土木工程術(shù)語(yǔ)_第1頁(yè)
土木工程術(shù)語(yǔ)_第2頁(yè)
土木工程術(shù)語(yǔ)_第3頁(yè)
土木工程術(shù)語(yǔ)_第4頁(yè)
土木工程術(shù)語(yǔ)_第5頁(yè)
已閱讀5頁(yè),還剩9頁(yè)未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、英文全名或定義FULL NAME OR DEFINITION中文意義CHINESE MEANING縮寫(xiě)ABBRAbove Ground地面上AGAbutment橋臺(tái)ABUTAcceptance Quality Level可接受質(zhì)量水平AQLAcoustical隔音AC0USAdit隧道橫坑Advanced Shoring Method支撐先進(jìn)工法ASHAggregate Subgrade級(jí)配料基層ASRAllowable Compressive Strength ofConcrete混凝土容許抗壓強(qiáng)度FcAllowableTensile Stress of Steel鋼材容許應(yīng)力FsAlter

2、native交錯(cuò)/排列/替代也TAluminum鋁MUMAnchor Bolt錨栓伯Asbestos Concrete Pipe石棉管ACPAsphalt Concrete瀝青混凝土ACAt Grade地面段A / GAzimuth方位角AZBalanced Cantilever Mothed懸臂工法BCMcmBasement地下室BSMTBeam梁BMBearing支承BRGBeginning of simple Circular Curve單曲線起點(diǎn)BCBeginning of Vertical Curve豎曲線起點(diǎn)BVCBench臺(tái)階BBench Mark水平標(biāo)準(zhǔn)點(diǎn)/水平點(diǎn)BMBent彎

3、BTBottom底(層)BOTBottom of Footing基礎(chǔ)底面BOFBoundary Line邊界線BLBox Culvert箱涵BOXCadaster Map地籍圖CMcmCast In Place Concrete場(chǎng)鑄混凝土CIPCCast Iron鑄鐵CICast Iron Pipe鑄鐵管CIPCast-iron Pipe鑄鐵管CIPCatch Basin陰井CBCenter Line中心線C1Center of Gravity of Prestressing Tendons預(yù)力鋼鍵坐標(biāo)(重心)CGSCenter To Center中心距CTCChainage測(cè)煉/里程CHCi

4、vil design Criteria土木設(shè)計(jì)準(zhǔn)則Civil Engineering土木工程CEClearance凈空CLClearance Line凈空線CLLClothoid克羅梭曲線Column柱COLColumn Tie-bar柱箍筋CTCompressive Strength of Concrete混凝土抗壓強(qiáng)度Fc,Concrete混凝土CONCConcrete Grouted Rock混凝土砌卵石CGR.Concrete Masonry Unit混凝土磚CMcmUConcrete Molded Unit混凝土空心磚CMcmUConstruetion Joint施工縫/收縮縫CON

5、ST, JTContinue繼續(xù)CONTControl Joint / Construction Joint控制縫/施工縫CJCorridor通路/走廊CORRCross Heading橫坑(隧道)CHCross-Road交叉路C / RCurtain Wall帷幕墻cwCut and Cover明挖覆蓋C&CCut and Cover Method明挖覆蓋工法CCMcmCombined Services Drawings綜合服務(wù)圖CSDDesign,Construction and Function Test設(shè)計(jì)施工測(cè)試(統(tǒng)包)DCFTDead Load呆重/靜重DLDesigned Gro

6、und Level設(shè)計(jì)地面高程DGLDiameter r直彳仝DIADowel預(yù)留鋼筋DWLDelivery Route Drawings提報(bào)路徑圖DRDDrill and Blow鉆炸法D&BEach每個(gè)EAEnvironmental Impact Assessment Rpt環(huán)境影響評(píng)估報(bào)告EIAEach Way雙向EWEarth Pressure Cell土壓計(jì)EPElevation高程ELElevation(Height)立面ELElevation(View)ELEVEmbedded Plate預(yù)埋底板EMB. PLEqual Space等距EQExcavation開(kāi)挖EXCExhau

