1、Contract TitleShanghai Secco Petrochemicals Company LimitedShanghai Ethylene Cracker ComplexCaojing, Shanghai, P R ChinaDocument TitlePLANT DESIGN NOISE PHILOSOPHYDOCUMENT NUMBERPH-00-TSC-SE-0004A00FOR APPROVALAPPROVEDRM26/06/02JEF26/06/02JEF26/06/02OCE26/06/0212/08/02P02Reviewed By JDI23-May-02YSJP
2、01Reviewed By SEIPP13-May-02WYZ14-May-02P00PRELIMINARY, FOR REVIEWCPRP11-Apr-02Issue RevIssue or Revision DescriptionOrigin byDateCheck byDateApprovebyDateApprove byDateThis Document is Owned byOo Chwee Er (OCE)IPMT AuthorityHARD COPIES ARE UNCONTROLLEDPLANT DESIGN NOISE PHILOSOPHYTABLE OF CONTENTS
3、TOC o 1-3 n 1.0SCOPE2.0DEFINITIONS3.0RESPONSIBILITIES4.0LEGISLATION AND STANDARDS4.1Legislation and standards4.2Design guidance and good practice5.0DESIGN NOISE LEVEL REQUIREMENTS5.1Work Area Noise Requirements5.2Facilities and other areas5.3Administrative and office areas5.4Community Noise Requirem
4、ents6.0REPORT REQUIREMENTS7.0ACCEPTANCE TESTINGAPPENDIX AAPPENDIX BSCOPE1.1This document defines the noise requirements for Work Areas within new plant areas and for Community Areas at the plant fence line and in the local community. 1.2Additional guidance and information for the achievement of thes
5、e requirements is given in the Appendices. The content of the Appendices is not intended to modify the requirements given in the body of the document.DEFINITIONS2.1Owner means SECCO, the owner / operator of the plant.2.2Contractor means the company committed to designing and furnishing the facilitie
6、s for a plant project.2.3Supplier means the company manufacturing or selling the equipment installed in the plant.2.4Background noise means noise from all sources other than from the subject plant.RESPONSIBILITIES3.1The Owners responsibilities shall include:a)Notification to the Contractor of all ap
7、plicable mandatory regulations.b)Provision to the Contractor of background noise level data. As a minimum this shall include survey measurements made at the boundaries of the new plant. The Owner may request the Contractor to determine the background noise levels. This should include statistical mea
8、surements (including LAeq, LA10, LA90) and measurements of dBA, dB(lin) or dBC, and octave bands from 31Hz to 8kHz.c)Provision to the Contractor of any area noise level requirements additional to those in this document. This may include requirements at unit boundaries within the plant, and requireme
9、nts at specific community areas.3.2The Contractors responsibilities shall include:a)Design of the plant to achieve the noise limits specified, including specification and purchase of Suppliers equipment consistent with the noise design, and provision of such additional noise treatment as may be requ
10、ired to meet the specified noise limits. Where Work Area and Community Noise requirements are specified the plant shall satisfy both categories of requirement.b)Provision to Owner of reports, area plans and schedules to demonstrate the acceptability of the design.c)Final noise survey to show that th
11、e plant when handed over to Owner complies with the noise level requirements.d)Where for reasons of operability or practicability a local relaxation of noise limits is considered desirable by the Contractor he shall propose to and obtain from the Owner written confirmation of the acceptability of ea
12、ch relaxation, describing the affected area and noise levels resulting.LEGISLATION AND STANDARDSLegislation and standardsPRC National Noise Standard (GB12348-90), Grade 3.PRC Urban Noise Standard (GB3096-93), Grade 3.PRC Urban Area Environmental Noise Monitoring Method (GB14623-93).PRC Code for Nois
13、e Control Design of Industrial Enterprises (GBJ87-85)Method of Measuring Noise at Boundary of Industrial Enterprises (GB12349-90)PRC Code for Measuring Noise of Industrial Enterprises(GBJ122-88)UK Noise at Work Regulations 1989.ISO 9613 Parts 1 and 2; Acoustics - Attenuation of sound during propagat
14、ion outdoors.ISO 1999; Acoustics - Determination of occupational noise exposureIEC 60651; Sound Level Meters; Type 1IEC 60804; Integrating Averaging Sound Level Meters; Type 1IEC 60942; Sound Calibrators, Type 1.Design guidance and good practiceAPI 521 Guide for Pressure Relieving and Depressuring S
15、ystems.EEMUA 142 - Acoustic insulation of pipes, valves and flanges; Engineering Equipment and Materials Users Association; London DESIGN NOISE LEVEL REQUIREMENTSWork Area Noise RequirementsThe noise level requirements specify the maximum noise level allowable for the operating condition stated. Whe
