m. XJ450 rig or A-60/80 and A-50 work over rig.2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test36試驗(yàn)初步設(shè)計(jì)(preliminary design of test) 5、服務(wù)方式(. service method):(1)全井技
42、術(shù)服務(wù)(turn key contract)采用全井承包方式,包括鉆井隊(duì)、套管開(kāi)窗側(cè)鉆水平井技術(shù)服務(wù)、泥漿、固井完井等。Including drilling crew, slotting in casing, slurry, cementing and completion (2)套管開(kāi)窗側(cè)鉆及造斜點(diǎn)以下井段的技術(shù)服務(wù)。milling in casing and technical services below kickoff point中國(guó)新疆鉆井研究院在短半徑水平井方面擁有完善成套的鉆井、完井技術(shù),已在中國(guó)新疆克拉瑪依淺層稠油油田上鉆了大量的淺層短半徑側(cè)鉆水平井。擁有豐富的鉆井設(shè)計(jì)和施工經(jīng)
43、驗(yàn),建議一旦開(kāi)始試驗(yàn),由中國(guó)新疆克拉瑪依油田鉆井工藝研究院承擔(dān)技術(shù)服務(wù)。Drilling and completion technology of Xinjiang drilling institue is competent for side track in NB.2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test37試驗(yàn)初步設(shè)計(jì)(preliminary design of test) 6、鉆井工期測(cè)算(time schedule of drilling)序號(hào)No.鉆頭尺寸bit s
44、ize(mm)施工作業(yè)項(xiàng)目 operating 計(jì)劃時(shí)間plan days(天)累計(jì)時(shí)間accumulative days(天)1149.2送入斜向器,陀螺定向trip in whipstock, gyroscope surveying0.50.5開(kāi)窗和修復(fù)窗口Milling window and repair window1.01.52149.2增斜段鉆進(jìn)、輔助drill angle building interval2.03.53149.2水平段鉆進(jìn)(300m)、輔助 drill horizontal interval 3.06.5下篩管、下油管、裝采油樹(shù)run screen ,tubin
45、g, install x-tree2.59.02.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test38試驗(yàn)初步設(shè)計(jì)(preliminary design of test) 7、工程報(bào)價(jià)( project quote):項(xiàng)目名稱(chēng)item金額(萬(wàn)美元)amount(10,000 US$)鉆井工程費(fèi)用drilling cost鉆機(jī)費(fèi)用rig2.5鉆頭費(fèi)用、鉆具費(fèi)用bit and drilling tool1.0泥漿費(fèi)用slurry3.8開(kāi)窗側(cè)鉆水平井工具及技術(shù)服務(wù)費(fèi)用tool for milli
46、ng window side track and technical services9.0完井費(fèi)用completion cost114.3mm半程固井完井half cementing127mm割縫篩管完井slotted screen completion固井射孔完井(不含射孔費(fèi)用)perforating completion采用114.3mm割縫篩管封隔器完井方式 slotted screen and packer completion8.57.03.57.5總費(fèi)用total24.823.318.523.82.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts a
47、bout short-radius side track HW test39試驗(yàn)初步設(shè)計(jì)(preliminary design of test): 8、水平井產(chǎn)能和經(jīng)濟(jì)效益估算(W production capability and economic benefit estimation):2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test按以下兩種假設(shè)條件保守估算了側(cè)鉆水平井的產(chǎn)量和效益: based on following 2 assumptions to predict prod
48、uction rate and benefit of side track well .1.側(cè)鉆后,水平井的產(chǎn)液量仍為目前油井產(chǎn)液水平,含水率下降至20%,年產(chǎn)油遞減率和含水上升率均為5%;1.After side track, fluid production rate is same as present fluid production level, water cut decreasing to 20%, both yearly decline rate and water increasing rate are 5%.2.側(cè)鉆后,水平井的產(chǎn)液量比目前提高一倍,含水率下降至20%,年產(chǎn)
