外文翻譯--多繩摩擦式提升機換繩新工藝_第1頁
外文翻譯--多繩摩擦式提升機換繩新工藝_第2頁
外文翻譯--多繩摩擦式提升機換繩新工藝_第3頁
外文翻譯--多繩摩擦式提升機換繩新工藝_第4頁
外文翻譯--多繩摩擦式提升機換繩新工藝_第5頁
已閱讀5頁,還剩7頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)

文檔簡介

1 Multi-rope friction hoist rope for new technology Multi-rope friction wire rope replacement, it is usually the use of four fixed steady string of new cars of old rope, process complexity, construction personnel and VI in the well shaft operations, the risk of larger and longer mine production. So how to replace the main wire rope hoist such more security, time-saving, has been the goal of research 。 1、 Construction of preparation (1)in advance of the wedge-shaped hanging backup detection device on the new wire rope testing, in line with the “Coal Mine Safety Regulations” section of the relevant provisions of 402, the measurement of size, were cut into four entangled in rope roller 4 on, according to the requirements of twist put on the north side of the derrick, and fixed. (2)North derrick hook in the appropriate location of the fixed beam-oriented round of four in order to smooth movement of wire rope. (3)Automatic adjustment of leveling out the volume of the fuel tank of a lever, the first self-balancing so that the fuel tank of the South Hook Balancing tanks at their respective cut-off rope. (4)Ready to use long and short board, long board needs three, the need for a short eight boards. (5)Ready to adequate and reliable lighting facilities, as well as the signal, wire, wood, and commonly used tools such as I-steel, and check their eligibility. 2 2、 Construction of steps (1) Top-down clean-up platforms, derrick and shaft, removal of roller shield. VI well above the old string with new string, specific methods are as follows: Cans will be parked in the south tank top level VI and the location of wells; VI in wells adjacent to the north can take the work platform, the new rope through the window well wall Tabei VI and four driven wheels, and four cans of the old North ropes long, respectively, 3m, slightly small bundled, tied for the new Departments (new rope in the old side). Specific binding is as follows; first one 3m long hemp rope around 1m intensive new rope, hemp rope and then the remaining entangled in the original location of the new justice will be the new and old ropes tied together, the hemp rope tied after water immersion (tied up a litter wet before the small), At the same time, decentralization of the South can tank the new string, using the same method with the above-mentioned first since the beginning of each new interval 10m rope firmly tied up with the old rope, wire rope when the new tank to the South side, and well above the first VI flush steel stops, can work to dismantle the North well head platform. In the four-storey tower platform wells, using a dedicated card in the North side of the tank 4 prison in order to prevent the new rope to escape, and then cut off all of the hemp rope tied to the new and the old rope separately. Five-storey tower in the wells, the South side of the new cans with rope sling jail card, with four new road will be the appropriate height of lifting rope to the main drive roller can not rotate a new justice prevail, then the human will be four to the second floor of the new platform. 