7、st排氣EXHExisting Ground Level現(xiàn)地高程EGLExisting Top of Pavement現(xiàn)有鋪面頂ETPExpansion Joint伸縮縫EJFar Face遠(yuǎn)側(cè)面FFFault斷層FFiber Glass Reinforced Concrete強(qiáng)化玻璃纖維混凝土FRCFinished Floor Level樓板地面完成高程FFLFinished Ground Level地面完成面高程FGLFixed Point / Fix End固定點(diǎn)/固定端FFloor Drainage地板落水/地板排水FDFooting基腳FTGFoundation基礎(chǔ)FDNFull S

8、pan Precast Launching Method全跨預(yù)鑄推進(jìn)工法FPLMFull Span Supporting Method / Full StagingMethod就地支撐場(chǎng)鑄工法/全跨支撐工法FSMFull Superelevation全超高Function Test功能測(cè)試Galvanized鍍鋅GALVGalvanized Iron Pipe鍍鋅鐵管GIPGauge軌距/板厚GAGeological Map地質(zhì)圖Geological Time Schedule地質(zhì)時(shí)間表Glassfiber Reinforced Concrete玻璃纖維強(qiáng)化混凝土GRCGlobal Posit

9、ioning System全球定位系統(tǒng)GPSGround地面GGround Level地面高程/地基高程GLGround Water Level地下水位GWLGuided Expansion Bearing導(dǎo)向伸縮支承GEBHandhole手孔HHHeel of Crossing橫斷面交趾點(diǎn)HCHeight of Water水深HWHigh Point高點(diǎn)HPHigh Strength Bolt強(qiáng)力螺栓HSBHigh Tension Strand高拉力鋼索HTSHigh Tension Wire高拉力鋼線HTWHigh Water Level高水位HWLHighest High Water L

10、evel最高洪水位HHWLHinged餃支HGHorizontal Intersection Point平面交叉點(diǎn)HIPHorizontal Line水平線HLHydraulic Piezometer水壓計(jì)HYPn Place Inclinometer傾料計(jì)IPInlet進(jìn)水井INLnner Face內(nèi)面IFnside Diameter管內(nèi)徑IDnterface Demarcation Drawings界面區(qū)分圖IDDIntersection Point交連點(diǎn)IPnvert仰拱nvert Elevation仰拱高IEnvert Level仰拱面高程ILJoint接縫JTKnock Out預(yù)留開(kāi)

11、口(孔)KOLean Concrete低強(qiáng)度混凝土LCLength of Circular Curve曲線長(zhǎng)LCCLength of Spiral緩和曲線長(zhǎng)LSLength of Vertical Curve豎曲線長(zhǎng)LVCLive Load活載重LLLoad Cell荷重計(jì)LoCLow Point低點(diǎn)LPLower Water Level低水位LWLManhole人孔VIHMark記號(hào)VKMean Sea Level平均海平面ISLMean Water Level平均水位WLMiddle of Vertical Curve豎曲線中點(diǎn)MVCMinimum Yield Stress of Stee

12、l鋼材最低降伏應(yīng)力強(qiáng)度FyMovable Scaffolding System逐跨場(chǎng)鑄工法/活動(dòng)支撐系統(tǒng)MSSXear Face近側(cè)面NFXew Austrian Tunnelling Method新奧工法NATMXonGuided Expansion Bearing非導(dǎo)向伸縮支承XGEBNormal Water Level常水位NWLXorth北NObservation Well觀測(cè)井OWOffset支距OFSOn Center中心點(diǎn)0COpening開(kāi)孔0PNGOpposite反向0PPOriginal Ground Line原地面線0GLOut Side Face / Outer Fac

