PAGEPAGE86CraftFoodBDAprojectandCFGpilecombined
foundationtreatmentprojectxx項目CFG樁復合地基處理工程DesignTechnologyDocuments設計技術(shù)文件Design設計:Approved審定:Manager負責人:Designdepartment:設計單位:Biddingdepartment:.投標單位:TablesofContent
目錄ChapterOne:Introductionoftheproject一、工程概況ChapterTwo:Contentsoftheproject二、工程項目內(nèi)容ChapterThree:Introductionofengineeringgeology三、工程地質(zhì)情況介紹ChapterFour:Selectingscheme四、方案的選擇Chapterfive:Selectingtheschemeofcombined
footing五、編制依據(jù)及設計原則ChapterSix:Selectingconstructiontechnics六、施工工藝選擇Chapterseven:Designingandcalculatingcombined
footing
ofCFGpile七、CFG樁復合地基設計及計算Chaptereight:Checkcomputationsofcombined
footing
ofCFGpile八、CFG樁復合地基驗算ChapterNine:Designingparameterandconclusion九、設計參數(shù)及結(jié)論ChapterTen:Constructiondrawing十、施工圖ChapterEleven:Designqualitycertificate十一、設計資質(zhì)證書Geotechnicalengineeringdesigncertificate(TheFirstGrade)巖土工程設計證書(甲級)Buildingengineeringdesigncertificate(TheFirstGrade)建筑工程設計證書(甲級)
一、 Introductionoftheproject
工程概況TheCraftFoodBADProjectlocatesatBeijingEconomicandTechnologicalDevelopmentArea.
xx項目工程地址位于xx經(jīng)濟技術(shù)開發(fā)區(qū)。Thetopographyoftheconstructionareaisevenandwiden,thenaturegroundelevationisbetween24.99mand25.55m.
施工區(qū)域地勢平坦開闊,自然地面標高24.99~25.55mTheconstructioncompanyisCraftFood(China)Co.Ltd.
本工程建設單位是:xx有限公司。Thecompanyofthetopdesign
of
building
and
civil
engineering
structuresisTheEleventhDesign&ResearchInstituteofIT,Co.,Ltd.
本工程上部結(jié)構(gòu)設計單位是:xx有限公司。二、Connentsoftheproject
工程項目內(nèi)容Becausethenaturalbearingstratumistwolayersofclayeysiltaswellassiltyclay,thebearingcapacityofnaturalfoundation
soilis110Kpa,whichcannotanswertheneedsofdesigningrequirements.Therefore,itneedstodesigncombined
footing
ofCFGpile,inordertomeettherequirementthatthebearingcapacityshouldbe300kPa.Andthefinalsettlementislessthan40mmaswellassettlementoddsshouldbelessthan0.2%.
由于天然地基持力層為2層粘質(zhì)粉土、粉質(zhì)粘土,天然地基承載力110Kpa.承載力不能滿足設計要求。為此設計要求采用CFG樁復合地基處理,滿足基底承載力300kPa的要求,最終沉降量小于40mm,沉降差小于0.2%。三、Introductionofengineeringgeology
工程地質(zhì)情況介紹3.1Characteristicsoflithology
3.1巖性特征Accordingtothegeotechnicalinvestigationdata,thestratumofthecompanylocatingareacanbedevidedintosixlayers,theonetothreelayersarerecentsediment,theothersarequaternaryperiodsedimentarylayers.Thestructureofstratumaswellasgeotechnicalcharacteristicsfromtoptobottomintwenty-fivemetersdepthrangearestatedseparatelyasfollow:
根據(jù)巖土工程勘察資料顯示,廠址區(qū)地層分為6層,1-3層為新近沉積,其余為第四系沉積層,25米深度范圍內(nèi)地層結(jié)構(gòu)及巖土特性自上而下分述如下:Artificialfullingsoillayer:Itscolorisfilemot,wetinsomesort,andthislayerismainlyfarmsoil.Thedepthis0.3~1.80meters.
人工填土層:黃褐色,稍濕,本層主要為耕土。層厚0.3~1.80米。Clayeysiltaswellassiltyclay:Itscolorisfilemottobrown-yellow,wetinsomesort,beingfictile.Thedepthofthislayeris2.9~6.3meters.
粘質(zhì)粉土、粉質(zhì)粘土:黃褐-褐黃色,稍濕,可塑,該層土層厚2.9~6.3米。Sandysiltaswellassiltysand:Thecolorisyellow-graytogray,wetinsomesort,middle-density.Thedepthofthislayeris2.6~6.5meters.
砂質(zhì)粉土、粉砂:黃灰-灰色,稍濕,中密,。該層土層厚2.6~6.5米Siltyclayaswellasclayeysilt:Itscolorisbrown-yellow,beingwetandfictile.Italsocontentsmicaandferricoxide.Thedepthofthislayeris3.8~9.70meters.