3 (2) The South can head the new wire rope hook. The South Side can wedged-shaped with four back-up devices to connect firmly hanging; to the old and new wire rope hanging device of the alignment, the use of hemp rope tied firmly. The second floor on the first pressure hydraulic pump with the South can automatically balance the fuel tank connecting pipe even after the good, the total cut-off to open the door a little to the fuel tank of the oil pump to suppress all Add, and then South automatic hydraulic hook Unicom balance tube to remove the fuel tank and on a designated location. Finally, the slow decentralization of the Southern cage hook, a new extra rope taut. (3) Shaft with a new rope. Long sling to remove five boards and four sub-board anti-back channeling, and four new chairs were placed on the corresponding slot on the west side of the old rope suitable location. Three-storey tower in the well platform, the South side of the new cans, the old rope a long board with a daughter card to pay in jail, and then in the long upper and lower sun-board 4 of the card to pay a small board. Hoist speed with low-frequency southern decentralization cans, at the same time, four ropes to the corresponding roller speed put to justice; At this point, three-tiered platform in the wells south tower tank side, since the first sub-board pay long bundled together from every 6m hemp rope (the same method mentioned above) and timely water immersion, respectively, at intervals of 50m to pay a small four-card sub board. When the second floor of the South four wedge-shaped cage hook hanging device. (4) The replacement of the South four wedge-shaped cage hook 4 hanging device. Well fist of all in the four-storey tower, the south and east-west direction of wire rope hook emission No.2 2o I-beam, four in its place above, and the South Hook old jail 4. by the shearer two 20t chain hoist with hook cage will Northern; lot with two hoist, lifting cans southern appropriate height, the replacement of the eastern side of the first two hanging devices, specific methods are: using 12.5mm rope hoist it would be cape and hydraulic telescopic self-balancing device body, followed by removal of the eastern side of the two wedge-shaped hanging type linked to the original device. Then, the first installation of the new East from the second wedge-shaped only hanging device, and then install the East from the first wedge-shaped hanging new home. replacement of the west side of the two wedge-shaped only hanging device, the replacement of finished hemp rope to use old and new wire rope hanging device firmly bundled counterpart. (5) In the second floor of the new wire rope cut-off platform, and a new wedge-shaped hanging rope and back-up device connected. (6) The replacement of the North hook hanging cage four wedge-shaped device. first pump pressure on the second floor of the North can fuel tank of the hydraulic self-balancing good even after the connecting pipe, the total cut-off to open the door a little, the fuel tanks of the oil pump to suppress all Add , and then North hook automatic hydraulic Unicom balance tube to remove the fuel tank, put away , pull two hooks 20t hoist cage will Northern appropriate high level of lifting, running from east to west in accordance with the gradual replacement of the end, 5 removed the old rope, and to dismantle working platforms. (7) Rope groove back. Four-storey tower in the well child with a long board to the north side of the hook 4 new and 4 old rope firmly. 12.5mm wire with cap and traffic will be the new and old rope hanging to the old and new wire rope led from the round, starting from the east, followed by the old rope from the leading wheels, tank-oriented round of rope out, and Add new rope groove in turn, led on the old rope round or rounds of pad-oriented on the (eastern side of the rope groove). Wells to remove board tower with four sub. (8) Recovery of the old rope. At the same time, North hook hanging loose cage of two20t hoist will be closed until the new cage force of wire rope, lifting appliances, dismantled, and the old four corresponding bundled with the new wire rope. Removal of underground organizations in Southern constructors cage hook lifting equipment and work platforms. Starting distance from the winch, and a I-beam removal of. After checking no problem to begin with low-frequency North hook cage