1、take corrective and preventive action. 3.11 quality rewards companies for projects, construction crews and other layers of quality responsibility documents signed, linked with the economy. clear rewards and punishments, strictly cash. 3.12 quality return system to track the quality of completed oper
2、ations, monitoring, and problems with corrective action in a timely manner, and recorded for analysis in order to improve the experience for the future construction level. 4, quality control system: establishment of perfect quality control system. comprehensive understanding of engineering quality c
3、ontrol points, develop specific comprehensive quality control measures, clear quality control responsibilities, company, department, three-level quality control system in the construction area of the project. concrete quality control system block diagram. 4.1 quality control principles: (1) quality
4、control follow the "prevention first" principle, insisting on quality in advance control, eliminate hidden quality in spurts stage. (2) adhere to the high standards of quality assessment, and all data is strictly prohibited on imagination-do. 4.2 quality control: quality control procedures
5、, see next page. quality control elements list construction prepared process a design low-down 1 drawings since trial project technicians drawings information whether complete, whether meet construction need drawings technology file since trial records 2 design low-down project technology head under
6、stand design intent proposed problem drawings technology file design low-down records 3 drawings triage project technology head on drawings of integrity, and accuracy, and feasibility for triage drawings technology file drawings triage records ii developed construction process file 4 construction or
7、ganization design project technology head by related file requirements series construction organization and standard approval drawings for approval of construction organization design 5 construction plan project technicians above standard construction drawings . officer for check acceptance, through
8、 the layers of quality control to ensure that the project meets quality standards. 3.9 breach of construction regulations, construction techniques according to the person in charge of construction quality accident reporting system specifications, design and construction process guide the constructio
9、n personnel, shall not be an illegal command. the operator must operate in accordance with the relevant norms and regulations is, not brutal construction. construction managers found that the operators violated the construction specifications, be stopped immediately, and report technical leader, urg
