1、文件類型Documenttype文件頁數(shù)Pages版次Version修訂說明Revisionnote受控編號ControllednumberGH201版Version1首次1st儲罐充水試壓方案TankHydro-testPlan22012年11月1日Nov.1,2012版次Edition日期Date編制Formulatedby審核Reviewedby批準Approvedbyo中國化學(xué)工程第十三建設(shè)有限公司The13thConstructionCo.,Ltd.ofCNCE儲罐充水試壓方案TankHydro-testPlan3錄Contents1 適用范圍RangeofApplication22
2、 編制依據(jù)FormulationBasis23 工程概況General24 施工工序ConstructionProcedure35 施工步驟及方法ConstructionProcedureandMethod45.1 檢查內(nèi)容Checkthecontents:45.2 準備工作Preparatorywork:45.3 充水試驗應(yīng)符合下歹U規(guī)定Thehydro-testshallbeincompliancewithfollowingregulations55.4 水壓試驗示意圖Hydro-testDiagram65.5 充水過程檢查InspectionforWaterFillingProcess7
3、5.6 充水試驗方法Hydro-testmethod85.7 基礎(chǔ)沉降觀測FoundationSettlementObservation105.8 放水檢查InspectionforWaterDraining125.9 試壓技術(shù)要求TechnicalRequirementsforPressureTest136 質(zhì)量管理QualityManagement136.1 質(zhì)量保證體系QualityGuaranteeMeasures:136.2 質(zhì)量保證措施QualityGuaranteeMeasures:147 質(zhì)量管理QualityManagement157.1 安全保證體系Safetyassura
4、ncesystem:157.2 安全保證措施計戈UPlanningforsafetyassurancemeasures:16人力計戈UVII.PlanningforLaborForces18九機具準備VII.PreparationsofMachinesandTools18十工作危險源分析評估及預(yù)防Work-relatedHazardAnalysisEvaluationandPrevention19一.適用范圍RangeofApplication1.本方案適用于塞拉尼斯(南京)乙?;虚g體有限公司工業(yè)乙醇項目八期改造擴建罐區(qū)4臺儲罐的充水試驗的施工。Thisplanisapplicabletot
5、heexecutionofthehydro-testfor4tanksinthemodificationandexpansionofthetankfarmofCelaneseChinaFastProject.二.編制依據(jù)FormulationBasis1) 鋼制焊接常壓容器SteelWeldedAtmosphericPressureVesselsJB/T4735-19972) 立式圓筒形鋼制焊接油罐施工及驗收規(guī)范CodeforConstructionandAcceptanceofWeldedSteelOilTankofVerticalBarrelShapeGB50128-20053) 石油化工
6、鋼儲罐地基與基礎(chǔ)施工及驗收規(guī)范SpecificationforConstructionandAcceptanceofSteelStorageTankSubgrade&FoundationinPetrochemicalIndustrySH3528-934) 大型焊接低壓儲罐設(shè)計與建造DesignandConstructionofLarge,Welded,Low-pressureStorageTanksAPI620-20095) 塞拉尼斯技術(shù)要求及相關(guān)過程規(guī)定Celanesetechnicalrequirementsandrelatedprocessregulations.工程概況Gene
7、ral序號No.位號Item名稱Description規(guī)格Spec.設(shè)備凈重Netweightofequipment(t)Weightafterwaterfilling充水后重(t)水water(m3)設(shè)計壓力DesignpressureMpaFillingheight充水高度(m)1V-732產(chǎn)品罐Producttank()1095*975054.34930.6763-0.00154/0.0999.752V-733產(chǎn)品罐Producttank()10795*975054.34930.6763-0.00154/0.0999.753V-744倒液罐Off-spectank()10795*9750
8、54.34930.6763-0.00154/0.0999.754V-737清洗罐Cleaningtank8660*975035.84599.8488-0.00154/0.0999.75Waterdraining五.施工步驟及方法ConstructionProcedureandMethod儲罐已制作完成,且具備水壓試驗條件,充水試驗前應(yīng)對罐體進行聯(lián)合檢查,罐體無損檢測機所有配件、附件安裝檢測完畢檢查合格后對罐體內(nèi)進行清掃封閉人孔等,開始充水,進行充水試驗。充水過程中充水試驗要求與土建基礎(chǔ)沉降觀測結(jié)合起來,設(shè)置專人對進水和放水時間進行監(jiān)控,發(fā)現(xiàn)異常情況應(yīng)及時處理,處理合格后方可繼續(xù)上水。充水試驗結(jié)