粉質(zhì)粘土、粘質(zhì)粉土:褐黃色,濕,可塑,含云母及氧化鐵,該層土層厚3.8~9.70米。Finesandaswellassiltysand:Itscolorisbrown-yellow,beingofsaturation,middle-densitytodensity.Italsocontentsmicaandquartz.Thislayerhasnotbepenetratedthroughlyinsomepart.
細砂、粉砂:褐黃色,飽和,中密-密實,含云母石英,該層局部未穿透。Siltyclayaswellasheavysiltyclay:tscolorisbrown-yellow,beingwet,andthislayerhasnotbepenetrated.
粉質(zhì)粘土、重粉質(zhì)粘土:褐黃色,濕,該層未穿透。3.2Physiscalmechanicalcharacteristic
物理力學性質(zhì)Serialnumber序號Typeofsoil土類型Unitweight容重(kN/m^3)Modulusofcompressibility壓縮模量(MPa)Bearingcapacity承載力(kPa)1Non-fullingsoil素填土//2Siltyclayaswellasclayeysilt粘質(zhì)粉土、粉質(zhì)粘土20.04.0110.02-1Sandysiltaswellassilty砂質(zhì)粉土、粉砂20.07.0120.02-2Clayaswellasheavysiltyclay粘土、重粉粘土18.53.0100.03Sandysiltaswellassilty砂質(zhì)粉土、粉砂20.27.0130.03-1Clayeysiltaswellassiltyclay粘粉、粉粘20.35.0110.03-2Clayaswellasheavysiltyclay粘土、重粉粘18.53.5110.04Clayeysiltaswellassiltyclay粘粉、粉粘20.25.0140.04-1Sandy砂質(zhì)粉土20.58.0180.04-2Heavysiltyclayaswellasclay重粉粘、粘土20.05.5150.04-3Finesandaswellassiltysand細砂、粉砂-10.0180.05Finesandaswellassiltysand細砂、粉砂-15.0220.05-1Clayeysilt粘質(zhì)粉土5-2Sandy砂質(zhì)粉土19.46Siltyclayaswellasheavyclay粉粘、重粉粘19.97.0180.06-1Clayeysoil粘性土20.110.0210.06-2Clayeysoil粘性土18.97.0180.0四、 Selectingtheschemeofcombined
footing
復合地基方案的選擇:Thestandardvalueofthebearingcapacityoffoundationisdesignedaccordingtotheconditionoftheengineeringgeologyandthehydrogeology,wemayselecttheschemethatadoptsCement-Flyash-Gravelpile(CFG).Thisschemeblungesgravelpile,flyash,cementaswellaswaterintothebodyofGravelpile,thenmixthemtogethertoproduceapilewithhighaffixablestrength.Itisusedtodealwiththefoundationofhighbuildingsandistherepresentativeofthepile,whichhashighaffixablestrength.Ithasanobvioustechnicaleconomyadvantage.Atthesametime,consideringthearoundenvironmentandtroubleofannoyinglocalpeople,aswellastheexperiencesofourcompanyduringconstructions,theCement-Flyash-Gravelpilecombined
footingisanwellselectedscheme.根據(jù)本工程地質(zhì)條件及水文地質(zhì)條件及設計基底承載力標準值,可選用水泥粉煤灰碎石樁(CementFly—ashGravelpile簡稱CFG樁)復合地基處理方案,它是在碎石樁體中摻入適量石屑、粉煤灰、水泥加水拌合制成一種粘結(jié)強度較高的樁體。多用于高層建筑地基處理中,是高粘結(jié)強度樁的典型,具有較明顯的技術(shù)經(jīng)濟優(yōu)勢。同時考慮到周邊環(huán)境及擾民問題及我公司在當?shù)厥┕?經(jīng)驗,水泥粉煤灰碎石樁(CFG樁)復合地基是優(yōu)選方案。五、 Selectingtheschemeofcombined
footing
方案編制依據(jù)及設計原則Thisdesigncomplywiththefollowingmaincodesanddata
本設計依據(jù)下述主要規(guī)范及資料:<Technicalcodeforgroundtreatmentofbuilding>JGJ/T79-91
《建筑地基處理技術(shù)規(guī)范》JGJ/T79-91<Designcodeforgroundfoundationofbuilding>GB50202-2002
《建筑地基基礎(chǔ)設計規(guī)范》GB50202-2002<TheBeijingDistrictinvestigation&designcodeforgroundfoundationofbuilding>(DBJ-501-92)
《xx地區(qū)建筑地基基礎(chǔ)勘察設計規(guī)范》(DBJ-501-92)<Codeforgroundandfoundationengineering&acceptance>(GBJ50202-2002)
《地基與基礎(chǔ)工程施工及驗收規(guī)范》(GBJ50202-2002)<Codeforconcretestructuredesign>GB50010-2002
《混凝土結(jié)構(gòu)設計規(guī)范》GB50010-2002<Reportofgeotechnicalinvestigation>
《巖土工程勘察報告》Dataofthedesignofbuildingstructure
建筑結(jié)構(gòu)設計資料Themethodsandexperienceswehaveobtainedthroughthepassedyeas.