10、ed the operator immediately corrected. quality accident on violations of construction rules, and size, as appropriate, timely escalation the company, management and owners and record in writing reports. quality the right to stop any violations of constructionuna certa força, triar la ubicaci
11、43; correcta de l'aigua descarregada. mètodes experimentals són les següents: una. secció de prova també, per separat amb prova bé. reg lentament omplert de la canonada d'aigües avall. quan alts en la secció la proveta i canonada que sobresurt de un co
12、njunt de vàlvula d'escapament, l'exclusió de gas a la canonada de reg. desguàs b. principis en el tub d'assaig ple d'aigua per a 1 nit, començava a provar nivell d'aigua ben marcat i gravada i continua a prova dins de l'observació període de temp
13、s durant el qual l'aigua i el registre el componen l'aigua, llavors d'acord amb la fórmula per calcular el volum real de l'aigua. fórmula: q=w/(t*l) w-complementàries aigua capacitat l-canonada longitud experimental t-temps, no menys de 30min quan q permet passar c. de
14、sprés de completar la prova, l'aigua immediatament posar aigua a la xarxa. (6) conductes omplint: canonades abans backfill ha netejar les escombraries a la canonada i fent manteniment treballa quan la inspecció clavegueram sense problemes. i netejar la runa de tanc, ranura expulsor des
15、prés de l'aigua en la backfill. backfill simetria bilateral rasa backfill a canonada, segons els requeriments de disseny, backfill amb sorra graduada, classificava grava aigua i vibració de dinàmic compactació-compactar, estàndard és ja no enfonsant, fins bombolles,
16、 per conèixer el disseny i especificacions. en prova d'aigua tancats qualificat només després d'omplir la construcció. quan l'eix en els dos costats al mateix temps, backfill simetria horitzontal; el gruix de max de paviment i compactació de cada capa és de
17、30cm i per evitar l'impacte violent. quan el backfill sobre els 50cm de la part superior de la canonada pot ser mecànicament el farciment. backfill sòl backfill per capes, capa compactació mètode. compactació està permès fer malbé la canonada, compactat la
18、 canonada per ambdós costats i 50cm dins de la canonada per sobre les manipulacions elèctric a causa de la durada del projecte i sense interrompre els casos de tràfic, construcció de canalització hauria de teixit segmentat, en un període relativament curt de temps per s