9、束后,罐體內(nèi)的水應(yīng)按業(yè)主要求和排放位置及時排放。Beforethehydro-test,thetankshellshallbejointlyinspected.AfterNTDofthetankshell,andallfittingsandaccessoriesareinstalled,tested,inspectedandaccepted,cleanthetankinsideandclosethemanhole,fillwaterandtakethehydro-test.Duringwaterfilling,thehydro-testrequirementsshallbecombinedwi
10、ththecivilstructurefoundationsettlementobservation,personnelshallbespeciallyassignedformonitoringthefillinganddrainingtime,anyabnormalityshallbetreatedintime,nowatercanbefilledinbeforethetreatmentisaccepted.Aftercompletionofthehydro-test,thewaterinthetankshellshallbepromptlydrainedaccordingtotheowne
11、r'srequirementsandthelocationfordraining.5.1 儲罐制造完畢后,進行充水試驗,并檢查下列內(nèi)容:Hydro-testwillbetakenafterthetankisfinishedinfabrication,andthefollowingcontentshallbechecked:1)罐底嚴密性。Tightnessofthetankbottom2)罐壁強度及嚴密性。Strengthandtightnessofthetankshell3)固定頂?shù)膹姸燃皣烂苄?。Strengthandtightnessofthefixedroof4)固定頂?shù)姆€(wěn)定性。
12、Stabilityofthefixedroof5)基礎(chǔ)的沉降觀測。Settlementobservationforthefoundation5.2 壓力試驗前,首先做好以下準備工作:Thefollowingpreparationsshallbemadebeforethepressuretest:1)檢查罐外形尺寸、附件安裝是否符合要求。Checkifthetankoutlinedimensionandaccessoryinstallationsatisfyrequirements.2)充水前將罐內(nèi)雜物清理干凈后進行封閉,罐壁上的接管均用臨時盲板封閉,人孔用人孔法蘭蓋封閉。Beforewater
13、filling,cleanoutsundriesinthetankandcloseit,closethenozzleonthetankshellwithtemporaryblind,andclosethemanholewiththemanholeflange.3)檢查罐管口、法蘭是否已焊接完,是否有漏焊部位。Checkifthetanknozzleandflangearefinishedinwelding,andiftheweldingonanypartismissed.4)接管補強圈用壓縮空氣氣密工作已做完,且合格。Theairtightworkofthecompressedairusedf
14、orthenozzlereinforcingringhasbeencompletedandqualified.5)水源采用消防儲罐的低壓消防水,壓力為1.5MpaoThewaterissourcedfromthelowpressurefirewaterofthefiretank,andthepressureis1.5Mpa.6)沉降觀測,儲罐選定4個沉降觀測點。Settlementobservation:4settlementobservationpointsareselectedfortanks.7)完成罐充水前沉降觀測點和基準點的設(shè)置,并測量0水位時各測點的標高。Setupsettleme
15、ntobservationpointsandreferencepointsbeforewaterfillingforthetank,andmeasuretheelevationofeverymeasuringpointwhenthewaterlevelis0.8)碳鋼儲罐試驗應(yīng)采用潔凈水,試驗用水溫不低于5C。TheCStanktestshalladoptcleanwater,andthewatertemperatureusedforthetestshallnotbelowerthan5C.9)V-737不銹鋼儲罐試驗用水氯離子含量不得超過25mg/L。Thecontentofthechlor
16、ideioninwaterusedforV-737SStanktestshallnotbemorethan25mg/L.10)完成罐充水前沉降觀測點和基準點的設(shè)置,并測量0水位時各測點的標高。Setupthesettlementobservationpointandthereferencepointbeforewaterfillingforthetank,andmeasuretheelevationofeverymeasuringpointwhenthewaterlevelis0.5.3 充水試驗應(yīng)符合下列規(guī)定:Thehydro-testshallbeincompliancewithfollo
17、wingregulations:1)充水和放水過程中,打開放空孔,基礎(chǔ)避免浸水。Duringwaterfillinganddraining,openthe2)充水時嚴格控制上水、停水的進程,隨時檢查水位。Duringwaterfilling,strictlycontroltheprocessofwaterfillingandwatercutoff,andcheckthewaterlevelanytime.3)當?shù)谝慌_儲罐進行充水試驗時,應(yīng)充水時快速充水到罐高的1/2,進行沉降觀測,當不均勻沉降量小于5mm/天時,繼續(xù)充水到罐高的3/4進行觀測,當充水到(設(shè)計液位一1米)進行正壓試驗,當不均勻沉