decentralization, with the old rope through human well-oriented round of the four 1:3 corresponding rope drag on the roller, at the same time, new and old ropes and Negro In addition. When the South Hook 1:3 wells can reach the top of the appropriate parking location, using gas cutting steel wire rope in the old cut-off above the first hook, and drag the working area without prejudice. Well 1:3 in the appropriate location. North side of the tank 4 old rope cut by gas cutting, and then to the north side of the tank 4 with 6 the corresponding old new rope tied solid and well-head side of the South can take temporary work platform. Starting winch, hook cage south decentralization, while the remaining out of the old rope, after the removal of temporary work platform. (9) Transfer to justice, after all, no problem, winch test run, commissioning a variety of protection. 3、 Construction Notes (1) Signal is the key to the construction, we must set up the command center, put to justice and enhancing the signal to separate the signals, at least to prepare two sets of signals, and winch drivers, put ropes and other staff to participate in the construction clearly. (2) The length of board and hand chain hoist, and early tests, such as appliances, and construction must be firmly card. (3) In the interception of a new rope should be based on precise calculation of the amount in advance from a good length of rope, new rope can not be truncated, otherwise, would be lost by the wayside, causing a greater loss. (4) Use of this method with the traditional solid car with rope method, the construction time is short. Cao coal for the use of this method were used rope 19.5h, save time 1/3 polyunsaturated. 4、 Conclusion (1) Of this method with the traditional solid car with rope method, the 7 construction time is short, Cao coal for the use of this method were used rope 19.5h, save time 1/3 polyunsaturated. (2) Low-cost construction. This method saves the cost of steady rental cars, a construction can save about 25,000 yuan. (3) High degree of safety, reduce labor intensity. Minimization of this method in the construction of the shaft to raise the safety factor, without a fixed rope roller, just the direction of the rope can be placed, the short preparation time. 1 多繩摩擦式提升機換繩新工藝 多繩摩擦式提升機在更換鋼絲繩時,通常使用四部固定穩(wěn)車舊繩帶新繩,工藝復(fù)雜,施工人員多在井口和井筒作業(yè),危險性較大,而且礦井停產(chǎn)時間長,因此如何在更換此類提升機主鋼繩中更加安全、省時,一直是人們研究的目標(biāo)。 1、 施工準(zhǔn)備 ( 1)提前對備 用楔形掉掛裝置進(jìn)行探傷,對新的備份鋼絲繩進(jìn)行測試,符合煤礦安全規(guī)程的 第 402條相關(guān)規(guī)定,測量尺寸,截成四段分別纏在四只繩滾上,按捻向要求防御井架的北側(cè),并固定好。 ( 2)在井架北鉤橫梁合適位置固定四個導(dǎo)向輪,以便鋼絲繩能夠順利運動。 ( 3)調(diào)整自動平整油缸杠桿的伸縮量,首先使南鉤自動平衡油缸杠桿的伸縮量一致后,關(guān)閉南鉤個自動平衡油缸的分截止閥,運行一天后,再量取南北兩鉤個油缸杠桿的伸縮量,并記錄好,作為截繩的依據(jù)。 ( 4)準(zhǔn)備好卡繩用的長、短板卡,長板卡需要 3 副,段板卡需要8副。 ( 5)準(zhǔn)備好充足的照明和可靠地信號設(shè)施以及棕繩、鐵絲、木板、工字鋼以及常用工具等,并檢查是否合 格。 2、 施工步驟 ( 1)自上而下清掃平臺、井架及井筒,拆除滾筒護(hù)板。井口以上 2 用舊繩帶新繩,具體方法為: 將南罐停在灌頂與井口平的位置;在井口北罐側(cè)搭工作平臺,將新鋼絲繩穿過井塔北墻窗及四個導(dǎo)向輪,并與北罐四根舊繩分別用長 3m 長小棕繩捆綁在一起,新繩頭處連續(xù)捆綁三道(新繩在舊繩西側(cè))。具體捆綁方法是:先用 3m 長麻繩的其中 1m密集纏繞新繩,再用剩余的麻繩在原來纏繞新繩的位置將新、舊繩捆綁在一起,綁完后用水將麻繩浸透(捆綁前小棕繩稍濕)。 下放南罐同時放新繩,用與上述同樣的方法自第一道棕繩七每間隔 10m將新繩 與舊繩捆綁牢固,當(dāng)新鋼絲繩繩頭到達(dá)南罐側(cè),并與井口以上第一道鋼梁平齊時停車,拆除井口北罐工作平臺。 在井塔四層平臺上,用專用板卡在北罐側(cè)將四根繩卡牢,以防止新繩回竄,然后。割掉所有捆綁的麻繩,使新繩與舊繩分開。在井塔五層,將南罐側(cè)新繩用吊繩卡卡牢,用行車將四根新繩吊起適當(dāng)高度,以主滾筒不能帶動新繩轉(zhuǎn)動為準(zhǔn),然后用人力蔣四根新繩托至二層平臺。 ( 2)南罐新鋼絲繩上鉤頭。將南罐側(cè)四根繩頭分別與四個備用楔形吊掛裝置連接牢固:將新、舊鋼絲繩的吊掛裝置對齊后,用麻繩牢固的捆綁在一起。先將二層上的打壓泵與南罐液 壓自動平衡油缸聯(lián)通管拆除,并放到一指定地點。 緩慢下放南鉤罐籠,拉緊多余的新繩。 ( 3)井筒新鋼絲繩子。 拆除五層吊繩的長板卡子及四層防回竄板卡,并將四根新繩分別放在與其對應(yīng)的舊鋼絲繩槽西側(cè)合適位置。在井塔三層平臺上,將南罐側(cè)新、舊鋼絲繩用一副長板卡卡牢,然后在長板卡的上下個卡 4副小板卡。 提升機用低頻速度下放南罐,同時,四個繩滾子以相應(yīng)的速度放繩;此時,在井塔三層平臺南罐側(cè),自第一副長板子起每隔 6m 捆綁一道麻繩(方法同上述)并及時澆水 3 浸透,每隔 50m分別卡 4副小板卡子。當(dāng)北罐接近井口二層平臺時停車, 帶繩結(jié)束。 ( 4)更換南鉤罐籠四個楔形吊掛裝置。首先在井塔四層,南鉤鋼絲繩東西方向并排放兩根 20號工字鋼,在其上面放四個卡繩器,并將南鉤四根舊繩卡牢。用兩只 10T葫蘆配合采煤

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論