我公司多年施工經(jīng)驗和公司施工工法Designprinciples:
設計原則:Thegeotechnicaldesignshouldachieveworkingsafelyduringdesign
reference
period,atthesametime,itshouldmeettherequirementsofallscheduledfunctions,intheleastinvestmentandtheshortestduration.Inshort,itcontentsthreeaspectsasfollow:
巖土工程設計應以最少的投資,最短的工期,達到設計基準期內(nèi)安全運行,并滿足所有的預定功能要求,包括三個方面:Therequirementsofsafetyaswellasendurance:Thisisthesignificantproblemofconstruction.Firstofall,weshouldassurethesafetyandstabilityofthebuildings.
安全性和耐久性要求:這是工程施工的首要問題,首先要確保建筑物的安全和穩(wěn)定。Therequirementsofscheduledfunctions:Undertheconditionthatassuringsafety,thedurationshouldbeshortenedasmuchaspossible.Thereforewecangaintimefortheconstructionoflattermainbody.
預定功能要求:確保較短的施工工期在保障安全的前題下,要盡可能的壓縮工程的施工工期,以便為后續(xù)的主體結(jié)構(gòu)施工贏得時間。Economicalandreasonable:Undertheconditionthatassuringsafety,adopttheadvancedtheoryandrelatedexperiencesofconstructionasmuchaspossible,andreducethecostinmaximum,thuseconomizetheinvestment.
經(jīng)濟合理:在保障安全的前提下,要盡可能充分利用較先進的理論及相關(guān)施工經(jīng)驗,最大限度的降低造價,節(jié)約投資。六、 Selectionoftheconstructiondeviceandconstructiontechnicsaswellasthepurposeofselectingtheschemeofcombined
footing:
施工設備和施工工藝的選擇及復合地基方案的設計目的:Thistimeweuselong-helixdrillingmachinetohole,aswellastheconstructiontechnicsofproducingconcretepilewithpumpingintheconnerofmechanicalmixing.Theconstructiondeviceislong-helixdrillingmachine,theconstrainedconcretemixerandthetransportationpumpofconcrete.
本次施工選擇長螺旋鉆機成孔,機械攪拌中心泵壓混凝土成樁施工工藝,施工設備為長螺旋鉆機,強制式混凝土攪拌機和混凝土輸送泵。Thepurposeoftreatingthefoundationistodealwiththetwoquestionsofdistortionandbearingcapacity,namelythisdesignisimplementedbydouble-control.
地基處理的目的解決變形和承載力兩方面問題,即本設計是雙控來進行設計。七、 Designandcalculationofcombined
footing
復合地基設計及計算7.1Designingparameterofthetopstructure
上部結(jié)構(gòu)設計參數(shù)Theunattachedcolumnfoundation:Thecharacteristicvalueofbearingcapacityoffoundation
soilafterbeingtreated≥300Kpa.獨立柱基:地基處理后承載力特征值≥300KpaTheelevationofbottomoffoundationalnon-cushion-3.00m(±0.00=26.90m).
基礎(chǔ)素墊層底標高-3.00m(±0.00=26.90m)Thefinalsettlementoffoundationislessthan40mm,thesettlementofthecolumnfoundationbesideisnotlargerthan0.002Lwhenloading.
基礎(chǔ)最終沉降量≤40mm,相鄰柱基受荷沉降差不大于0.002L.Andthedepthofthepillowlayeris250mm.
褥墊層厚度250mm.The
raft
foundation:Thecharacteristicvalueofbearingcapacityoffoundation
soilafterbeingtreated≥300Kpa.筏板基礎(chǔ):地基處理后承載力特征值≥300KpaTheelevationofbottomoffoundationalnon-cushion-3.00m(±0.00=26.90m).
基礎(chǔ)素墊層底標高-3.00m(±0.00=26.90m)Thefinalsettlementoffoundationislessthan40mm,thesettlementofthecolumnfoundationbesideisnotlargerthan0.002Lwhenloading.
基礎(chǔ)最終沉降量≤40mm,沉降差不大于0.002LAndthedepthofthepillowlayeris250mm.
褥墊層厚度250mm.7.2Thelengthofpile
樁長ThefoundationsoiloftheCement-Flyash-Gravelpile(CFG)requeststheendofthepilesshouldlocateongoodsoil.Throughanalysingtheinvestigationreportandapplyingthesuggestiongivenbytheinvestigationreport,selecttheendofpilelocatingatfivelayersofsoilwhichcanmeettherequirement,accordingtothegeotechnicalparametersofeachlayeraswellasthestateofundergroundwateranddistortionofthecompanylocatingarea.
CFG樁復合地基要求樁端落在好的土層,經(jīng)對勘察報告分析和勘察報告建議,依據(jù)各層土的巖土工程參數(shù)及場區(qū)地下水位情況和變形考慮,選定樁端座落在5層土均可滿足要求。Theunattachedcolumnfoundation:Theeffectivelengthofpileis16.90meters.
