![道路施工方案中英文IV Construction Method_第1頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/7/b588112d-26c8-43cf-a188-0e60937dfa41/b588112d-26c8-43cf-a188-0e60937dfa411.gif)
![道路施工方案中英文IV Construction Method_第2頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/7/b588112d-26c8-43cf-a188-0e60937dfa41/b588112d-26c8-43cf-a188-0e60937dfa412.gif)
![道路施工方案中英文IV Construction Method_第3頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/7/b588112d-26c8-43cf-a188-0e60937dfa41/b588112d-26c8-43cf-a188-0e60937dfa413.gif)
![道路施工方案中英文IV Construction Method_第4頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/7/b588112d-26c8-43cf-a188-0e60937dfa41/b588112d-26c8-43cf-a188-0e60937dfa414.gif)
![道路施工方案中英文IV Construction Method_第5頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/7/b588112d-26c8-43cf-a188-0e60937dfa41/b588112d-26c8-43cf-a188-0e60937dfa415.gif)
下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、IV Construction Method, Technical Measurement of Road Works道路工程施工方法及技術(shù)措施1、Road Structure道路構(gòu)造:Heavy load road重型道路:Soil compacting150 mm thick 12% lime soil220mm thick fly-ash200mm thick C30 concrete素土壓實(shí)-150厚碎石基層。-300mm厚二灰結(jié)石-150mm厚C 20砼(內(nèi)配鋼筋 C15予制砼平石、側(cè)石安放-60mm厚粗粒式瀝青砼-30mm厚細(xì)粒式瀝青砼-Light load road輕型道路:So
2、il compacting200mm thick 12% lime soil220mm thick fly-ash200mm thick C30 concrete素土壓實(shí)-150厚碎基層。-50mm粗砂找平層-150mm厚C30砼面層。Pavement人行道:Soil compacting200mm thick fly-ash bedding30mm thicksandprecast cement tile C30素土壓實(shí),100厚碎石基層-50MM厚粗砂上鋪彩色予制人行道磚。2、Road working procedure道路施工流程2.1 Plain soil compacting-soi
3、l density teat-pipe embedding under the road-150*2mm thick 12% lime soil bedding-lime soil test-220mm thick fly-ash beddng-220mm thick C30 concrete finish-concrete curing-curbs paving 素土壓實(shí)-土密實(shí)度側(cè)試-路基下管線埋設(shè)-150*2厚12%石灰土基層。-灰土試驗(yàn)-220mm厚二灰結(jié)石-220mm厚C30砼面層。-砼養(yǎng)護(hù)-路沿石施工2.2、Main Construction Method主要施工方法施工放線:根據(jù)
4、平面坐標(biāo)控制點(diǎn)及設(shè)計(jì)施工圖,測放出道路中心線樁及邊線樁。管線標(biāo)志:在道路工程開工前,安排專人認(rèn)真復(fù)核地下管線和地下隱蔽設(shè)施的位置和標(biāo)高,對外露的各種井口設(shè)置標(biāo)志桿牌,以免埋沒或堵塞。路基壓實(shí)2.2.3.1、When compacting road base, to abide the rules as follows: first light second heavy, first table second vibrate, first slow second quick, first edge second center, first high second low. And compact
5、ion roller should exceed construction joints.路基碾壓時(shí),應(yīng)遵循先輕后重、先穩(wěn)后振、先慢后快、先邊后中、先高后低以及輪跡要重疊等原則,且碾壓輪應(yīng)超過分段施工的接縫。2.2.3.2、When compacting road, to first compact stably then 45 times of vibrating compaction last stably compact again.路基壓實(shí)時(shí)先穩(wěn)壓一遍,再振動(dòng)碾壓四五遍,最后再穩(wěn)壓一遍(碾壓遍數(shù)現(xiàn)場試驗(yàn)后再作調(diào)整。2.2.3.3、To compact longitudinally, a