19、atisfer la demanda de trànsit, l'altre costat de la construcció de caixa de la carretera tan aviat com sigui possible, per afrontar la següent secció de construcció. amb aquesta finalitat, es recomana la canonada rasa classificava grava backfill l'elevació de ll
20、it de carretera. distribució de mida de partícula de sorra backfill de rasa ha de ser utilitzat en bon gruixut sorra, relativa densitat no menys de 0,70, bona 2-4cm grava gradació grava backfill grava backfill i compactació per capes de manera, cada solquen 30-50cm, piconat en m&
21、#232;tode constructiu de consolidació o aigua. qualificar grava compactant de compactació dinàmica vibració grava amb brollen ja no, no que s'enfonsa com l'estàndard. procés de desguàs de paret d'estructura de polietilè 9.3.4hdpe: solc excavaci
22、3; amaniment artificial canonada basat hdpe canonadain order to ensure normal teaching order, protecting students ' healthy growth, ensuring that national (property) is not lost, to prevent or minimize the occurrence of safety accidents, follow the "prevent, rescue each other, ensure safety
23、 and reduce losses" principle, according to the local conditions, make the management system. 1, the principal is the responsibility of school safety, school security under the leadership of president security work leading group. the head teacher to the leadership team is responsible for, imple
24、mentation of the accountability system. 2, school monthly student knowledge about safety education, education should be diversified in the form every safety education for students of classes per week should be targeted. to carry on emergency issues dealing with education in general, self-help and mu
25、tual rescue knowledge. emergency calls (such as 110, 119, 122, 120, and so on) use common sense in education. 3, the establishment of major accident reporting system. school students report major accident within an hour of education; student run and disappearances to report; report of the accident t
26、o a written report in triplicate, a correctional centre, a police station, a township people's government shall not conceal the accident. 4 week, teachers are on duty system, establish and improve the leadership values; strengthen the education, management of teaching activities in schools to en
27、sure normal teaching order; responsible for school safety leadership always maintained close contact and district police stations, canvassing support from the police station on school safety and help. 5, strengthening teachers ' moral education, establish a dedicated love, improving education qu
