![關(guān)于成本管理在項(xiàng)目管理中的地位和作用中英文對(duì)照_第1頁](http://file2.renrendoc.com/fileroot_temp3/2021-4/15/66090851-420b-4614-b68d-cc9afbef420e/66090851-420b-4614-b68d-cc9afbef420e1.gif)
![關(guān)于成本管理在項(xiàng)目管理中的地位和作用中英文對(duì)照_第2頁](http://file2.renrendoc.com/fileroot_temp3/2021-4/15/66090851-420b-4614-b68d-cc9afbef420e/66090851-420b-4614-b68d-cc9afbef420e2.gif)
![關(guān)于成本管理在項(xiàng)目管理中的地位和作用中英文對(duì)照_第3頁](http://file2.renrendoc.com/fileroot_temp3/2021-4/15/66090851-420b-4614-b68d-cc9afbef420e/66090851-420b-4614-b68d-cc9afbef420e3.gif)
![關(guān)于成本管理在項(xiàng)目管理中的地位和作用中英文對(duì)照_第4頁](http://file2.renrendoc.com/fileroot_temp3/2021-4/15/66090851-420b-4614-b68d-cc9afbef420e/66090851-420b-4614-b68d-cc9afbef420e4.gif)
下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、關(guān)于成本管理在項(xiàng)目管理中的地位和作用中英文對(duì)照and the effect on cost management in the project management status in chinese and english.論文關(guān)鍵詞:施工企業(yè) 項(xiàng)目管理 成本管理keywords: project management for construction enterprise cost management論文摘要:本文主要是作者結(jié)合自己做的工作,對(duì)工程項(xiàng)目管理中成本管理的具體論述,成本管理對(duì)于降低工程項(xiàng)目成本支出,提高施工企業(yè)的競(jìng)爭(zhēng)力,提高項(xiàng)目整體管理水平和經(jīng)濟(jì)效益都起到一定的作用。abst
2、ract: this paper is based on the authors own work, to discuss the cost management in construction project management, cost management to reduce project costs, improve the competitive power of construction enterprises, can play a certain role in improving the overall project management level and econ
3、omic benefits.并從幾個(gè)方面講述了成本管理的重要性,并提出了降低工程成本的幾種方法。and tells the importance of cost management from several aspects, and puts forward several methods to reduce project cost.0、前言0, the 在我國的經(jīng)濟(jì)體制由計(jì)劃經(jīng)濟(jì)轉(zhuǎn)向市場(chǎng)經(jīng)濟(jì)過程中,行業(yè)競(jìng)爭(zhēng)日趨激烈,以建設(shè)工程招投標(biāo)為主要特征的建筑市場(chǎng)已經(jīng)形成, 行業(yè)市場(chǎng)的競(jìng)爭(zhēng)突出體現(xiàn)在造價(jià)競(jìng)爭(zhēng)上。施工企業(yè)要提高市場(chǎng)競(jìng)爭(zhēng)力,就必須在項(xiàng)目施工中以盡量少的物化消耗和勞動(dòng)力消耗來降低企業(yè)成本,
4、把影響企業(yè)成本的各項(xiàng)耗費(fèi)控制在計(jì)劃范圍之內(nèi)。也就是說,只有施工企業(yè)加強(qiáng)成本管理,才能增強(qiáng)市場(chǎng)適應(yīng)能力和競(jìng)爭(zhēng)能力。所以以項(xiàng)目利潤成為企業(yè)利潤主要來源的施工企業(yè),成本管理就成為施工企業(yè)管理中的重中之重。本文結(jié)合實(shí)際施工情況,就施工中成本管理存在的一些問題談些粗淺認(rèn)識(shí)。in chinas economic system from a planned economy to a market economy in the process, the increasingly fierce industry competition, the bidding for construction project
5、as the main characteristics of the construction market has been formed, the market competition is mainly reflected in the cost competition. construction enterprises to improve the market competitiveness, we must in the construction of the project to material consumption and labor consumption of less