獨立柱基;有效樁長16.90mTheelevationofbottomofpileis6.75meters,theCement-Flyash-Gravelpile(CFG)entersintothebearingstratumofsiltysandaswellasfinesand.Ifthebluntest47#drillingholecomeintofivebearingstratums,whichdepthis54cm,theotherscomeintothedepthofbearingstratumwillbelargerthan54cm.
樁底標高坐落于6.75m,CFG樁進入5層粉砂、細砂持力層。在最不利47號鉆孔進入5層持力層深度為54cm,其它鉆孔進入持力層深度>54cm。Theeffectivelengthofpileequalstotheelevationofbottomofpile(23.65meters)subtractstheelevationofbottomofpile(6.75meters),andtheresultis16.90meters.
有效樁長=樁底標高23.65m-樁底標高6.75m=16.90mThe
raft
foundation:Theeffectivelengthofpileis15.70meters.
筏板基礎(chǔ);有效樁長15.70mTheelevationofbottomofpileis7.95meters,theCement-Flyash-Gravelpile(CFG)entersintothebearingstratumofSandysilt.Ifthebluntest51#drillingholecomeintofivebearingstratums,whichdepthis54cm,theotherscomeintothedepthofbearingstratumwillbelargerthan54cm.
樁底標高坐落于7.95m,CFG樁進入5層粉砂、細砂持力層。在最不利51號鉆孔進入5層持力層深度為57cm,其它鉆孔進入持力層深度>57cmTheeffectivelengthofpileequalstotheelevationofbottomofpile(23.65meters)subtractstheelevationofbottomofpile(7.85meters),andtheresultis16.90meters.
有效樁長=樁底標高23.65m-樁底標高7.95m=15.70m7.3Diameterofpile
樁徑Thesizeofthepilediameterisdesigned400mm,accordingtotheselectedmakingpiledevice.根據(jù)所選用的成樁設備,設計樁徑400mm。7.4CalculatingthecharacteristicvalueRkofbearingcapacityofasinglepile
單樁承載力特征值Rk的計算ThecharacteristicvalueRkofbearingcapacityofasinglepilecanbecalculatedasthefollowingformula:
其單樁承載力標準值Rk按下式計算:Rk=(UpΣqsihi+qpAp)/KInthisformula:Up
其中:representstheperimeterofpile0.4*3.14=1.256m;
Up——樁的周長0.4*3.14=1.256m;qsirepresentsthestandardvalueofultimatelateralfrictionalresistanceofIlayer;
qsi——第I層土的極限側(cè)摩阻力標準值;hirepresentsthedepthofIlayer;
hi——第I層土的厚度;qprepresentsthestandardvalueofthesoilresistanceoftheendofpile;
qp——樁端土阻力標準值;Krepresentsfactorofsafety2.0;
K——安全系數(shù)2.0。Theunattachedcolumnfoundation:Theeffectivelengthofpileis16.90meters.
獨立柱基;有效樁長16.90mNowselectthebluntestsectionof47#drillinghole(Refertothesectionshowingin4-4)
選取最不利剖面的47號鉆孔(參考4-4,剖面):Serialnumberofsoillayer土層編號Depthhi(m)厚度Standardvalueoflimitlateralfrictionalresistance極限側(cè)阻力標準值qsi(KPa)hi*qsiStandardvalueoflimitendfrictionalresistance極限端阻力標準值qp(KPa)standardvalueofbearingcapacity承載力標準值fka(KPa)20.664529.71102-11.55075.012021.84581.011030.75035.01303-20.55527.511030.85040.01303-13.050150.0110041.05555.01404-30.84032.018041.55582.51404-11.36078.018041.25566.01404-11.66096.018050.545529.7800220{3.14*0.4(29.7+75+81+35+27.5+40+150+55+32+82.5+78+66+96+29.75)+3.14*0.4*0.4/4*800}/2=(1102+100.4)/2=601.2KNAccordingtothelong-termexperiencesofconstructionthatourcompanyhasobtained,wedefineRk=580.0KN.以本公司長期的施工經(jīng)驗,取Rk=580.0KN。The
raft
foundation:Theeffectivelengthofpileis16.90meters.
筏板基礎(chǔ);有效樁長15.60mRk=540.0KN。7.5Designingthereplacementratioofarea
復合地基面積置換率設計Thereplacementratioofareacanbecalculatedasthefollowingformula:
復合地基面積置換率按下式計算:Inthisformula:fsp,krepresentsthecharacteristicvalueofbearingcapacityofcombinedfooting300Kpa式中:fsp,k——復合地基承載力特征值300KPa;mrepresentsthereplacementratioofarea;
m——面積置換率;fskrepresentsthecharacteristicvalueofbearingcapacityofthesoilbetweenpiles110KPa;
fsk——樁間土承載力特征值110KPa;βrepresentsthecoefficientof強度發(fā)揮ofthesoilbetweenpiles0.90;
β——樁間土強度發(fā)揮系數(shù)0.90;Rkrepresentsthecharacteristicvalueofbearingcapacityofafree-singlepile580/kN;Rk——自由單樁承載力特征值580/kN;Aprepresentsareaofsectionofpile0.1256.
