




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、,BGA / SMD Rework Center,ERSA IR 500 A and PL 500 A,BGA Repair: a better understanding can reduce fears, reduce costs, and guarantee process control,Density and performance requirementsDriving IC packing toward the size of the bare die,Trends in Flip Chip use,The Global Trend to Area Array Packages,
2、BGA,CSP, Flip Chip: Structural Designs,BGA Production - Collapsible and Non-collapsible Area Array Packages,In general, eutectic solder balls (Sn63Pb37) are always used for area array packages except in the case where the weight of the component is greater than the surface tension of the molten ball
3、s during reflow. A CBGA (ceramic BGA) is a typical example of a component that could not be “carried“ by the surface tension of the solder balls during the reflow process. In this case, a high melt ball, for example Pb90Sn10, is used because it will remain solid during the normal reflow process.,Bal
4、l Comparison Photos,Comparison of Installed PBGA to a CBGA,The above figures detail the different wetting zones, and wetting angles between a PBGA and CBGA and their respective joints.,The Soldering Process - The Intermetallic Bond and itsRelation to Reflow Temperature,The heart of the solder joint
5、Source: R.J. Kleinwassink, Soldering in the electronics,The lasting mechanical connection can only be achieved when tin-lead (solder) is introduced to form a lasting intermetallic bond between the lead and land and both are heated to approx. 30C above the melting point of solder.,Scanning electron m
6、icrograph (SEM) of fractured intermetallic layers of a solder joint. Cu3Sn (e-phase) and Cu6Sn5 (n-phase) make up the intermetallic layers.,Typical Reflow Profiles,Infrared-soldering. Temperature/time-profile (lead-temperature).Full-line: typical process / dotted-line: process limits,Temperature-tim
7、e curves obtained in a hot-air circulation oven. Source: R.J.Klein-Wassink,Reflow solder profile CECC 00 802: CECC Standard Method for the Specification of Surface Mounting Components (SMDs) of Assessed Quality.,A. BGA solder ball (Sn63PB37) placed on pad before reflow process begins. Stand-off heig
8、ht is, for example, 1.0 mm (ball shape under component is perfectly spherical, surface is smooth and dull).,B. Reflow process begins until melting point of solder ball is reached (183C), gravity acts on component and causes an initial or single drop: Stand-off height is 0.8 mm (ball shape is vertica
9、lly elongated, surface is rough and matt).,C. Peak temperature is reached in the reflow process allowing for complete and proper wetting of entire pad. A second or double drop occurs: stand-off height is 0.5 mm (ball shape is horizontally pressed or somewhat elliptical, surface is smooth and shiny).
10、,BGA Production - Typical Physical Effects during a Reflow Process,The typical physical effects during the reflow process of a PBGA are graphically shown in the figures below with regards to the stand-off height and wetting angle.,Double Drop Effect by BGA/CSP/Flip Chip (Sn63Pb37 Balls),1st Drop2nd
11、Drop,Graphic depicts a non-solder mask defined (NSMD) pad,Note: Life cycle test results show that NSMD pad on both board and package give superior performance to when solder mask defined (SMD) pads are used. Source:Reliability of BGA Packages in an Automotive Environment, Roger Rrgren, Per-Erik Tege
12、hall and Per Carlsson, IVF - The Swedish Institute of Production Engineering Research, www.ivf.se,BGA Double Drop Effect Documented by Philips CFT,Source: BGA Joint Formation, Jan Kolsters, Philips CFT, Eindhoven, Netherlands, May 2000,Video clip of BGA joint formation revealing the double drop effe
13、ct. The video was generated using the ERSASCOPE Inspection System.,Click here to begin video,A cross-section of a PBGA 225 after a proper reflow process reveals the complete wetting to the pad and the proper wetting angle of the flux residue.,Cross-section of proper Double Drop PBGA,Cross-section of