28、ality, observe the students ' psychological changes at any time and take preventive measures, no corporal punishment and covert corporal punishment on students, student out of the classroom, schools may not be. 6, units or departments use student street propaganda or participate in the celebrati
29、ons, as well as participating in other social work, without approval of the correctional centre, school principals consent, without organization. without the approval of relevant departments, may organize students to participate in fire fighting, disaster relief and so on. 7, schools should educate
30、students to obey the school rules and regulations, on time, on time home to prevent accidents. 8, school to school inspections on a regular basis, found hidden in time, and in severe cases, it is hard to eliminate immediately closed, and reported to the local people's government, education, and
31、rule of law section. 9, the school should always check the internal walls, retaining walls, ponds, railings, handrails, doors, windows, staircases and a variety of sports, extracurricular activities, facilities such as fire safety, infrastructure security, unsafe facility to immediately repair and d
32、emolition to ensure that teachers and students work, learn, live venues and facilities are safe and reliable. song lin xiang liu jia ping elementary school march 2016 song lin xiang liu jia ping primary school fire safety systems to enhance fire safety, protection of public property and the life and
33、 property safety of teachers and students, school fire safety into day-to-day management, is developing the following fire safety system. 1, strengthen fire safety education of the whole school. according to the requirements of the fire services act, so that everyone has of keeping fire control safe
34、ty, protecting fire control facilities, fire prevention, reports of fire安徽醫(yī)科大學圖書館消防系統(tǒng)設備采購及安裝工程目 錄第一章 工程概況2第二章 編制依據(jù)2第三章 我公司的優(yōu)勢4第四章 項目管理班子配備6第五章 分部分項工程的施工技術方案9第六章 技術措施20第七章 主要施工機具21第八章 勞動力投入計劃22第九章 質量保證體系及措施23第十章 工期進度安排及保證措施30第十一章 安全生產(chǎn)及文明施工保證措施33第十一章 用戶操作人員培訓計劃35第十二章 質量保證、維護保養(yǎng)、保修等有關承諾36(附:現(xiàn)場施工總平面布置圖)第
35、一章 工程概況安徽醫(yī)科大學圖書館位于安徽醫(yī)科大學校園內(nèi),總建筑面積約為23563.84平方米,地上六層,建筑高度26.90m,采用框架結構,本建筑為二類,結構抗震設防為七級,耐火等級為壹級。消防工程由深圳市建筑設計研究總院設計。消防工程包括火災自動報警系統(tǒng)、消火栓系統(tǒng)、自動噴淋滅火系統(tǒng)、防火卷簾系統(tǒng)、通風防排煙系統(tǒng),本次招標火災自動報警系統(tǒng)、自動噴淋滅火系統(tǒng)。本工程除保證安裝工程按期完成外,還要做好系統(tǒng)調試,確保各項功能正常。我公司是專業(yè)從事消防工程施工的壹級企業(yè),有一支優(yōu)秀的施工及管理隊伍,始終堅持“質量第一、用戶至上”的方針,在許多大中型消防工程施工中得到用戶的良好信譽。為保證工程圓滿竣工