6、 as far as possible to reduce the cost of enterprise, the influence of the enterprise cost control in the project scope. that is to say, to strengthen the cost management of construction enterprises in order to enhance market only, ability of adaptation and competition ability. so the project profit
7、 has become the main source of profits of construction enterprises, cost management becomes the priority among priorities management of construction enterprises. in this paper, combined with the actual construction situation, some problems of cost management in the construction to talk about some of
8、 shallow understanding.1、增強(qiáng)項(xiàng)目成本控制意識(shí)1, strengthen the consciousness of cost control of the project 隨著我國經(jīng)濟(jì)的不斷發(fā)展,加強(qiáng)項(xiàng)目成本管理,首先要樹立強(qiáng)烈的成本控制意識(shí),使降低成本成為每個(gè)員工的自覺行為。做到這一點(diǎn),靠教育和灌輸是一個(gè)方面,更重要的是從項(xiàng)目運(yùn)作體制和機(jī)制上加以保證。目前,國有企業(yè)的項(xiàng)目經(jīng)營模式一般都是由項(xiàng)目經(jīng)理承包或?qū)嵭薪?jīng)濟(jì)責(zé)任考核,但不論哪種形式,一個(gè)普遍存在的問題都是利益與風(fēng)險(xiǎn)不對(duì)等,權(quán)利與義務(wù)不相稱。有的項(xiàng)目經(jīng)理權(quán)力很大,風(fēng)險(xiǎn)卻很小。企業(yè)的盈虧很大程度依賴于項(xiàng)目經(jīng)理的個(gè)人素質(zhì)
9、,而最終的結(jié)果往往是包盈不包虧。正是由于這種弊端的存在,可能導(dǎo)致項(xiàng)目的經(jīng)營者對(duì)各項(xiàng)成本不重視,管理不精細(xì),甚至有可能出現(xiàn)“黑洞”。而項(xiàng)目的職工由于成本與自己的切身利益并無太大關(guān)系,也會(huì)表現(xiàn)出對(duì)成本漠不關(guān)心,于是成本控制就成為一句空話,項(xiàng)目的利潤目標(biāo)會(huì)大打折扣,有的甚至出現(xiàn)嚴(yán)重虧損。with the continuous development of china economy, to strengthen the project cost management, to establish the first strong cost control consciousness, to reduc
10、e costs become the conscious action of each employee. to do this, by education and indoctrination is one aspect, more important is to ensure that the project operation system and mechanism. at present, management mode of the state-owned enterprise projects are generally by the project manager contra
11、ct or the implementation of the assessment of economic responsibility, but no matter what kind of form, a common problem is the benefits and risks are not equal, not commensurate with the rights and obligations. the project manager has a lot of power, the risk is very small. the profit and loss of e
12、nterprise depends largely on the project manager s personal qualities, but the end result is often bao ying no packet loss. because of the defects, may lead to project managers do not attach importance to the costs, management is not fine, there could even be a black hole . and the project staff due
13、 to cost and their own interests is not too big relations, will show to be indifferent to the cost, and the cost control has become an empty talk, project profit target will be greatly reduced, and some even serious losses.2、利用項(xiàng)目成本全面管理原則控制和降低成本2, the project cost control and reduce the cost of compr