14、 PBGA 225 after Soldering,BGA Self-Alignment Effect,The self-alignment effect as the solder balls go into reflow,BGA Self-Alignment Effect Documented by Philips CFT,Source: BGA Joint Formation, Jan Kolsters, Philips CFT, Eindhoven, Netherlands, May 2000,Video clip of BGA joint formation revealing th
15、e self-alignment effect. The video was generated using the ERSASCOPE Inspection System.,Click here to begin video,BGA Repair: Hot Air Systems,BGA Repair: Hot Air vs. IR,Heat distribution across surface of BGA - convection and dark IR,Typical BGA Problems: X-ray Inspection,Deformed balls, i.e. non-sp
16、herical,Missing ball, solder bridging,Non-uniform solder quantity,Voids,Misregistration,CBGA soldered to PCB,X-ray image of CBGA after soldering,ERSASCOPE image of CBGA. Cracking zone is visible,X-ray image of PBGA 225:A and B show mistakes but are unclear of source,A. ERSASCOPE reveals flux residue
17、 bridge with conductive particles,B. ERSASCOPE shows incomplete solder melt of paste.,B,A,Typical BGA Problems: Visual Inspection and X-ray combined,Dark IR vs. light IR for PCB-reflow applications,Wavelength ranges of some radiation sources and their position in the spectrum of electromagnetic wave
18、s.,The top and bottom ERSA dark IR radiators are medium wavelength (2-8 m), which has been proven to have the optimal absorption/reflection radio between light and dark colors. The component body, substrate, and leads are safely and evenly heated, thereby reducing any risk of damage during the reflo
19、w process.,ERSA Dark IR BGA Repair: Uniform Heat Distribution,Heat distribution across surface of BGA 169,BGA Repair: Production like results with IR 500A,Source: Fraunhofer Institut ISIT, Itzehoe, Germany,Rework Equipment Purchase Decision Flow Chart,2. Repeatability - User-Friendly?,3. Flexibility
20、 - Chips, Plastic, BGA, PTH,.?,- Initial Investment? - Cycle Time? - Nozzles, etc.? - Spare Parts, e.g. heaters?,4. Return on Invest - Operational Costs ?,PL 500 A: Optical BGA / SMD Placement System,Motorized Z-axis,Zoom, and FocusSplit OpticsAuto ZoomPre-setsAuto Vac Pick-n-PlaceTwo Camera Inputs
21、/ Auto Switch Stand alone or fully integrated,BGA, CSP, Flip Chip Precision Placement and Reflow,ERSA IR 500 A International Users List,ABB ADI AGFAAIRSYS NavigationArab Britisch Dynamics Co.ASG LuftfahrttechnikBertelsmann Blaupunkt BORAQ Bosch British Aerospace Cellstar COMPAQComtech Data-Fax DIALOG Semiconductor Digitron da AmazoniaEFACEC EFORE Oy EIA-Electronica AvionicosELABO GmbH Ericsson ComponentsEricsson Radio SystemsFAST Link Fischer ElektronmechanikFraunhofer Institut Gallyas S.A.GLOBAL NETGrundig,HCL Heidelberger DruckmaschinenI.S.T.-InstitutoIBMIn
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 七年級(jí)地理下冊(cè) 7.1 日本教學(xué)設(shè)計(jì) 湘教版
- 2 做中華人文精神的弘揚(yáng)者公開課一等獎(jiǎng)創(chuàng)新教學(xué)設(shè)計(jì)- 統(tǒng)編版道德與法治七年級(jí)下冊(cè)
- 人教版歷史與社會(huì)八年級(jí)下冊(cè) 6.2《連通世界的新航路》教學(xué)設(shè)計(jì)
- 幼兒律動(dòng)編創(chuàng)流程
- 2025年度商務(wù)禮儀知識(shí)競賽試題及答案(一)
- 小學(xué)統(tǒng)編版(2024)騎鵝旅行記教學(xué)設(shè)計(jì)及反思
- 魯教版化學(xué)(五四學(xué)制)八年級(jí)4.3《到實(shí)驗(yàn)室去:氧氣的實(shí)驗(yàn)室制取與性質(zhì)》教學(xué)課件
- 租賃合同及訂單處理流程
- 重慶房屋買賣合同范本
- 廚房衛(wèi)生間裝修合同
- 2025年度光伏發(fā)電工程質(zhì)量保修服務(wù)協(xié)議3篇
- 心理戰(zhàn)心理策略-洞察分析
- 二年級(jí)語文下冊(cè) 識(shí)字 口語交際 長大以后做什么教學(xué)實(shí)錄 新人教版
- 外協(xié)單位進(jìn)廠安全
- 心肺復(fù)蘇術(shù)-cpr課件
- 影視動(dòng)畫產(chǎn)業(yè)升級(jí)-洞察分析
- 高中政治第3課時(shí)《正確對(duì)待外來文化》教學(xué)設(shè)計(jì)
- 2024年度社區(qū)工作者練習(xí)題庫可打印
- 2024年形勢(shì)與政策 第二講 中國經(jīng)濟(jì)高質(zhì)量發(fā)展扎實(shí)推進(jìn)(課件)
- 數(shù)字鄉(xiāng)村農(nóng)村信息化服務(wù)平臺(tái)建設(shè)方案-數(shù)字農(nóng)村信息化云服平臺(tái)建設(shè)方案
- 專題04 三角函數(shù)-備戰(zhàn)2025年高考數(shù)學(xué)真題題源解密(新高考卷)解析版
評(píng)論
0/150
提交評(píng)論