36、,我公司成立該工程項目部,抽調國家壹級項目經(jīng)理任該工程的項目經(jīng)理,并集中責任心強、經(jīng)驗豐富、技術精湛的管理人員及施工隊伍,精心組織,服從業(yè)主、總包及監(jiān)理的安排,按照優(yōu)良工程標準進行施工,做到安全文明、按期完成施工任務,保證一次性通過消防專業(yè)部門的驗收,并做好維保服務,充分發(fā)揮消防工程的安全保障作用。第二章、編制依據(jù)1、設計院提供的施工圖,招標文件及澄清說明。2、國家及地方相關設計標準及規(guī)范 火災自動報警系統(tǒng)設計規(guī)范 gb50116-98高層民用建筑設計防火規(guī)范 gb50045-95(2005版)汽車庫、停車庫、停車場設計防火規(guī)范 gb50067自動噴水滅火系統(tǒng)設計規(guī)范 gb50084-2001
37、 自動噴水滅火系統(tǒng)施工及驗收規(guī)范 gb50621-2005 火災自動報警系統(tǒng)施工及驗收規(guī)范 gb50116-98 通風與空調工程施工質量驗收規(guī)范 gb50243-2002建筑設計防火規(guī)范 gb50013-2006消防工程安裝的通用要求 601-1998 建筑消防設施檢測技術規(guī)程 ga503-2004 鋼制防火門通用技術條件 gb12955-91第三章 我公司的優(yōu)勢一、綜合實力強1、我公司獲得國家建設部頒發(fā)的壹級消防工程施工資質證書,國家建設部頒發(fā)的甲級消防系統(tǒng)專項工程設計資質證書,安徽省安全技術防范實施設計、安裝、維修壹級資格證書,鐵路消防工程施工安裝資質許可證,獲得了質量管理體系認證證書。2
38、、具有完善的質量管理保證體系,取得了iso9001:2000質量體系認證,獲得省級“優(yōu)秀質量管理小組”稱號。3、技術及綜合管理能力強,公司高層管理人員是消防界知名人士,既有實踐管理經(jīng)驗,又有現(xiàn)代企業(yè)管理水平。公司現(xiàn)有員工97人,有職稱的工程技術和經(jīng)濟管理人員59人,其中中級以上職稱的有40人,國家壹級項目經(jīng)理9人,二級項目經(jīng)理12人,他們業(yè)務精通,工作認真,參加過多項大、中型項目的消防工程設計和施工管理,公司現(xiàn)有施工人員166人,具有多年的施工經(jīng)驗和操作技能,有良好的職業(yè)道德和主人翁精神。110指揮中心、金環(huán)大廈我公司參與消防工程施工,該工程獲得“黃山杯”稱號。我公司多年施工未發(fā)生重大人身傷亡
39、和重大設備事故,2004年獲得“優(yōu)秀建筑企業(yè)”的稱號。4、講誠信,守信用,我公司連續(xù)六年獲得“重合同、守信用”企業(yè)稱號,連續(xù)三年獲得aaa級信用企業(yè)證書稱號,合同履約情況良好,無不良訴訟情況。5、作風過硬,技術力量精良,參加過多項大中型工程項目的設計和施工,能在關鍵時刻發(fā)揮我公司能打硬仗的精神,古井假日酒店開業(yè)前的關鍵是取得消防驗收合格證,由于該酒店消防體量大,裝飾工期影響到消防設備的安裝和調試,我公司組織了精兵強將,采取交叉作業(yè),大戰(zhàn)四十天,保證了消防驗收合格,為此古井假日酒店給我公司寫了感謝信。合肥新客站建筑面積21800平方米,消防完善工程是蚌埠鐵路分局安排的重點安全工程,2001年底,
40、離春運只有35天,分局要求我公司在春運前完成施工及驗收,我公司經(jīng)過精心組織,只用了31天就完成了施工及驗收,保證了春運安全,蚌埠鐵路分局也寫了感謝信。 二、 材料供應和調配能力強 我公司從事消防工程安裝十余年,在國內(nèi)外已建立起長期物資供應的信息網(wǎng)絡和品牌產(chǎn)品供貨商,公司的物資部門配備專用車輛,以滿足物資調度的需要。 三、系統(tǒng)投入運行后,能提供周到的服務為了保證竣工工程運行正常,公司重視維修服務,設立了維修機構,制定了維修辦法和管理制度,編制系統(tǒng)使用和維修指南,除在保修期內(nèi)免費檢修外,公司還實行終身跟蹤服務,建立常規(guī)、應急、檢查考核三個網(wǎng)絡服務體系,每年重大節(jié)日對用戶進行回訪,幫助用戶解決問題。
41、古井假日酒店火災自動報警系統(tǒng)我公司施工,并于1999年1月通過消防驗收合格,現(xiàn)該系統(tǒng)由我公司進行維保,系統(tǒng)運行正常,安徽省國稅局辦公樓、110指揮中心、合肥市新圖書館等工程也同樣由我公司施工,質保期過后繼續(xù)維保,深得用戶的好評。第四章 項目管理班子配備一、項目管理班子配備網(wǎng)絡圖二、主要施工人員表 機構擬任職務姓名現(xiàn)任職務職稱主要資歷、經(jīng)驗及承擔過的項目總部項目主管胡照安總經(jīng)理工程師具有25年的工程管理資歷及經(jīng)驗,承擔過的項目主要有:合肥公安局110指揮中心、安醫(yī)門診部、安徽省工行營業(yè)樓、阜陽商廈等。技術負責人謝家生副總工程師高級工程師具有28年的技術負責資歷及經(jīng)驗,承擔過的項目主要有:合肥公安
42、局110指揮中心、金環(huán)大廈、宿州賓館、廬陽飯店等。質量負責人陳其林副總工程師高級工程師從事項目質量工作15年,承擔的主要項目有:安徽省工行營業(yè)樓、合肥移動通信樞紐、市第一人民醫(yī)院、安慶大酒店。安全管理負責人張國政副總經(jīng)理從事工程管理25年,承擔過的項目主要有:合肥公安局110指揮中心、安徽省電網(wǎng)調度大樓、安徽省工行營業(yè)樓、合肥市綠都商城改造等。現(xiàn)場項目經(jīng)理陳其林副總工程師高級工程師從事工程管理17年,承擔過的項目主要有:合肥公安局110指揮中心、安徽省電網(wǎng)調度大樓、安徽省工行營業(yè)樓、合肥市綠都商城改造等。項目技術負責人曹艷正總工程師高級工程師從事項目設計工作10年,承擔的主要項目有:合肥移動通