14、ehensive management principles 2.1 建立和完善成本管理控制體系2.1, establish and improve the cost management control system 成本管理控制體系是指以項(xiàng)目經(jīng)理為第一責(zé)任人,各個(gè)管理層面和施工班組人人參與其中的成本管理網(wǎng)絡(luò)系統(tǒng),系統(tǒng)中的每一個(gè)環(huán)節(jié)都擔(dān)負(fù)著一定的成本管理內(nèi)容。從項(xiàng)目經(jīng)理、技術(shù)負(fù)責(zé)人到現(xiàn)場(chǎng)管理員都必須落實(shí)成本管理責(zé)任,知道自己管理的內(nèi)容是什么,要達(dá)到怎么樣的控制目標(biāo)以及如何控制。成本控制體系應(yīng)根據(jù)工程的進(jìn)展和需要及時(shí)調(diào)整和完善,同時(shí)要注重對(duì)管理人員的業(yè)務(wù)培訓(xùn),以不斷提高管理人員的業(yè)務(wù)素質(zhì)和管理
15、水平。the control system of cost management refers to the project manager for the first responsibility, cost management network system each management level and the construction team everyone involved, each link in the system bears a certain contents of cost management. from the project manager, techni
16、cal director to the site administrator must implement the cost management responsibility, know what is management content, to achieve control objectives how and how to control. cost control system should be adjusted and perfected in time according to the progress and the needs of the project, at the
17、 same time, should pay attention to the management of staff training, to improve the management of the service quality and management level.2.2 制訂行之有效的規(guī)章制度以規(guī)范操作行為2.2 making the effective rules and regulations to standardize the operation behavior 項(xiàng)目成本管理是否控制有效,很大程度上依賴于各項(xiàng)管理制度是否健全,要靠制度來規(guī)范操作行為, 特別是材料、設(shè)備
18、和管理費(fèi)用的開支等更是管理的重點(diǎn)。whether the project cost management and control effectively, depends largely on the soundness of the management system, rely on the system to standardize the operation behavior, especially materials, equipment and management costs and other expenses is the key management. 材料成本在整個(gè)項(xiàng)目成
19、本中的比重最大,一般可達(dá)70%左右,而且有較大的節(jié)約潛力,往往在其他成本項(xiàng)目(如人工費(fèi)、機(jī)械費(fèi)等)出現(xiàn)虧損時(shí),要靠材料成本的節(jié)約來彌補(bǔ)。因此,必須要有嚴(yán)密的材料管理制度, 在做好材料采購計(jì)劃,采取招標(biāo)采購的形式,降低材料采購單價(jià)的基礎(chǔ)上;做好混合料配合比的優(yōu)化設(shè)計(jì), 加強(qiáng)施工過程控制,降低各類材料的生產(chǎn)消耗量和不必要的損耗。項(xiàng)目部自行采購的材料時(shí),也要做到貨比三家(比質(zhì)量、比價(jià)格、比服務(wù)),選定合格材料的供方后以會(huì)議和會(huì)簽的形式組織有關(guān)人員對(duì)材料供貨商進(jìn)行集體評(píng)價(jià),并在評(píng)價(jià)的基礎(chǔ)上選定合格的材料供應(yīng)商,經(jīng)主管領(lǐng)導(dǎo)批準(zhǔn)后,方可確定為材料供應(yīng)商。而其他保管、發(fā)料等環(huán)節(jié)必須責(zé)任到人,做到賬物相符,臺(tái)
20、賬清楚,特別要注意各個(gè)環(huán)節(jié)之間的相互監(jiān)督,相互制約。the proportion of the material cost of the entire project cost maximum, usually up to 70%, and has large potential savings, often in other cost items ( such as labor costs, machinery costs ) losses, rely on material cost savings to make up for. therefore, the material must
21、be strict management system, do a good job in the material purchasing plan, take public bidding forms, reduce material procurement price; do the optimization of the mixture ratio of mixture, the strengthening of the construction process control, reduce production consumption of all kinds of material