18、降量仍小于5mm/天時,繼續(xù)充水到最高操作液位,并保持48小時后進行觀測,當沉降量無明顯變化即可放水,放水時做負壓試驗,當沉降量有明顯變化,則保持最高操作液面,每天進行定期觀測,直至沉降穩(wěn)定為止。Whenthehydro-testistakenforthefirsttank,thewatershallbequicklyfilledtothepointof1/2ofthetankheightduringwaterfilling,observethesettlement,whentheunequalsettlementisstilllessthan5mm/day,goonfillinginwate
19、rtothepointof3/4ofthetankheightforobservation;whentheunequalsettlementisstilllessthan5mm/day,goonfillinginwatertothehighestoperatinglevel,andobserveitaftermaintaining48hrs,ifthesettlementdoesn'tobviouslychange,thewatercanbedrained,ifthesettlementobviouslychanges,keepthehighestoperatinglevel,ando
20、bserveitregularlyeveryday,untilthesettlementissteady.4)當?shù)谝慌_儲罐罐基沉降量符合要求后,其余各罐充水試驗時可取罐高的1/2和3/4進行兩次觀硬U。Afterthefoundationsettlementofthefirsttankmeetsrequirements,whenthehydro-testistakenfortheresttanks,thesettlementwillbeobservedtwicerespectiveatthepointof1/2and3/4heightofthetank.5)基礎(chǔ)沉降觀測早、晚各觀測一次,每次的
21、沉降數(shù)據(jù)做好統(tǒng)計,并描繪出基礎(chǔ)沉降變化圖,便于分析。罐基礎(chǔ)沉降允許值(均勻沉降值)Allowablevalueofthetankfoundationsettlement(equalsettlementvalue)儲罐位號TankNo.罐內(nèi)徑(mm)innerdiameteroftank任意直徑方向最終沉降差允許值(mm)AllowablevalueofthefinalsettlementdifferenceinanydiametricaldirectionV-73210668160mmV-73310668160mmV-74410668160mmV-7378534128mmReferenceva
22、lve:Allowablevalueofthetankfoundationsettlement(equalsettlementvalue)Attachedtable1FloatingrooftankandinnerfloatingrooftankFixedrooftankValve31任A宜f令方向JH終況脩差汴呼低D<22n,(HSD參考數(shù)值:基礎(chǔ)沉降型許可值附表1浮質(zhì)嶂與內(nèi)附丁更D(,】J任總應(yīng)使方向俄終歷降整許時優(yōu)Dn】,22cpM和OJJ06D22<O<tif任】口«4。(JM值口h»<D<i;(ifU'iiKD4U<D&
23、#163;6。03)(14D5.4水壓試驗示意圖:Hydro-testDiagram消防帶firehose臨時管線接入口Temporarypipeaccess儲備瞿tank$108*6在罐區(qū)內(nèi)的泡沫消防臨時接入處,用臨時管線(閥Valve4108X6另一臺儲罐anothertank壓力表pressuregauge污水井drainwellInsidediameteroftankD(m)AllowablevalueofthefinalsettlementdifferenceinanydiametricaldirectionInsidediameteroftankD(m)Allowablevalue
24、ofthefinalsettlementdifferenceinanydiametricaldirection小108*6接到儲罐泡沫降落槽接口上;Connectthetemporarypipe(小108*6totheaccessofthetankfoamdescendinggrooveatthetemporaryaccessoffoamfire-proofinthetankfarm.按上圖所示建立試壓系統(tǒng);Establishthepressuretestsystemaccordingtotheabovediagram.5.5充水過程檢查:InspectionforWaterFillingPr
25、ocess1)進水時專人看守進水閥門,嚴格控制水源大小,同時找專人通過u型計觀察儲罐實際充水量并與進水人員配合,過程為1/2液位高度一3/4液位高度一滿水高度-1米一滿水高度Thesecurewaterwhentheinletvalve,strictcontrolofwaterthesizeof,atthesametimetofindsomeonethroughtheU-meterObservethethetanksactualchargewaterandinfluentpersonnelwiththeprocessfortheliquidleveloftheliquidlevel-1/23/
26、4HeigM一一fullofwaterfullofwaterheight2)充水試驗中應(yīng)加強基礎(chǔ)沉降觀測,如基礎(chǔ)發(fā)生不允許的沉降,應(yīng)停止充水,待處理后,方可繼續(xù)進行試驗。Dointensifysettlementobservationduringthehydro-test,ifunallowablesettlementarisesfromthefoundation,thewaterfillingshalltop,anddonotgoonthetestbeforetreatment.3)充水和放水過程中應(yīng)打開罐頂人孔Doopenthemanholeonthetankroofduringthepr
