版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、1Design of Open Channels and CulvertsCE453 Lecture 25Ref: Chapter 17 of your text and HYDRAULIC DESIGN OF HIGHWAY CULVERTS, Hydraulic Design Series Number 5, Federal Highway Administration, Publication No. FHWA-NHI-01-020, September 2001; available at /design/hyd/hds5_03r.pdf, acc
2、essed March 18, 20062Design of Open Channels3Longitudinal SlopesnGradient longitudinal direction of highway to facilitate movement of water along roadway4DrainsnAlong ROWnCollect surface waterA typical intercepting drain placed in the impervious zone http:/www.big- Channels (Ditches)lDesignlAdequate
3、 capacitylMinimize hazard to trafficlHydraulic efficiencylEase of maintenancelDesirable design (for safety): flat slopes, broad bottom, and liberal rounding6Ditch ShapelTrapezoidal generally preferred considering hydraulics, maintenance, and safetySource: F7Ditch ShapelV-shaped less desirable from s
4、afety point of view and maintenanceSource: F8TermsSteady Flow: rate of discharge does not vary with time (Mannings applies)Uniform: channel properties are constant along length of channelSlopeRoughnessCross-section Water surface is parallel to slope of channelNon-uniform: properties vary9TermsUnstea
5、dy flow: rate of discharge varies with time Critical deptha hydraulic control in design depth of water where flow changes from tranquil to rapid/shootingCritical velocity: velocity corresponding to critical depthCritical slope: slope corresponding to critical depth1011Flow VelocityDepends on lining
6、type Should be high enough to prevent deposit of transported material (sedimentation)For most linings, problem if S 2 fps when full)Should be low enough to prevent erosion (scour)For most types of linings, problem if S 5%12Use spillway or chute if elev is large13Rip Rap for drainage over high slope1
7、4Riprap (TN Design Manual)15Side Ditch/Open Channel Design-BasicsEstimate Q at point of interestSelect ditch cross sectionErosion control?Mannings formula used for designAssume steady flow in a uniform channel16Mannings Formula V = R2/3*S1/2 (metric) V = 1.486 R2/3*S1/2 n nwhere: V = mean velocity (
8、m/sec or ft/sec)R = hydraulic radius (m, ft) = area of the cross section of flow (m2, ft2) divided by wetted perimeter (m,ft)S = slope of channeln = Mannings roughness coefficient1718Side Ditch/Open Channel Design-BasicsQ = VAQ = discharge (ft3/sec, m3/sec)A = area of flow cross section (ft2, m2)FHW
9、A has developed chartsto solve Mannings equation for different cross sections19Open Channel ExamplenRunoff = 340 ft3/sec (Q)nSlope = 1%nMannings # = 0.015nDetermine necessary cross-section to handle estimated runoffnUse rectangular channel 6-feet wide20Open Channel ExampleQ = 1.486 R2/3*S1/2 nnHydra
10、ulic radius, R = a/Pna = area, P = wetted perimeterP21Open Channel ExamplenFlow depth = dnArea = 6 feet x dnWetted perimeter = 6 + 2d6 feetFlow depth (d)22Example (continued)Q = 1.486 a R2/3*S1/2 n340 ft3/sec = 1.486 (6d) (6d)2/3 (0.01)1/2 (6 + 2d) 0.015d 4 feetChannel area needs to be at least 4 x
11、623Example (continued)Find flow velocities.V = 1.486 R2/3*S1/2 nwith R = a/P = 6 ft x 4 ft = 1.714 2(4ft) + 6ft so, V = 1.486(1.714)2/3 (0.01)1/2 = 14.2 ft/sec 0.015If you already know Q, simpler just to do V=Q/A = 340/24 = 14.2)2425Example (continued)Find critical velocities.From chart along critic