43、信樞紐樓、合肥市國稅局、建行銅陵分行、安醫(yī)大第一附屬醫(yī)院醫(yī)技綜合樓、合肥華聯(lián)超市等。機械設備管理李名武工程師從事項目機械設備工程工作8年,承擔的主要項目有:合肥第一人民醫(yī)院病房大樓,合肥移動通信樞紐樓、合肥市國稅局等。質量管理王奇峰工程師從事質量工作10年,承擔的主要工程有:省人大會議中心、蕪湖人防、安徽省工行營業(yè)樓等。材料管理陳功仁助理工程師從事材料工作9年,承擔的主要項目有:安徽省電網(wǎng)調度大樓、合肥市廬陽區(qū)社區(qū)服務中心、合肥移動通信樞紐樓、合肥市綠都商城等安全管理王樹森助理工程師從事安全管理工作8年,承擔的主要項目有:合肥市國家稅務局辦公樓、合肥市蜀山區(qū)辦公樓、銀成大廈、合肥市第一人民醫(yī)院
44、等。計劃管理張玲助理經(jīng)濟師從事計劃管理工作6年,承擔的主要項目有:安徽省工行營業(yè)樓、銅陵銅商品市場、安慶大酒店。成本核算孫云工程師從事核算工作10年,承擔的主要項目有:安徽省電網(wǎng)調度大樓、合肥市廬陽區(qū)社區(qū)服務中心、合肥移動通信樞紐樓、合肥市綠都商城等財務管理牛洪珍財務經(jīng)理經(jīng)濟師從事財務管理工作20年,承擔的主要項目有:合肥盛安大廈、合肥古井假日酒店、合肥公安局110指揮中心、宿州賓館等。施工員吳乾東施工班長助理工程師從事項目施工管理工作10年,承擔的主要項目有:合肥移動通信樞紐樓、合肥市綠都商城改造、聯(lián)合倉庫改造(中央花園)、合肥高新區(qū)移動通信樓、晨風苑小區(qū)等。質檢員劉平助理工程師從事成本質檢
45、工作4年,承擔的主要項目有:安徽省電網(wǎng)調度大樓、晨風苑小區(qū)等。安全員劉澤元助理工程師從事安全員工作4年,承擔的主要項目有:合肥新聞中心、廬陽飯店、蕪湖金水灣大酒店、合肥第一人民醫(yī)院病房大樓等。第五章、分部分項工程的施工技術方案一、自動報警及聯(lián)動控制系統(tǒng)(一)、設備、材料的選用1、自動報警設備:本工程自動報警設備選用公認名牌產(chǎn)品的“松江”牌設備。該公司是我公司長期合作廠家,產(chǎn)品性能穩(wěn)定,在全國范圍內(nèi)有很大的市場占有率;該公司有全面服務系統(tǒng)的售后服務體系,深受消防界人士及廣大用戶的一致好評。2、kbg穿線管選用河北成龍管業(yè)有限公司生產(chǎn)的“成龍管業(yè)”國標合格產(chǎn)品。 3、所有的電線電纜選用安徽合肥生產(chǎn)
46、的“綠寶”國標合格產(chǎn)品。(二)、施工注意事項1、按照施工圖進行清管,對存在的問題提出補救措施。2、按照設備功能及極性對導線顏色進行規(guī)定,以便查線及今后維修。3、為防止吊頂上安裝的設備傳輸線裸露,在設備上方吊頂上加裝接線盒。4、在有吊頂?shù)牟课?,為了不影響裝飾效果,對吊頂上設備的連線預留適當長度,避讓噴頭、燈具及風口。并使所安裝設備橫豎成線。5、為防止潮濕及灰塵,探測器底座及管盒連接處孔洞用密封膠密封。6、點型探測器底座安裝后用塑料袋包裹以防污染,待具備條件時安裝探測器。7、聯(lián)動系統(tǒng)調試按照聯(lián)動對象逐點調試,首先控制模塊不帶負荷通電檢查,檢查模塊動作是否正常,模塊動作正常后再與被控對象接線調試。8
47、、接線端子箱,控制器及設備連線畫接線端子圖,按接線端子圖接線,接線時加套機械打印的號碼管。(三)、施工方法1、管線敷設和工藝要求(1)消防報警系統(tǒng)導線敷設完畢后,應用500v的兆歐表測量絕緣電阻,每回路對地絕緣電阻值應大于20m。(2)強電和弱電線路分開敷設;額定工作電壓不超過50v時導線的電壓等級不應低于交流250v,額定電壓超過50v時,導線的電壓等級不應低于交流500v,穿入導線或槽內(nèi)不得有接頭和扭結,起接頭在接線盒內(nèi)用端子連接;(3)消防控制中心內(nèi)走線設電纜槽保護,進線孔做安全防護;(4)走線無扭曲脫落現(xiàn)象,管線經(jīng)過建筑物的變形縫(包括沉降縫、伸縮縫、抗震縫等)處,應采用補償措施;(5
48、)管槽內(nèi)的線纜無接頭,敷設在或潮濕場所管路的管口、管子連接處均作密封處理,在用鋼管敷設時,鋼管不應有折扁和裂縫,聯(lián)動管路外刷防火涂料,切斷口應挫平。2、消防控制室內(nèi)控制器安裝(1)消防報警控制屏底邊距地面高度為0.2m,其靠近門軸的側面距墻為0.5m;正面的操作距離為1.2m;(2)消防報警聯(lián)動控制臺前操作距離為2m;控制臺操作員工作的一面至墻的距離為3m;控制臺后便于維護距離為1m;(3)消防報警控制屏應安裝牢固,不得傾斜。安裝在輕質墻上時,應采取加固措施;(4)消防報警控制屏的主電源引入線,應直接與消防電源連接,嚴禁使用電源插頭,主電源應有明顯標志;(5)消防報警控制屏的接地,應牢固,并有
49、明顯標志;(6)引入消防報警控制屏的電纜或導線,應符合下列要求;1)配線應整齊,避免交叉,并應固定牢固;2)電纜芯線和所配導線的端部,均應標明編號,并與圖紙一致,字跡清晰不易褪色;3)端子板的每個接線端,接線不得超過2根;4)電纜芯和導線,應留有不小于20cm的余量;5)導線應綁扎成束;6)導線引入線穿線后。在進線管處應封堵。3、 煙溫探測器安裝(1)探測器至相鄰墻壁或梁邊的水平距離不應小于0.5m,安裝位置的正下方及其周圍0.5m內(nèi)不應有遮擋物;(2)探測器至送風口邊的水平距離應不小于1.5m,在頂棚附近有回風口的,應安裝在回風口的附近;(3)探測器在即將調試時方可安裝,在安裝前應妥善保管,
50、并應采取防塵、防潮、防腐蝕措施;(4)探測器的確認燈,應面向便于人員觀察的主要入口方向;(5)探測器底座的穿線孔宜封堵,安裝完畢后的探測器底座應采取保護措施;(6)探測器底座的外導線,應留有不小于15cm的余量,入端處應有明顯標志;(7)探測器的底座應固定牢靠,其導線連接必須可靠壓接或焊接;(8)探測器的“+”線應為紅色,“”線應為藍色,其余線應根據(jù)不同用途采用其他顏色區(qū)分。但同一工程中相同用途的導線顏色應一致。4、 手動報警按鈕安裝(1)手動報警按鈕的中心距地(樓)面高度為1.31.5m處;(2)手動報警按鈕應安裝牢固,不得傾斜;(3)手動報警按鈕的外接導線應有緩沖余量(不應小于10cm)。