27、ocessofwaterfillinganddraining.4)充水過程中應(yīng)控制水的流速,水面上升的速度應(yīng)不超過0.9m/h。Docontroltheflowspeedofwaterduringwaterfilling,andthespeedofwatersurfaceascentshallnotexceed0.9m/h.5)上水過程中在最高設(shè)計液位的50%和75%進行罐體檢查。Duringwaterfilling,checkthetankbodyatthepointof50%and75%ofthehighestdesignlevel.充水水1P曲線1%Fillingwatertestcur
28、vechart5.6 充水試驗方法:Hydro-testmethod:1)罐底的嚴密性,應(yīng)以充水試驗過程中罐底無滲漏為合格,若發(fā)現(xiàn)滲漏,應(yīng)放水后進行檢查補焊。Tightnessofthetankbottom:ifthetankhasnoleakageduringthehydro-test,itisacceptable,incaseofanyleakage,itshallbeinspectedandwelding-repairedafterwaterdraining.2)罐壁的強度及嚴密性試驗,應(yīng)以充水到設(shè)計最高液位并保持48h后,罐壁無滲漏、無異常變形為合格,發(fā)現(xiàn)滲漏時應(yīng)放水,使液面比滲漏處低
29、300mm進行修補。Strengthandtightnesstestforthetankshell:ifthetankshellisfreeofleakage,abnormalityanddeformationafterthewaterisfilledtothehighestdesignlevelandmaintains48h,itisacceptable,incaseofanyleakage,thewatershallbedrainedtomakethewaterlevel300mmlowerthantheleakage.3)固定頂?shù)膹姸燃皣烂苄栽囼?,打開閥門1,關(guān)閉閥門2,通過消防帶從罐頂
30、部進行上水,在上水至設(shè)計液面高度下1米處時,用盲板封堵所有開孔,緩慢調(diào)節(jié)閥門1,緩慢上升,升壓至試驗壓力(0.12Mpa)時,停止充水,進行固定頂強度及嚴密性試驗,在罐頂涂以肥皂水檢查,試驗后應(yīng)立即將罐頂孔開啟,與大氣相通,恢復(fù)至U常壓;Strengthandtightnesstestofthefixedroof:openValve1,closeValve2,andfillwaterfromthetanktopthroughthefirehose,whenthewaterisfilledtothepointof1mlowerthanthedesignlevel,blockallopenings
31、byblinds,slowlyregulateValve1,thepressureslowlyrises,whenthepressurerisestothetestpressure(0.12Mpa),stopfillingwater,andconductthestrengthandtightnesstestforthefixedroof,applysoapywateronthetankroofforinspection,anddoopenthetankroofholeimmediatelyafterthetest,soastocontacttheatmosphereandrecovertono
32、rmalpressure.4)固定頂?shù)姆€(wěn)定性試驗,充水到設(shè)計最高液位時,用盲板封堵所有開孔,打開閥門4、3,用放水方法進行固定頂?shù)姆€(wěn)定性試驗,緩慢降壓,達到試驗負壓(-0.00162Mpa)時,觀察罐頂(罐頂無異常變形為合格),試驗后應(yīng)立即將孔開啟,與大氣相通,恢復(fù)到常壓;固定頂儲罐在充水到8754mm液位前,應(yīng)打開頂部人孑I。Stabilitytestforthefixedroof:whenthewaterisfilledtothehighestdesignlevel,blockallopeningswithblinds,openValve3andValve4,conductthestabi
33、litytestofthefixedroofbywaterdraining,depressurizeditslowly,whenitisuptothetestnegativepressure(-0.00162Mpa),observethetankroof(itisacceptableifthetankroofisfreeofabnormalityanddeformation),doopentheholeimmediatelyafterthetest,soastocontacttheatmosphereandrecovertonormalpressure.Theroofmanholeshallb
34、eopenedbeforethewaterinthefixedrooftankisfilledtothelevel8754mm.試驗項目Testitem試驗方法Testmethod合格標準Standardofacceptability罐底嚴密性tightnessoftankbottom充水試驗,觀察基礎(chǔ)周邊。Hydro-test,observetheperipheryofthefoundation.無滲漏為合格Itisacceptableifnoleakage.罐壁強度及嚴密性試驗strengthandtightnesstestfortankshell充水至最圖設(shè)計液向,保持48h0Fillw