16、re for a given area there is more than one requirement due to the types of operating conditions the Contractor shall ensure all the requirements are satisfied. The primary purpose of these requirements is for the protection of hearing of personnel. Additionally these requirements are intended to pro
17、vide a suitable environment for spoken communication.The various areas of the plant shall be classified in a number of areas depending on their use, and noise level requirements allocated accordingly. Where higher noise levels may occur infrequently or for short durations, or where the noise is impu
18、lsive, additional noise limits are specified. Where the noise has significant narrow-band tonal content a tonal weighting to the specified level is defined. For reasons of practicability or operability a limited number of areas may be classified Noise Restricted Areas, where access will be limited i
19、n order to minimise the risk of damage to hearing for personnel. For Owner approvals purposes each Restricted Area shall be treated by the Contractor as a relaxation in the noise requirement. General Work Area Noise Limit - normal operationsIn any area accessible to personnel, noise levels shall not
20、 exceed 83dBA under normal operating conditions. Also the individual octave band levels given below shall not be exceeded. This shall not take into account any use of personal hearing protection.Sound Pressure Level (dB)dBA631252505001k2k4k8kOverall and octave band limit for General Work Areas839690
21、848178787576747472Limits for impulsive noiseIn an area where personnel can at any time be exposed to impulsive noise, the impulsive noise shall be limited to a peak level of 200 pascal (140dB(lin) ). This shall not take into account any use of personal hearing protection.Weighting for Tonal / Narrow
22、-band noiseIf any equipment to be used on the plant has an annoying tonal / narrow-band noise characteristic then the narrow-band noise from this equipment should be reduced in the relevant octave bands to be below the broadband noise in the area by the following amountReduction of Sound Pressure Le
23、vel (dB)631252505001k2k4k8kNarrow Band Weighting - in plant noise46773Limits for short term or infrequent noise exposure During operating conditions where higher noise levels can be experienced for limited durations, noise levels higher than the General Work Area limit of 83dBA can be accepted, depe
24、nding on the duration, and will be subject to agreement by the Owner. The basis of calculation shall be an acceptable base level of 85dBA for a 8 hour working day, with the allowable exposure reduced by a factor of 2 for each 3dBA increase in noise level, but subject to a maximum level of 115dBA. Th
25、is shall not take into account any use of personal hearing protection.The application of this provision includes operation of relief valves and blowdown systems. Areas subject to this provision shall include but not be limited to high level walkways, platforms and ladders.Restricted AreasIn some are
26、as of high noise levels effective noise control measures may be excessively costly or considered impracticable due to the type or extent of treatment needed or the consequences of this treatment on equipment accessibility for maintenance operations. In these cases the Contractor may propose Restrict
27、ed Areas having high noise levels (above the design limit) and in which the use of personal hearing protection will be mandatory when the equipment is or may be operating. In particular Restricted Areas may be considered for Emergency Power Generation enclosures, Firewater Pump enclosures, and Gas t
28、urbine prime mover enclosures.All Restricted Areas shall be subject to approval by Owner.Facilities and other areasAreadBAHVAC plantrooms83Local Switchrooms, MCC65Workshops, stores65Toilets, locker rooms60Kitchens60Central Control Room55Laboratories55Administrative and office areasAreadBADining Room
29、s55Rest Rooms50General office areas50Individual office45Conference Room40Medical facilities40In these areas where the ventilation equipment is expected to be the principal noise source, it shall be designed to avoid excessive hiss and rumble.Community Noise RequirementsTimeLevel (dBA) at Community b
30、oundary due to SECCO plantDay 60Night50TimeTotal level (dBA) at Community boundaryDay 65Night55This shall be based on a measurement (sampling) time of not more than 15 minutes daytime and not more than 10 minutes at night.Reduction of Sound Pressure Level (dB)631252505001k2k4k8kNarrow Band Weighting
31、 - Community noise1591112128REPORT REQUIREMENTS6.1The Contractor shall produce noise reports, equipment and acoustic treatment schedules, and noise level plans to show the following information.Noise reports, to give noise design requirements, summary of significant noise-emitting equipment in each