51、在其端部應有明顯標志;(4)手動報警按鈕的安裝位置,從一個防火區(qū)內(nèi)的任何位置到鄰近的一個手報按鈕的距離不應大于30m;(5)手動報警按鈕應設置在明顯和便于操作的部位,并應有明顯標志。5、 模塊安裝(1)模塊采用明裝,進線明裝時,采用后備盒安裝方式,安裝高度1.5m;(2)安裝時根據(jù)不同模塊使用符合標準的線纜和截面積及耐壓等級;(3)控制強電設備,應加繼電器隔離,以免強電串人損害模塊;(4)消防控制設備的外接導線,當采用金屬軟管作套管時,其長度不宜大于2m。6、 緊急啟動、停止開關應安裝在墻上距地(樓)面高度1.5米處,應安裝牢固并不得傾斜。7、聲光報警器、警鈴蜂鳴器及閃燈安裝在門的外側,警鈴安
52、裝在門的內(nèi)側,安裝高度為距地(樓)面2.5米左右。8、系統(tǒng)接地裝置的安裝(1)工作接地線應采用銅芯絕緣導線或電纜,不得利用鍍鋅扁鐵或金屬軟管;(2)由消防控制室引至接地體的工作接地線,在通過墻壁時,應穿人鋼管或其他堅固的保護管;(3)工作接地線與保護接地線必須分開,保護接地線不得利用金屬軟管。二、消火栓、噴淋系統(tǒng)(一)、設備、材料的選用1、消防水泵接合器、濕式報警裝置、噴淋頭等選用上?!敖鸲堋鄙a(chǎn)的國標合格產(chǎn)品。2、鍍鋅鋼管選用天津市友誠鍍鋅鋼管有限公司生產(chǎn)的“天津友發(fā)”國標合格產(chǎn)品。3、溝槽配件選用蚌埠“禹王”國標合格產(chǎn)品;鍍鋅配件選用“瑪鋼”國標合格產(chǎn)品。4、所有閥門選用“上海滬航”國標合
53、格產(chǎn)品。(二)施工注意事項1、施工前對管材外觀進行檢查,清除管子內(nèi)外的臟物,對管子進行校直。2、管道支吊架制作前,對現(xiàn)場的風管、裝飾吊頂、梁、柱等的標高進行調查確定,然后確定支吊架的長度。3、每天用螺紋規(guī)對管道的套絲進行測量,保證螺紋的的尺寸偏差符合標準。4、管件安裝前進行檢查以保證管件的質量和管件對管道安裝彎曲影響。5、為保證溝槽式卡箍接頭安裝平直,鍍鋅鋼管進行滾槽前用水平儀測量鋼管保證放置平直。6、為保證管道安裝坡度、縱、橫方向平直度符合優(yōu)良工程要求。拉線定位支架,管道安裝時在支架上微調。7、埋地管道按照設計要求進行防腐處理。8、為保證工期和質量,部分絲接采用高性能密封材料。9、為保證噴頭
54、安裝橫、豎向在一條直線,采用拉線方法,以確定每根配水支管的下料尺寸。10、為保證消火栓栓口安裝高度,每處消火栓都進行測量下料。11、噴頭短管安裝逐點定位,以保證噴頭的垂直和與吊頂?shù)慕雍?,裝飾盤安裝牢固、美觀。(三)、施工方法1、支架制安(1)支架的結構形式和用材規(guī)格應根據(jù)所承壓的管道根數(shù)多少、管徑大小等實際情況來確定支架。(2)支架制作時,下料、鉆孔均不得用氣割、氣燒;支架應除銹后刷紅丹漆二遍,面漆二遍防腐后才能進行支架安裝工作。管道支架焊縫寬度除設計注明外,均不得小于4mm,應全長滿焊。(3)成排支架應排列整齊,布置合理、埋設平整牢固,與管道接觸應緊密、固定應牢固。(4)支架設置除滿足施工規(guī)
55、范規(guī)定要求外,還應在穿墻、梁、板處,上翻的水平彎管下或下翻的水平彎管下加設支架。(5)管道井內(nèi)的豎管安裝,應認真做好立管下的管座(墩),如設計無要求時,應做好大于dnl50管徑以上的立管固定支架工作,可以在隔開二至三層處設置一個承重固定支架。2、管螺紋及管槽制作(1)螺紋加工時應嚴格按標準進行,要求螺紋光滑、無毛刺、不斷絲、不亂扣等。(2)管螺紋加工后,用同規(guī)格的管件進行試裝,可用手擰入2-3扣,用管子鉗繼續(xù)上緊,最后螺紋留出管配件外1-2扣。(3)根據(jù)管子大小及壓制的溝槽深淺調整限位,使壓制的溝槽深度在規(guī)定范圍之內(nèi),如果壓制的管子規(guī)格有變化時,需重新調整限位。(4)壓輪要根據(jù)管子規(guī)格選用,裝
56、上壓輪后要檢查上下壓輪是否對中,如不對中要進行適當調整。3、管道安裝(1))在管道安裝前,應仔細審查施工圖,并與相關專業(yè)共同編制交叉施工方案,用于管道的安裝位置,要周密考慮,詳細計算,認真定位。(2)管子安裝前,應認真檢查管子內(nèi)有無異物或污染,如有應清除干凈后方能拿來使用。(3)在進行管道安裝時,選用的管子鉗要合適,安裝配件時,不僅要求安裝緊密,還需考慮配件的位置和方向,不允許擰過頭而用倒擰的方法進行找正,這樣易造成滴漏水。(4)按設計和施工驗收規(guī)范規(guī)定,管道與管道,管道與建筑結構的距離都有具體尺寸要求,以便于管道使用和維修,在進行管道安裝時應嚴格遵守。(5)管道按設計的坐標或標高安裝后,必須
57、將管道用支架固定牢固,以防移位。(6)使用管子割刀斷管子時,管口產(chǎn)生縮口現(xiàn)象,一般應用管銑再擴口一下,以保證斷面不縮小。(7)管道在安裝過程中,應隨時加管堵封嚴蔽口,以防止交叉施工時異物落入。 (8)管道的坡度,是保證管道正確使用的關鍵,管道安裝時,必須預先看好施工圖規(guī)定的管線坡度,根據(jù)坡度和管線長度計算出管道起始的標高,并用直線將起始標高處綁直,再根據(jù)支架的間距需要安裝好支架,以保證坡度的正確。4、閥門安裝(1)閥門安裝前,應根據(jù)要求仔細核對型號、規(guī)格:閥內(nèi)雜物。(2)按照施工驗收規(guī)范要求,凡出廠沒有強度和嚴密性試驗單的閥門,安裝前都應補做強度和嚴密性試驗,屬于安裝在主干管上啟閥作用的閉路閥門,應逐個做強度和嚴密性實驗。(3)一般閥門的閥體上印有流向箭頭,箭頭所指即介質流動的方向,不得裝反。(4)在安裝位置上要從使用操作和維修方面著眼,盡可能將閥門安裝在便于操作維修的地方,同時還要考慮到整個管道的外形美觀。閥門手輪
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
評論
0/150
提交評論