Ap——樁的截面面積0.1256。Usetheaboveformulatocalculatethereplacementratioofareaofthisproject:
由上式計算得到該工程復合地基面積置換率:Thereplacementratioofaream=(300-110*0.90)/(580/0.1256-110*0.90)=0.045
置換率m=(300-110*0.90)/(580/0.1256-110*0.90)=0.0457.6Thedesignstrengthofthebodyofpile
樁體強度設計:Inprinciplethefabricationratioofthebodyofpilearecontrolledbythestrengthofthebodyofpile.Thecompressivestrengthofthebodyofpileshouldanswertheneedsofthefollowingformula:
原則上樁體配比按樁體強度控制,樁體試塊抗壓強度應滿足下式要求:fcu≥kσP
fcu≥kσPKrepresentsfactorofsafety,3.0;
K——安全系數(shù),取3.0;σPrepresentsthemaxstressofthebottomofpileRk/Ap,kPa;
σP——樁頂最大應力Rk/Ap,kPa;fcu>3*580/0.1256=13.85Mpa
fcu>3*580/0.1256=13.85MpaThestrengthoftheconcretefabricationratioofthebodyofpileshouldbeC20.
樁體混凝土配合比強度應取C207.7Pilelayout
布樁Theprincipleofpilelayout:TheCement-Flyash-Gravelpile(CFG)shouldbearrangedintherangeoffoundation.Detailedschemeofpilelayoutisshowingonthe
布樁原則:CFG樁布在基礎(chǔ)范圍內(nèi)。具體布樁方案詳見CFG樁平面布置圖八、 CheckcomputationsofcombinedfootingofCFGpile
CFG樁復合地基驗算Theunattachedcolumnfoundation:Theeffectivelengthofpileis16.90meters.
獨立柱基;有效樁長16.90mImplementcheckcomputationsreferringtothebluntestsectionof47#drillingholeSerialnumber
參考最不利47#鉆孔剖面進行驗算parametersofstratum
地層參數(shù)Serialnumbe序號rTypeofsoil土類型Depthofsoil土層厚Unitweight容重Saturatedunitweight飽和容重Modulusofcompressibility壓縮模量Bearingcapacity承載力(m)(kN/m^3)(kN/m^3)(MPa)(kPa)1Non-fullingsoil素填土1.220.02.00050.02Clayeysiltaswellassiltyclay粘粉、粉粘2.820.04.000110.03Sandysiltaswellassiltysand砂質(zhì)粉土、粉砂1.220.07.000120.04Clayeysiltaswellassiltyclay粘粉、粉粘5.120.320.35.000110.05Siltysandaswellassandysilt粉粘、粘粉3.420.220.25.000140.06Sandysilt砂質(zhì)粉土2.620.520.58.000180.07Clayeysiltaswellassiltyclay粘粉、粉粘0.420.220.25.000140.08Clayeysoil粘土0.820.020.05.000150.09Slayeysilt粉質(zhì)粘土2.520.020.07.000180.0Thedepthoftheundergroundwater: 8.500(m)
地下水埋深: 8.500(m)Thedepthofthecompressivelayer: 17.250(m)
壓縮層深度: 17.250(m)Thediameterofpile: 400(mm)
樁直徑: 400(mm)Thelengthofpile: 16.900(m)
樁長: 16.900(m)Thecharacteristicvalueofbearingcapacityofasinglepile 580.000(kN)
單樁承載力特征值: 580.000(kN)Thereductionfactorofbearingcapacityofthesoilbetweenpiles 0.900
樁間土承載力折減系數(shù): 0.900Thedepthofthecushion: 250(mm)
墊層厚度: 250(mm)Theelevationofbottomoffoundationalnon-cushion -3.00m
基礎(chǔ)素墊層底標高 -3.00mCheckcomputationsofeachcolumn
各柱基驗算1-J1Thestructureoffoundation:2600*2600mm.Arrangethreepilesinactual,detailedinpileplan.
基礎(chǔ)形式:2600*2600mm實際布樁3根,具體詳見樁位圖Theactualreplacementratioofaream=5.57%
實際面積置換率m=5.57%Thecharacteristicvalueofbearingcapacityofcombinedfootingfspk:347.9(kPa)
復合地基承載力特征值fspk:347.9(kPa)fsp,k=mRk/Ap+αβfk(1-m)=347.9Calculatingsettlement
沉降計算Accordingtothecode,thecalculationofdistortioncanbeimplementedusingthecombinedmodulusmethod.