32、area, giving noise levels expected, acoustic treatment included in the design, and any particular features or considerations incorporated.Equipment noise schedules, to give list of equipment noise levels specified / ordered / Supplier data.Acoustic treatment schedules, to give lists of pipe lines re
33、quiring acoustic insulation, including insulation type, thickness and extent.Noise plans, to show expected noise levels in each area.In addition Process P&IDs shall include extents of pipework acoustic insulation.6.2These reports, schedules and plans shall be issued to Owner and approved by him, at
34、two stages in the project. The reports and schedules shall include planned individual noise level requirements for all significant equipment and any anticipated acoustic treatment, whether or not included in equipment requisitions at that stage. The noise plans shall show anticipated noise levels in
35、 each area. Anticipated pipework acoustic insulation requirements shall be listed in line list format, showing extent and thickness.Process P&IDs should show anticipated extent of acoustic insulation. The Plant Insulation Specification shall include a section relating to acoustic insulation, definin
36、g the overall thicknesses and materials of construction called up in the acoustic insulation schedule.The reports and schedules shall include supplier noise data for individual equipment and any acoustic treatment required. The noise plans shall show anticipated noise levels in each area. Pipework a
37、coustic insulation requirements shall be listed in line list format, showing extent and thickness.Process P&IDs shall show extent of acoustic insulation. The Plant Insulation Specification shall include a section relating to acoustic insulation, defining the overall thicknesses and materials of cons
38、truction called up in the acoustic insulation schedule.ACCEPTANCE TESTING7.1Noise level survey measurements will be made inside the plant areas to confirm that the noise level requirements have been satisfied. These measurements may be made at any accessible position 1m or more from any equipment du
39、ring normal operations of the plant at or near its full design capacity. Additional measurements may be made during blowdown, operation of relief valves, or operation of any other intermittently or infrequently operating equipment.The measurements shall be made in the nine octave bands between 31Hz
40、and 8kHz, as well as of dBA and dB(lin) or dBC, using slow response of the meter. Where noise is considered to be impulsive in nature the peak value of dB(lin) or dBC shall be measured.Noise survey measurements will be carried out in such areas and numbers of locations in each area as agreed between
41、 Contractor and Owner before commencement of measurement survey.7.2Noise level measurements will be made in Community areas to confirm that the noise level requirements have been satisfied. These shall include the measurements required by the relevant PRC Noise measurement standards, and include as
42、a minimum LAeq, LA10, LA90, during day and night time conditions, for the measurement times stated in the noise requirements section above. In addition the noise spectrum shall be measured at each measurement position, for the nine octave bands between 31Hz and 8kHz and dBA and dB(lin) or dBC.Locati
43、on and number of noise measurement positions will be agreed between Contractor, Owner and Local Authority before commencement of measurement survey.7.3All noise level measurement equipment shall be Type 1 or Type 0 accuracy.7.4No allowance will be made for meter tolerances.APPENDIX AgUIDANCE ON DESI
44、GN, REPORTING AND TESTINGThe content of this Appendix is intended only as initial guidance for the Contractor, and does not modify supersede or replace the requirements given in the main part of this document.A1DESIGN NOISE LEVEL REQUIREMENTSA1.1The purpose of noise control is to limit the exposure
45、of personnel to noise. The exposure can be determined as a weighted-average level over time of the working day (LAeq) using the method in for example the UK Noise at Work Regulations. Noise levels will vary throughout the plant on an areas basis, and possibly on a time basis, and in the initial desi
46、gn phase of a plant reliable estimates of the time spent by each class of personnel in each area / level of noise cannot be made. The noise exposure method of noise control design is therefore not considered sufficiently reliable for initial design of a complete plant. Accordingly the plant noise li
