




下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
1、ie工程師英文簡歷模板ie工程師英文簡歷模板name: mr. yjbys gender: malewedlock: single nation: hanresidence: guangdong-qingyuan age: 28location: guangdong-dongguan height: 173cmtarget locations: guangdongtarget positions: industry/factories-industrial engineerindustry/factories-production management clerkindustry/factor
2、ies-technic engineertarget jobs: industrial engineer、 lean engineereducation2005-09 2009-07 guangdong university of technology industral engineering bachelor degreetraining2008-12 2008-12 guopei certificate internal quality auditor training &qualificationcompany name (2011-07 present)company typ
3、e: private enterprise company category: electrical,micro-electronicsjob title: industrial engineer positions: industrial engineerjob description: 1.npi: process planning, fixture and equipment planning, prepare process checklist2.standard time and capacity evaluation, line balance and prepare sop fo
4、r new products3.maintain the usage of the consumptive material, standard time and capacity4.perform line balance and improve process to rise capacity5.design and improve the tools and fixture in the work site6.monitor the efficiency of the production line, analyze these reasons manpower, machine, ma
5、terial , environment, method, push the relative dept to solve issues7.kaizen project planning and push: auto-machine introduce, production way optimize, manpower and material saving, etccareer highlight:1.auto-welding machine introduce: welding process operator saving(16 operators-12 operators=4 ope
6、rators), line balance rate upgrade from 83% to 91%, solder wire saving 3.2grams, cost of solder wire saving 1.6 yuan rmb for each pcba.2.auto-packaging production line planning and implement: master carton packaging operator saving, every production line deploy 2 packaging operators for 8 lines, aft
7、er introduce the new equipment it takes only 5 operator to seal the master carton3.rear cabinet pre-process and final assembly combine: manpower saving include 1 conveyer, 1 visual inspector, 1 loading operator and 1unloading operator(total 4 operators), and saving the usage of bubble bag and partit
8、ion board4.decorative plate incoming package improvement: change the package material and simplify package way to reduce pack cost(from 0.13yuan to 0.09yuan rmb) and cut down unpack operation time( saving 12 seconds)5.cooperate with rd to change pcba process from dispensing process to solder paste p
9、rocess, in order to cut down welding failure rate after wave-soldering. in this case charge of pcba fixture design and improvement evaluation(repairing welding time 140sec reduce to 70sec,4 repair welding operators cut down to 2 operators)6.according to the small order quantity of the product, study
10、 the less humanizing process for small products to reduce the change over loss time(38 operators*30minute-20 operator*40minutes=340minutes) and improve 8% of the motion effective ratereason for leaving: not very good economic benifit of the company,little chance to promote both in position and welfa
11、recompany name (2009-07 2011-06)company type: joint venture company category: electrical,micro-electronicsjob title: junior engineer positions: industrial engineerjob description: 1.establish and maintain the standard labor time, perform line balance to improve production capacity2.load capacity ass
12、essment: base on the mps and the capacity of production line to forecast the workforce requirement3.prepare the cost study report for new products, labor rate evaluate basis on factory operating cost, provide quotation to customer for special process4.prepare the workshop layout and line layout desi
13、gn basis on logistics analysis5.research and develop new packaging method, develop new suppliers for packing material, make order for new packing material and follow up the schedule6.deal with customer complaint and settle products packaging issue, improve packaging method to satisfy customercareer highlight:1. function test man-machine operation improvement: cooperate with te to disassembleand rearrange test item, and modify the way of program display in the monitor, in orderto realize one person simultaneously operate two test machine2. line balance improvement: provide the cycle t
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年調(diào)酒師考試中需特別關(guān)注的法規(guī)知識試題及答案
- 2025上海市住宅裝飾裝修施工合同
- 高三語文周測練習(xí)大練習(xí):9答案
- 愛護眼睛繪畫課件
- 幼兒園五四愛國教育
- 2025租賃合同可撤銷
- 2025公寓買賣合同模板
- 【+高中語文+】《裝在套子里的人》課件+統(tǒng)編版高一語文必修下冊
- 2025企業(yè)租賃經(jīng)營的合同
- 河北醫(yī)科大學(xué)臨床學(xué)院《和聲與鍵盤1》2023-2024學(xué)年第一學(xué)期期末試卷
- 宣傳冊設(shè)計教學(xué)課件
- 授權(quán)查檔的授權(quán)委托書
- 【基于Java的水果商城購物系統(tǒng)設(shè)計與實現(xiàn)10000字(論文)】
- 置業(yè)顧問銷售逼單技巧培訓(xùn)
- 醫(yī)院處方箋模板
- 【工程項目施工階段造價的控制與管理8100字(論文)】
- XX學(xué)校推廣應(yīng)用“國家中小學(xué)智慧教育平臺”工作實施方案
- 非遺文化創(chuàng)意產(chǎn)品設(shè)計 課件全套 第1-5章 概述- 非遺文創(chuàng)產(chǎn)品設(shè)計案例解析
- 法律盡職調(diào)查所需資料清單
- 幼兒園中班安全教育活動《緊急電話的用途》
- 118種元素原子結(jié)構(gòu)示意圖
評論
0/150
提交評論