以規(guī)范,變形計算可采用復合模量法進行計算:Thesettlementofthecompositesoil:S1=Ψsp∑p0/Epsi*(Zi*αi-Zi-1*αi-1)
復合土層沉降量:Epsi=ζ*EsiThesettlementoftheunderlyingsoilofcompositesoil:
復合土層下臥層沉降量:S2=Ψ∑p0/Esi*(Zi*αi-Zi-1*αi-1)Thefinalsettlement:S=S1+S2
最終總沉降量:Intheformula:式中:p0representstheadditionalpressureatthebottomofthefoundation,accordingwiththequasi-permanentcombinationoftheeffectofloading,kPa;
p0—對應于荷載效應準永久組合時的基礎(chǔ)底面處的附加壓力,kPa;ESirepresentsthemodulusofcompressibilityoftheIlayer,underthebottomoffoundation,MPa;
ESi—基礎(chǔ)底面下第i層土的壓縮模量,MPa;hirepresentsthedepthoftheIlayerofthecompositesoil;
hi—第I層復合土體的厚度;Z1,Zi-1representsthedistancebetweenthebottomoffoundationandtheIlayeraswellasthei-1layerseparately,m;
Z1、Zi-1—基礎(chǔ)底面至第i層土、第i-1層土底面的距離,m;α1、αi-1representstheevencoefficientofadditionalstressintherangeofthecalculatingpointofbottomoffoundationtothebottomoftheIlayeraswellasthei-1layerseparately.
α1、αi-1—基礎(chǔ)底面計算點至第i層土,第i-1層土底面范圍內(nèi)平均附加應力系數(shù);ζrepresentsthecoefficientofmodulusofcompositesoil;
ζ—復合土層的模量系數(shù);Ψsprepresentsthecomputationalcorrectioncoefficientofthesettlementofcompositesoil,beingdefinedaccordingtothedataoflocalsettlementmeasurementaswellasconstructionexperiences.
Ψsp—復合土層沉降計算修正系數(shù),根據(jù)地區(qū)沉降觀測資料及經(jīng)驗確定;ψrepresentsthecomputationalcorrectioncoefficientofsettlement,beingdefinedaccordingtothedataoflocalsettlementmeasurementaswellasconstructionexperiences.
ψ—沉降計算修正系數(shù),根據(jù)地區(qū)沉降觀測資料及經(jīng)驗確定。Implementcheckcomputationsseparatelyfollowingtheformulashowingabove:
根據(jù)上式分塊進行驗算:Thecoefficientofmodulusofcompositesoilafterbeingtreated:
經(jīng)處理后的復合土層模量系數(shù):Epsi=ζ*Esiζ=fspk/fkζ=fspk/fk=347.9/110=3.16Thecalculationofsettlementofthemid-pointinfoundationwhenthequasi-permanentvalueofloadingis1355KN.Andtheadditionalpressureatthebottomofthefoundationisp0=1355/2.6/2.6=200.4Kpa.
荷載準永久值1355KN時基礎(chǔ)中心點沉降計算基底附加應力p0=1355/2.6/2.6=200.4KpaNumberoflayer層號Depth深度Modulusofcompressibility壓縮模量Z1Z2Compressibility壓縮量Thevalueofstresscoefficient應力系數(shù)積分值(m)(MPa)(m)(m)(mm)(z2a2-z1a1)12.5212.6400.002.5228.351.788421.2022.1202.523.722.850.314335.1015.8003.728.825.780.455443.4015.8008.8212.221.330.105152.6025.28012.2214.820.300.038160.4015.80014.8215.220.070.005870.8017.38015.2216.020.120.010881.1322.12016.0217.150.120.013890.107.00017.1517.250.030.0011Theequivalentqualityofthemodulusofcompressibility:14.054(MPa)
壓縮模量的當量值:14.054(MPa)Thecorrelationforcalculatingsettlement:0.4375
沉降計算經(jīng)驗系數(shù):0.4375Totalsettlement:0.4375*38.97=17.05(mm)總沉降量:0.4375*38.97=17.05(mm)***Z1representsthedistancebetweenthebottomoffoundationandthetopofthiscomputationalstratification.***Z1--基礎(chǔ)底面至本計算分層頂面的距離***Z2representsthedistancebetweenthebottomoffoundationandthebottomofthiscomputationalstratification.
***Z2--基礎(chǔ)底面至本計算分層底面的距離Thesettlementoftheothermid-pointofloading
其它荷載中心點沉降量Thesettlementofthemid-pointin1219KN1-J1foundation:15.34mm
1219KN1-J1基礎(chǔ)中心點沉降量:15.34mmThesettlementofthemid-pointin1188KN1-J1foundation:14.95mm
1188KN1-J1基礎(chǔ)中心點沉降量:14.95mmThesettlementofthemid-pointin1179KN1-J1foundation:14.84mm
1179KN1-J1基礎(chǔ)中心點沉降量:14.84mmThesettlementofthemid-pointin956KN1-J1foundation:12.03mm
956KN1-J1基礎(chǔ)中心點沉降量:12.03mmThesettlementofthemid-pointin1344KN1-J1foundation:16.91mm
1344KN1-J1基礎(chǔ)中心點沉降量:16.91mmThesettlementofthemid-pointin1236KN1-J1foundation:15.54mm
1236KN1-J1基礎(chǔ)中心點沉降量:15.54mmThesettlementofthemid-pointin763KN1-J1foundation:9.60mm
763KN1-J1基礎(chǔ)中心點沉降量:9.60mmThesettlementofthemid-pointin1169KN1-J1foundation:14.71mm
1169KN1-J1基礎(chǔ)中心點沉降量:14.71mmThesettlementofthemid-pointin866KN1-J1foundation:10.90mm
866KN1-J1基礎(chǔ)中心點沉降量:10.90mmWhenitworksundertheconditionofquasi-permanentvalueofloading,therangeofthesettlementof1-J1foundationis9.60~17.05mm.