47、mits have been expressed as area noise level requirements.With the intention of maintaining personnel noise exposure for an 8 hour working day below a weighted-average (LAeq) of 85dBA, and ideally below a LAeq of 80dBA, and since the planned working day is to be 12 hours, the area limit has been set
48、 at 83dBA, acknowledging that if this limit is satisfied then a significant proportion of the plant area will be quieter than this.A2CONTRACTORS RESPONSIBILITIESA2.1It is the contractors responsibility to carry out the noise control design for the plant such that the various noise level requirements
49、 are all satisfied by the completed plant. He shall determine combined effective noise levels.Some indicative noise level requirements for types of equipment are listed here for general guidance. Some adjustments may be needed for particular equipment to take into account features specific to the pa
50、rticular equipment, such as numbers and noise levels of neighbouring equipment, noise from pipework, and distances between equipment.A2.3If for any reason it is not technically feasible to achieve the noise requirements, or the Contractor considers there is a serious economic penalty in achieving th
51、ese requirements, the Owner shall be advised of what noise levels are technically feasible or economic, and requested for an appropriate relaxation in the requirements.A3SUGGESTED NOISE LEVEL REQUIREMENTSNoise limits for individual items of equipment should be derived from the overall plant requirem
52、ents for Work Area and Community noise, and take into account the location of the equipment and its surroundings. As a starting point the following general guidelines may be used initially for a plant design, provided they are confirmed during the design by the Contractor.A3.1Major EquipmentEquipmen
53、t typelevel(dBA)measurement locationpossible acoustic treatmentCompressors771m from casingclose cladding or enclosuresPumps771m from casingclose cladding or enclosuresFans, blowers771m from casing and openingsclose cladding or enclosures on casing, silencers for openingsGearboxes771m from casingclos
54、e cladding or enclosuresSteam Turbines771m from casingclose cladding or enclosuresFin fan coolers791m below fan, 1m to side of fan ringincreased diameter reduced speed fanCooling Towers (falling water type)7579at grade, 10 m from air inletat 1m next to fansFired Heaters, Steam boilers771m from casin
55、g and openingsclose cladding on casing, silencers for openingsSolids processing equipment, such as vibrating screens, cyclones, centrifuges, crushers, granulators, pelletizers771m from equipmentclose cladding or enclosures.Equipment supports may need vibration isolators, and connections may need fle
56、xibles, in order to limit vibration-induced noise in adjacent structureElectric motorssee driven equipment1m from equipmentlow noise motors may include reduced-noise fans, noise-reducing fan cowls, increased motor frame sizeControl valves761m from pipewall at 1m downstream from valvelow noise trim,
57、outlet baffleElevated flares70at boundary of sterile area, for normal continuous flaring ratereduced noise flare tipA3.2Major Equipment for Restricted AreasThe following items can normally expected to have Restricted Areas in their immediate surroundings.Equipment typetypical level(dBA)measurement l
58、ocationCommentGas turbine prime mover (gas generator)100 - 110inside enclosureenclosure normally restricted access at all timesDiesel drive for generator, firewater pump, etc95-105adjacent to engine carcaseFor emergency equipment hearing protection to be carried at all times by personnel in the area
59、 and worn when engine is running.A3.3Minor equipment, and light density layoutAs a guide, minor equipment can be taken as having rated power of 30kW or less, and light density layout can be taken as where significant noise sources are spaced 10m or more apart, such as pumps for tank farms.In areas w
60、here the equipment is minor and the layout is of light density individual equipment noise limits can be set initially at 4dBA below the local area noise limit.A3.4Vents to atmosphereNoise from vents shall comply or be compatible with the appropriate Normal or Intermittent noise limit. The noise gene
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 交通安全在心中班會
- 水電專業(yè)交付策劃
- 土地授權(quán)合同范本
- 綜合實踐活動《孝親敬長》
- 生產(chǎn)定制合同范本
- 結(jié)核病健康宣教
- 市政項目合同范本
- 旅游產(chǎn)品設(shè)計案例
- 燒烤師徒培訓合同范本
- 經(jīng)營預算合同范本
- 幾大類資管產(chǎn)品的比較
- 水利工程防汛應急救援預案
- 安徽醫(yī)科大學一附院高新分院-工程概況詳解
- 中藥材、中藥飲片的驗收
- 【3-5分鐘微電影劇本青春】微電影劇本《青春不褪色》
- 老垃圾填埋作業(yè)方案
- 中考英語作文評分標準
- 老年服務倫理與禮儀課件
- 稱骨歌及說明
- 中石化洛陽設(shè)計院配管設(shè)計總則
- (最新整理)液化氣體汽車罐車安全監(jiān)察規(guī)程
評論
0/150
提交評論