12、al curve, vc 13 ft/secCritical slope = 0.007Find critical depth: yc = (q2/g)1/3g = 32.2 ft/sec2q = flow per foot of width = 340 ft3/sec /6 feet = 56.67ft2/secyc = (56.672/32.2)1/3 = 4.64 feet depth of 426Check lining for max depth of flow 2728Source: FHWA Hydraulic Design Charts29A cut slope with di
13、tch30A fill slope31Inlet or drain marker32Ditch treatment near a bridgeUS 30 should pier be protected?33A fill slope34Wheres the water going to end up?Hidden Drain353637Median drain38Design of CulvertsSource: Michigan Design Manual39Culvert Design - Basics lTop of culvert not used as pavement surfac
14、e (unlike bridge), usually less than 20 foot spanl 20 feet use a bridge lThree locations lBottom of Depression (no watercourse) lNatural stream intersection with roadway (Majority) lLocations where side ditch surface drainage must cross roadway 40Hydrologic and Economic ConsiderationsnAlignment and
15、grade of culvert (wrt roadway) are important nSimilar to open channelnDesign flow rate based on storm with acceptable return period (frequency)41Culvert Design Steps lObtain site data lRoadway cross section at culvert locationl(best is at existing channel)lEstablish inlet/outlet elevations, length,
16、and slope of culvert 4243Sometimes you want a dam why?44Culvert Design Steps lDetermine allowable headwater depth (and probable tailwater depth) lduring design flood lcontrol on design size f(topography and nearby land use) lSelect type and size of culvert lExamine need for energy dissipaters lEmerg
17、ency overflow?45Headwater DepthnConstriction due to culvert creates increase in depth of water just upstreamnAllowable/desirable level of headwater upstream usually controls culvert size and inlet geometrynAllowable headwater depth depends on topography and land use in immediate vicinity, as well as
18、 need to protect roadway subgrade46Inlet controlnFlow is controlled by headwater depth and inlet geometrynUsually occurs when slope of culvert is steep and outlet is not submergednSupercritical, high v, low dnMost typicalnFollowing methods ignore velocity head4748Example:Design ElevHW = 230.5 (max)S
19、tream bed at inlet = 224.0Drop = 6.5Peak Flow = 250cfs5x5 boxHW/D = 1.41HW = 1.41x5 = 7.1Need 7.1, have 6.5Drop box 0.6 below stream 223.4 - OK49Outlet controlnWhen flow is governed by combination of headwater depth, entrance geometry, tailwater elevation, and slope, roughness, and length of culvert nSubcritical flownFrequently occur on
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025至2030年中國(guó)紅外線燃燒器數(shù)據(jù)監(jiān)測(cè)研究報(bào)告
- 2025至2030年中國(guó)天然珍珠柔和卸妝露數(shù)據(jù)監(jiān)測(cè)研究報(bào)告
- 2025至2030年中國(guó)雙耳健康節(jié)能復(fù)合鐵鍋數(shù)據(jù)監(jiān)測(cè)研究報(bào)告
- 2025年中國(guó)鈣生化試劑市場(chǎng)調(diào)查研究報(bào)告
- 2025至2031年中國(guó)電腦儲(chǔ)存全鎖頻道發(fā)生器行業(yè)投資前景及策略咨詢研究報(bào)告
- 從評(píng)價(jià)附加語(yǔ)看英語(yǔ)的主客分離特質(zhì)和漢語(yǔ)的主客融合特質(zhì)
- 二零二五年度醫(yī)療器械出口合同執(zhí)行與質(zhì)量監(jiān)管協(xié)議3篇
- 年薪制勞動(dòng)合同2025版:高科技企業(yè)人才激勵(lì)范本4篇
- 專用會(huì)議接待:2024酒店住宿與餐飲服務(wù)合同2
- 二零二五年度出軌男方離婚財(cái)產(chǎn)分割及子女未來(lái)職業(yè)規(guī)劃合同4篇
- 江蘇省蘇州市2024-2025學(xué)年高三上學(xué)期1月期末生物試題(有答案)
- 銷售與銷售目標(biāo)管理制度
- 人教版(2025新版)七年級(jí)下冊(cè)英語(yǔ):寒假課內(nèi)預(yù)習(xí)重點(diǎn)知識(shí)默寫(xiě)練習(xí)
- 2024年食品行業(yè)員工勞動(dòng)合同標(biāo)準(zhǔn)文本
- 2025年第一次工地開(kāi)工會(huì)議主要議程開(kāi)工大吉模板
- 全屋整裝售后保修合同模板
- 高中生物學(xué)科學(xué)推理能力測(cè)試
- GB/T 44423-2024近紅外腦功能康復(fù)評(píng)估設(shè)備通用要求
- 2024-2030年中國(guó)減肥行業(yè)市場(chǎng)發(fā)展分析及發(fā)展趨勢(shì)與投資研究報(bào)告
- 運(yùn)動(dòng)技能學(xué)習(xí)
- 單側(cè)雙通道內(nèi)鏡下腰椎間盤(pán)摘除術(shù)手術(shù)護(hù)理配合1
評(píng)論
0/150
提交評(píng)論