荷載準永久值作業(yè)下1-J1基礎(chǔ)沉降范圍在9.60~17.05mmAdditionalsettlement
附加沉降Thecomputationaldepthofsettlementisconsideredtobe22.5meters,andtheadditionalsettlementoftheplaceapart6metersfromthemiddleoffoundation,islessthan0.63mm,hencetheadditionalsettlementaround1-J1foundationcausedbyitshouldnotbetakenintoconsideration.
沉降計算深度按22.5m考慮,在距離基礎(chǔ)中心6.0外產(chǎn)生附加沉降小于0.63mm,固不考慮1-J1基礎(chǔ)對周圍產(chǎn)生附加沉降。The1-J2foundationisaroundthe1-J1foundation,andtheadditionalsettlementoftheplaceapart6metersfromthemiddleoffoundation,causedbyJ2foundation,islessthan0.8mm,hencetheadditionalsettlementofJ1foundationcausedbyJ2foundation.
1-J1基礎(chǔ)周圍為1-J2基礎(chǔ),J2基礎(chǔ)對在距離基礎(chǔ)中心6.0外產(chǎn)生附加沉降小于0.8mm,固不考慮J2對J1基礎(chǔ)產(chǎn)生附加沉降。Conclusion:Thebearingcapacityof1-J2foundationcombinedfoundation≥300KPA
結(jié)論:1-J1基礎(chǔ)復合地基承載力≥300KPAThefinalsettlementoffoundation<40mm
基礎(chǔ)最終沉降量<40mmAnswertheneedsofthetopstructuredesign
滿足上部結(jié)構(gòu)設計要求。1-J2Thestructureoffoundation:2800*2800mm.Arrangethreepilesinactual,detailedinpileplan.
基礎(chǔ)形式:2800*2800mm實際布樁3根,具體詳見樁位圖Theactualreplacementratioofaream=4.8%
實際面積置換率m=4.8%Thecharacteristicvalueofbearingcapacityofcombinedfoundationfspk:316.3(kPa)
復合地基承載力特征值fspk:316.3(kPa)fsp,k=mRk/Ap+αβfk(1-m)=316.32)Calculatingsettlement
沉降計算Thecalculationofsettlementofthemid-pointinfoundationwhenthequasi-permanentvalueofloadingis1883KN.
荷載準永久值1883KN時基礎(chǔ)中心點沉降計算Numberoflayer層號Depth厚度Modulusofcompressibility壓縮模量Z1Z2compressibility壓縮量Theintegralvalueofstresscoefficient應力系數(shù)積分值(m)(MPa)(m)(m)(mm)(z2a2-z1a1)12.5211.4800.002.5238.771.854521.2020.0902.523.724.190.351135.1014.3503.728.828.690.519343.4014.3508.8212.222.010.120152.6022.96012.2214.820.480.046060.4014.35014.8215.220.110.006770.8015.78015.2216.020.190.012481.1320.09016.0217.150.190.015790.107.00017.1517.250.040.0013Theequivalentqualityofthemodulusofcompressibility:12.850(MPa)壓縮模量的當量值:12.850(MPa)Thecorrelationforcalculatingsettlement:0.48
沉降計算經(jīng)驗系數(shù):0.48Totalsettlement:0.48*54.67=26.24(mm)
總沉降量:0.48*54.67=26.24(mm)Thesettlementofthemid-point
中心點沉降量Whenthemaxloadingis1883KN,thesettlementofthemid-pointin1-J2foundation:26.24mm
最大荷載1883KN1-J2基礎(chǔ)中心點沉降量:26.24mmWhentheminloadingis1366KN,thesettlementofthemid-pointin1-J2foundation:19.10mm.
最小荷載1366KN1-J2基礎(chǔ)中心點沉降量:19.10mmWhenitworksundertheconditionofquasi-permanentvalueofloading,therangeofthesettlementof1-J2foundationis19.10~26.24mm.
荷載準永久值作業(yè)下1-J2基礎(chǔ)沉降范圍在19.10~26.24mmAdditionalsettlement
附加沉降Thecomputationaldepthofsettlementisconsideredtobe22.5meters,andtheadditionalsettlementoftheplaceapart8metersfromthemiddleoffoundation,islessthan0.8mm,hencetheadditionalsettlementaround1-J2foundationcausedbyitshouldnotbetakenintoconsideration.