13、e外側(cè)面OFOutside Diameter外徑0DPedestrian Bridge人行橋PED BRIGPedestrian Underpass人行地下道PED U / PPerpendicular垂直P(pán)ERPPile Cut Off樁頭打除PCOPlain Concrete無(wú)筋混凝土PCPoint占PTPoint of Contraflexure撓曲點(diǎn)CFPoint of Curve to Curve曲線連結(jié)點(diǎn)ccPoint of Curve to Spiral / Cutting Slope緩曲線起點(diǎn)/開(kāi)挖坡面csPoint of Curve to Tangent / Cable Tr

14、ough切線點(diǎn)/電纜槽CTPoint of Intersection交錯(cuò)點(diǎn)PIPoint of Spiral to Curve緩和曲線交點(diǎn)SCPoint of Tangent to Curve切線交點(diǎn)TCPoint of Tangent to Spiral切線緩和曲線交點(diǎn)TSPoint of Tangent to Tangent切線與切線交點(diǎn)TTPoint of Vertical Intersection豎曲線交點(diǎn)PVIPrecast Reinforced Concrete預(yù)鑄鋼筋混凝土PRXPrecast Segmental Method預(yù)鑄節(jié)塊工法PSMPressure Gauge壓力計(jì)P

15、GPrestressed Concrete預(yù)力混凝土PSCPrestressed Concrete Pipe預(yù)力混凝土管PSCPPrestressed Concrete / Process Control預(yù)力混凝土 /制程管控PCProcess Quality Control制程品管PQCProfile Grade縱坡PGProfile Grade Line縱坡線PGLProjection投影圖PROJProperty Line地界線PLPVC Pipe塑料管PVCPRain Water DownPipe雨水落水管RWDPRandom Number隨機(jī)函數(shù)RNRandom Sampling隨機(jī)

16、抽樣法RSReference Line參考線RLReinforced Concrete鋼筋混凝土RCReinforced Concrete Box鋼筋混凝土箱涵RCBReinforced Concrete Wall鋼筋混凝土墻RCWReinforcement鋼筋RE INFReinforcing Bar Strain Gauge鋼筋應(yīng)變計(jì)RGReject Number拒收數(shù)RNRetaining Wall擋土墻RWReverse Circulation Pile / ReinforcedConcrete Pipe反循環(huán)(基)椿/鋼筋混凝土管RCPRight Of Way路權(quán)ROWRiser /

17、 Radius階梯踏高/半徑RRock Bolt巖錨RBRock Quality Directive巖石品質(zhì)指導(dǎo)RQDRoller滾動(dòng)支承RRSampling Inspection抽樣檢驗(yàn)SISchedule時(shí)程SCHSea Level海平面S / LSelection選擇SELSequential excavation and support連續(xù)開(kāi)挖及支撐SESSetting Out Point定位點(diǎn)SOPSettlement Marker沉陷計(jì)SMSettlement Rod沉陷桿樁SRShotcrete噴凝土SHCShoulder路肩SHLDSingle單.SGLSlope / Scal

18、e坡度/比例SSound Barrier隔音墻SBSpacing間距SPASpecification規(guī)范SPECSpiral / Steel Pipe螺筋/鋼管SPSquare廣場(chǎng)SQStainless Steel不銹鋼ssStainless Steel Pipe不銹鋼管SSPStairs/ Straight樓梯/直通STRStation測(cè)站/樁號(hào)/車(chē)站STASteel鋼STLSteel Reinforced Concrete鋼骨鋼筋混凝土SRCSteel Reinforced Concrete / StructureReinforced Concrete鋼骨混凝土 /結(jié)構(gòu)混凝土SRCStirrup箍筋STIRStorage貯藏STORStrain Transducer應(yīng)變感應(yīng)計(jì)STTStructural Electrical and Mechanical結(jié)構(gòu)機(jī)電圖DrawingsSEMStructural Floor Level結(jié)構(gòu)樓版面SFLSuper Elevation / Structure Engineering超高/結(jié)構(gòu)工程SESuspended懸吊SUSPSymmetrical對(duì)稱(chēng)的/勻稱(chēng)的SYMSystematic Random Sampling系統(tǒng)隨機(jī)抽樣法SRSfemporary Invert臨時(shí)仰拱TIrhickness厚TH

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論