49、油遞減率和含水上升率均為5%;2.After side track, fluid production rate increasing one times of current one. Water cut decreasing to 20%, both yearly decline rate and water increasing rate are 5%.3.原油銷(xiāo)售油價(jià)為23.35$/bbl,操作成本為8$/bbl. 3.Oil sale price unit is 23.35$/bbl, operating cost is 8$/bbl.Now:NB31:Ql=587bbl/d; Qo
50、=84bbl/d;WaterCut=85.6%.NB30:Ql=934.1bbl/d; Qo=228.6bbl/d;WaterCut=75.5%.40試驗(yàn)初步設(shè)計(jì)(preliminary design of test): 8、水平井產(chǎn)能和經(jīng)濟(jì)效益估算(W production capability and economic benefit estimation):2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW test按以下兩種假設(shè)條件保守估算了側(cè)鉆水平井的產(chǎn)量和效益: based on fo
51、llowing 2 assumptions to predict production rate and benefit of side track well .3.原油銷(xiāo)售油價(jià)為23.35$/bbl,操作成本為8$/bbl. 3.Oil sale price unit is 23.35$/bbl, operating cost is 8$/bbl.Now:NB31: Ql=587bbl/d; Qo=84bbl/d; WaterCut=85.6%.NB30: Ql=934.1bbl/d; Qo=228.6bbl/d; WaterCut=75.5%.41試驗(yàn)初步設(shè)計(jì)(preliminary de
52、sign of test): 8、水平井產(chǎn)能和經(jīng)濟(jì)效益估算(W production capability and economic benefit estimation):2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW testProduction prediction42試驗(yàn)初步設(shè)計(jì)(preliminary design of test): 8、水平井產(chǎn)能和經(jīng)濟(jì)效益估算(W production capability and economic benefit estimation):2.開(kāi)展短半徑側(cè)鉆水平井試驗(yàn)的主要思路main train of thoughts about short-radius side track HW testBenefit prediction43搞好短半徑側(cè)鉆水平井增產(chǎn)試驗(yàn)的關(guān)鍵技術(shù):key points of short-radius side tr
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025浙江寧波市卓眾人力資源服務(wù)公司銷(xiāo)售業(yè)務(wù)人員專(zhuān)項(xiàng)招募20人筆試參考題庫(kù)附帶答案詳解
- 上海工會(huì)管理職業(yè)學(xué)院《機(jī)器學(xué)習(xí)導(dǎo)論》2023-2024學(xué)年第二學(xué)期期末試卷
- 北京第二外國(guó)語(yǔ)學(xué)院《區(qū)域規(guī)劃方法》2023-2024學(xué)年第二學(xué)期期末試卷
- 柳州鐵道職業(yè)技術(shù)學(xué)院《環(huán)境化學(xué)實(shí)驗(yàn)》2023-2024學(xué)年第二學(xué)期期末試卷
- 天津醫(yī)科大學(xué)臨床醫(yī)學(xué)院《美術(shù)教學(xué)論》2023-2024學(xué)年第二學(xué)期期末試卷
- 湖北體育職業(yè)學(xué)院《網(wǎng)站開(kāi)發(fā)(PHP)理論》2023-2024學(xué)年第二學(xué)期期末試卷
- 青海師范大學(xué)《數(shù)據(jù)庫(kù)課程設(shè)計(jì)》2023-2024學(xué)年第二學(xué)期期末試卷
- 福建農(nóng)業(yè)職業(yè)技術(shù)學(xué)院《計(jì)算機(jī)工程數(shù)學(xué)1》2023-2024學(xué)年第二學(xué)期期末試卷
- 重慶資源與環(huán)境保護(hù)職業(yè)學(xué)院《稅收模擬》2023-2024學(xué)年第二學(xué)期期末試卷
- 北京工商大學(xué)《視唱練耳(1)》2023-2024學(xué)年第二學(xué)期期末試卷
- 語(yǔ)言學(xué)導(dǎo)論知到課后答案智慧樹(shù)章節(jié)測(cè)試答案2025年春廣東外語(yǔ)外貿(mào)大學(xué)
- 線(xiàn)上醫(yī)藥銷(xiāo)售培訓(xùn)
- 注冊(cè)建造師執(zhí)業(yè)管理辦法
- 湖北省十一校2024-2025學(xué)年高三第二次聯(lián)考數(shù)學(xué)試卷(解析版)
- 2025年憲法知識(shí)競(jìng)賽全套題庫(kù)及答案(共150題)
- 第10課 養(yǎng)成遵紀(jì)守法好習(xí)慣
- 2025修訂版《保障中小企業(yè)款項(xiàng)支付條例》解讀學(xué)習(xí)課件
- 公司管理制度編號(hào)方法
- 世界贈(zèng)予我的混聲三部合唱線(xiàn)譜徐
- 2025年工程測(cè)量員(技師)職業(yè)技能鑒定理論考試指導(dǎo)題庫(kù)(含答案)
- T-CWEC 45-2024 水利水電工程帷幕灌漿水下施工及質(zhì)量驗(yàn)收規(guī)范
評(píng)論
0/150
提交評(píng)論