22、s and unnecessary loss. project material procurement to the department, also want to do better than three ( than quality, than the price, than the service ), selected the qualified material suppliers to the meeting and sign form to organize relevant personnel to material suppliers collective evaluat
23、ion, and select qualified supplier on the basis of evaluation, the approval of the competent leadership later, can be identified as material suppliers. while the other storage, shipment etc. have the responsibility to the people, be consistent with accounts, accounts clear, special attention should
24、be paid to the mutual supervision between various links, mutual restriction. 設(shè)備管理部門要根據(jù)工程質(zhì)量、進(jìn)度和設(shè)備能力的要求,合理地配備機(jī)械。外租設(shè)備要從降低成本的角度考慮,分別采取按臺(tái)班、按工作量或包月等不同的租賃形式進(jìn)行租用;要制訂設(shè)備維修和油料消耗定額,并按月進(jìn)行考核;建立各項(xiàng)保養(yǎng)制度,認(rèn)真組織實(shí)施,確保機(jī)械設(shè)備的完好,杜絕機(jī)械事故的發(fā)生,努力降低機(jī)械使用成本。the equipment management department according to the project quality, progre
25、ss and equipment capacity requirements, reasonably equipped with machinery. rent equipment to reduce costs from the point of view, respectively, according to taiwan to take classes, according to the workload or the monthly rental and other lease forms; to formulate equipment repair and fuel consumpt
26、ion, and the monthly assessment; the establishment of the maintenance system, and seriously organize the implementation, to ensure that the machinery and equipment in good condition, to prevent mechanical accident, efforts reduce the cost of machinery. 非生產(chǎn)性費(fèi)用的開支可縮性很大,必須從嚴(yán)從緊控制,根據(jù)工程量的大小,確定合理比例,總量控制, 分項(xiàng)考核。項(xiàng)目管理班子的搭建應(yīng)精干高效,避免人浮于事,以減少工資總額的開支;辦公費(fèi)用、交通工具、差旅費(fèi)等開支,必須厲行節(jié)約,采取部門包干、節(jié)約獎(jiǎng)勵(lì)的辦法;業(yè)務(wù)費(fèi)用開支遵循必要和從嚴(yán)原則,建立嚴(yán)格的審批、報(bào)銷制度,規(guī)定權(quán)限不得突破;財(cái)務(wù)要認(rèn)真執(zhí)行有關(guān)制度并實(shí)施監(jiān)督,定期開展“三同步”檢查 (即統(tǒng)計(jì)核算、業(yè)務(wù)核算、會(huì)計(jì)核算的三同步),防止項(xiàng)目成本盈虧異常。non-
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年食品蒸發(fā)濃縮機(jī)械合作協(xié)議書
- 2025年塑料助劑:潤滑劑合作協(xié)議書
- 2025年呼吸制氧合作協(xié)議書
- 2025年年4K超高清合作協(xié)議書
- 2025年脂環(huán)烴合作協(xié)議書
- 八年級(jí)英語下冊(cè) Unit 10 單元綜合測(cè)試卷(人教版 2025年春)
- 2024-2025學(xué)年黑龍江省佳木斯市富錦市第十小學(xué)四年級(jí)(上)期末數(shù)學(xué)試卷
- 2025道德與法治九年級(jí)第二學(xué)期中考教學(xué)工作計(jì)劃
- 鄂州市梁子湖區(qū)八年級(jí)上冊(cè)語文名著導(dǎo)讀《紅星照耀中國》
- 七年級(jí)上學(xué)期歷史試卷
- 江蘇省蘇州市2024-2025學(xué)年高三上學(xué)期1月期末生物試題(有答案)
- 銷售與銷售目標(biāo)管理制度
- 特殊教育學(xué)校2024-2025學(xué)年度第二學(xué)期教學(xué)工作計(jì)劃
- 2025年第一次工地開工會(huì)議主要議程開工大吉模板
- 第16課抗日戰(zhàn)爭(zhēng)課件-人教版高中歷史必修一
- 對(duì)口升學(xué)語文模擬試卷(9)-江西省(解析版)
- 無人機(jī)運(yùn)營方案
- (正式版)HGT 22820-2024 化工安全儀表系統(tǒng)工程設(shè)計(jì)規(guī)范
- NB-T 47013.15-2021 承壓設(shè)備無損檢測(cè) 第15部分:相控陣超聲檢測(cè)
- 隧道二襯承包合同參考
- 物理專業(yè)常用英語詞匯
評(píng)論
0/150
提交評(píng)論