6、nd first edge side them central part.碾壓順道路縱方向進(jìn)行,且先邊后中;輪跡重疊>30cm。2.2.3.4、After compaction, to test compaction coef., through frequency &quantity for quality control.碾壓速度均勻,輪跡重疊,壓路機(jī)碾壓不到的部位,應(yīng)采用小型機(jī)夯實(shí)或人力夯認(rèn)真夯實(shí),夯擊面在縱橫方向均應(yīng)相互重疊一半,防止漏夯。路基壓實(shí)后不得有松散、彈簧、翻漿及表面不平整現(xiàn)象,若下層未達(dá)到壓實(shí)度要求,不得鋪筑上層。2.2.3.5、Take the soil d
7、ensity test after compaction to judge the quality of the compacted soils.土路基碾壓后,按規(guī)定頻率,數(shù)量進(jìn)行土的密實(shí)度試驗(yàn),以判斷碾壓質(zhì)量。進(jìn)行環(huán)刀試驗(yàn)2.3Construction of fly-ash bedding二灰結(jié)石的施工:1、The fly-ash will be supplied by as the finished product and delivered on site for paving二灰結(jié)石的材料由供貨商成品生產(chǎn)后及時(shí)運(yùn)往工地,鋪設(shè)施工。2、The material mixing scale
8、is strictly comply with the national standard (JTJ034-2000, producing after approval by testing ,材料級配嚴(yán)格按照設(shè)計(jì)要求進(jìn)行配合比設(shè)計(jì),試驗(yàn)確定后生產(chǎn)執(zhí)行。配比為:熟石灰:粉煤灰:碎石=1:2:33、Lime: cinder: aggregate= 5:15:18三灰碎石混合料配比為:石灰;粉煤灰;集料=5:15:184、The fly-ash paving after road compaction, use machine for construction, leveling, compact
9、ing and sloping, we will strictly fulfill the regulation and code during construction.在道路基土壓實(shí),測試合格進(jìn)行二灰結(jié)石的施工,施工用機(jī)械化施工,鋪設(shè)平整(適當(dāng)放坡壓實(shí)密實(shí),嚴(yán)格按規(guī)范要求進(jìn)行。5、Must care for the curing after fly-ash paving, no vehicles pass through during curing period, set barricade for separation.施工完成后的二灰結(jié)石,必須確保養(yǎng)期,在保養(yǎng)期內(nèi)禁止車輛通行,采取道路隔離措施。6、The material inspection w
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025至2031年中國立式焚燒爐行業(yè)投資前景及策略咨詢研究報(bào)告
- 2025至2031年中國板面拋光刷行業(yè)投資前景及策略咨詢研究報(bào)告
- 2025至2031年中國PVDF管路附件行業(yè)投資前景及策略咨詢研究報(bào)告
- 2025至2030年中國豪華木鏡數(shù)據(jù)監(jiān)測研究報(bào)告
- 2025至2030年中國正齒輪數(shù)據(jù)監(jiān)測研究報(bào)告
- 2025至2030年中國杏丁數(shù)據(jù)監(jiān)測研究報(bào)告
- 泡沫外墻一體板施工方案
- 2025至2030年中國倒置三目金相顯微鏡數(shù)據(jù)監(jiān)測研究報(bào)告
- 2025年中國等柄鉆市場調(diào)查研究報(bào)告
- 2025年中國電永磁焊接角具市場調(diào)查研究報(bào)告
- 中國急性缺血性卒中診治指南(2023版)
- 高中學(xué)校工會工作制度
- 人教版八年級上冊數(shù)學(xué)期末考試試卷含答案
- 2024至2030年全球與中國市場頭戴式耳機(jī)深度研究報(bào)告
- 學(xué)前教育普及普惠質(zhì)量評估幼兒園準(zhǔn)備工作詳解
- 電氣控制與PLC課程說課王金莉-長春光華學(xué)院電氣信息學(xué)院
- 青少年人工智能編程水平測試一級-模擬真題01含答案
- 第十五章《探究電路》復(fù)習(xí)課課件滬科版九年級物理
- 《積極心理學(xué)(第3版)》 課件 第10章 感恩
- 2024年中考物理科技創(chuàng)新題型(教師版)
- 2024年工業(yè)廢水處理工(技師)技能鑒定理論考試題庫-上(單選題)
評論
0/150
提交評論