沉降計算深度按22.5考慮,在距離基礎(chǔ)中心8.0外產(chǎn)生附加沉降小于0.8mm,固不考慮1-J2基礎(chǔ)對周圍產(chǎn)生附加沉降。Conclusion:Thebearingcapacityof1-J2foundationcombinedfoundation≥300KPA
結(jié)論:1-J2基礎(chǔ)復合地基承載力≥300KPAThefinalsettlementoffoundation<40mm
基礎(chǔ)最終沉降量<40mmAnswertheneedsofthetopstructuredesign
滿足上部結(jié)構(gòu)設計要求。1-J3Thestructureoffoundation:2900*2900mm.Arrangefourpilesinactual,detailedinpileplan.
基礎(chǔ)形式:2900*2900mm實際布樁4根,具體詳見樁位圖Theactualreplacementratioofaream=5.97%
實際面積置換率m=5.97%Thecharacteristicvalueofbearingcapacityofcombinedfoundationfspk:368.6(kPa)復合地基承載力特征值fspk:368.6(kPa)fsp,k=mRk/Ap+αβfk(1-m)=368.62)Calculatingsettlement
沉降計算Thecalculationofsettlementofthemid-pointinfoundationwhenthequasi-permanentvalueofloadingis1917KN.
荷載準永久值1917KN時基礎(chǔ)中心點沉降計算Numberoflayer層號Depth厚度Modulusofcompressibility壓縮模量Z1Z2compressibility壓縮量Theintegralvalueofstresscoefficient應力系數(shù)積分值t(m)(MPa)(m)(m)(mm)(z2a2-z1a1)12.5213.4000.002.5231.991.885021.2023.4502.523.723.580.369535.1016.7703.728.827.490.552443.4016.7508.8212.221.740.127952.6026.80012.2214.820.520.060960.4016.75014.8215.220.050.003570.8018.42015.2216.020.160.013281.1323.45016.0217.150.160.016790.107.00017.1517.250.050.0014Theequivalentqualityofthemodulusofcompressibility:15.065(MPa)
壓縮模量的當量值:15.065(MPa)Thecorrelationforcalculatingsettlement:0.40
沉降計算經(jīng)驗系數(shù):0.40Totalsettlement:0.40*45.64=18.25(mm)
總沉降量:0.40*45.64=18.25(mm)Thesettlementofthemid-point
中心點沉降量Whenthemaxloadingis1917KN,thesettlementofthemid-pointin1-J3foundation:18.25mm
最大荷載1917KN1-J3基礎(chǔ)中心點沉降量:18.25mmWhentheminloadingis1607KN,thesettlementofthemid-pointin1-J3foundation:15.30mm.
最小荷載1607KN1-J3基礎(chǔ)中心點沉降量:15.30mmWhenitworksundertheconditionofquasi-permanentvalueofloading,therangeofthesettlementof1-J3foundationis18.25~15.30mm.
荷載準永久值作業(yè)下1-J3基礎(chǔ)沉降范圍在18.25~15.30mmAdditionalsettlement
附加沉降Thecomputationaldepthofsettlementisconsideredtobe22.5meters,andtheadditionalsettlementoftheplaceapart7.0metersfromthemiddleofJ-3foundation,is1.5mm.
沉降計算深度按22.5m考慮,在距離J-3基礎(chǔ)中心7.0m處產(chǎn)生附加沉降1.5mm。Thecomputationaldepthofsettlementisconsideredtobe22.5meters,andtheadditionalsettlementoftheplaceapart7.2metersfromthemiddleofJ9foundation,is3.25mm.
沉降計算深度按22.5m考慮,在距離J9基礎(chǔ)中心7.2m處產(chǎn)生附加沉降3.25mm。Sotheadditionalsettlementcausedbythemostdangerousplace
最不利位置產(chǎn)生附加沉降1.6*2+3.25=6.45mm1.6*2+3.25=6.45mmThelargestsettlementofthemid-pointis24.70mm
中心點最大沉降量24.70mmConclusion:Thebearingcapacityof1-J3foundationcombinedfoundation≥300KPA
結(jié)論:1-J3基礎(chǔ)復合地基承載力≥300KPAThefinalsettlementoffoundation(includingtheadditionalsettlementoffoundation)<40mm
基礎(chǔ)最終沉降
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 寫買樹木合同范本
- 2025年浙江貨運從業(yè)資格證考試試題及答案詳解
- 2025年巴彥淖爾c1貨運從業(yè)資格證考試內(nèi)容
- 代理記賬業(yè)務合同范本
- 繡花施工方案
- 專屬定制鞋合同范本
- 公司收購股合同范例
- 養(yǎng)殖土地借用合同范本
- 分包責任合同范本
- 做餐飲合伙合同范本
- 【茶道】宋代點茶道詳解
- 初中語文短語練習(附參考答案)
- 電影篇(二)蒙太奇課件
- MBTI職業(yè)性格測試(可直接使用)
- 2023年副主任醫(yī)師(副高)-推拿學(副高)考試參考題庫有答案
- 《旅游規(guī)劃與開發(fā)》馬勇教授
- 網(wǎng)絡安全技術(shù)與應用PPT完整全套教學課件
- 生產(chǎn)車間管理制度辦法
- 12j912-2常用設備用房
- 質(zhì)量獎與自評報告
- 機電企業(yè)管理導論第1章課件
評論
0/150
提交評論