35、atertothehighestdesignlevelandmaintain48h.無滲漏、無異常變形為合格Itisacceptableifnoleakageorabnormality.固定頂強度及嚴密性試驗strengthandtightnesstestforthefixedroof罐內(nèi)充水到最高設(shè)計液位下1m,將所有開孔封閉,緩慢充水升壓,當升至試驗壓力時,暫停充水,在罐頂涂以肥皂水檢查,試驗后應(yīng)立即將罐頂孔開啟,與大氣相通,恢復(fù)到常壓Whenthewaterinthetankisf川edtothepointof1mlowerthanthedesignlevel,blockallopeni
36、ngsbyblinds,slowlyfillwaterandboostpressure,whenthepressurerisestothetestpressure,suspendthefillingofwater,applysoapywateronthetankroofforinspection,anddoopenthetankroofholeimmediatelyafterthetest,soastocontacttheatmosphereandrecovertonormalpressure.a)罐頂無異常變形Thetankroofisfreeofabnormalityanddeformat
37、ion.b)未發(fā)現(xiàn)焊縫滲漏為合格Itisacceptableifnoleakageofweldedjointsisfound.固定頂?shù)姆€(wěn)定性試驗stabilitytestforthefixedroof充水到設(shè)計液位時,用放水方法進行試驗,緩慢降壓,達到試驗負壓時,觀察罐頂,試驗后應(yīng)立即將孔開啟,與大氣相通,恢復(fù)到常壓。Whenthewaterisfilledtothedesignlevel,conductthetestbywaterdrainingmethod,depressurizeitslowly,whenitisuptothetestnegativepressure,doopentheh
38、oleimmediatelyafterthetestsoastocontacttheatmosphereandrecovertonormalpressure.罐頂尢異常發(fā)形Thetankroofisfreeofabnormalityanddeformation.5)當考慮水的重復(fù)利用,第一臺罐水壓試驗完畢后,緩慢打開閥3,將水直接排到第二臺罐里,待兩罐水位平衡后,關(guān)閉閥2,然后利用消防帶進行上水;Inviewofrecyclingofwater,afterthefirsttankisfinishedinthehydro-test,slowlyopenValve3,directlydrainth
39、ewatertothesecondtank,afterthewaterlevelinthetwotanksisbalanced,closeValve2,andthenfillwaterwiththefirehose.5.7 基礎(chǔ)沉降觀測FoundationSettlementObservation1)根據(jù)儲罐的體積和直徑,確定儲罐沉降觀測的點數(shù),見下圖。Makesurethenumberoftanksettlementobservationpointsaccordingtothevolumeanddiameterofthetank,seethefollowingdrawing.V-732/V-
40、733markedraphofsertlemetifmarkedraphofsettkmentv744沉降標識國mirkedgraphofsettlementV-7374年布胭2)四臺儲罐分另1J選好基準點為控制點。Referencepointsarerespectivelyselectedforthefourtanksascontrolpoints.3)空罐(上水前,第一次)一1/2液位高度(第二次)一3/4液位高度(第三次)一滿水高度(1小時第四次)一滿水高度-1米(第五次)一滿水高度(48小時后,第六次)一空罐(放水后,第七次)Emptytank(beforewaterfilling,t
41、hefirsttime)1/2waterlevel(thesecondtime)3/4waterlevel(thethirdtime)fullwaterlevel(1hr,thefourthtime)fullwaterlevel(after48hrs,thefifthtime)empty(afterwaterdraining,thesixthtime)4)水壓試驗過程中,應(yīng)緊密跟蹤罐體每次的沉降量,檢查其是否符合規(guī)范允許值。Duringthehydro-test,closelytrackthesettlementofthetankbodyeverytime,andcheckiftheysati
42、sfythespecifiedallowablevalue.5)儲罐基礎(chǔ)沉降允許值:充水高度為:H/2(H為罐高),沉降量<5mm/d,充水高度為:3H/4,沉降量仍<5mm/d,充水到最高液位后,保持48h觀測,總沉降量<25mm.Allowablevalueofthetankfoundationsettlement:thewaterfillinglevel:H/2(Histheheightofthetank),thesettlement<5mm/d,thewaterfillingheightis3H/4,thesettlement<5mm/d,afterthe
43、waterisfilledtothehighestlevel,observeitfor48h,andthetotalsettlement<25mm.6)為方便測出罐內(nèi)液位的實際高度,從罐壁管口上接出一臨時閥門,并將軟管接從低接管接到罐頂,為防止塑膠管滑落,采用柔性材料將其臨時綁扎到腳手架靠里側(cè)。Inordertomeasuretheactualheightofthewaterlevelinthetank,extendatemporaryvalvefromthetanknozzle,andconnectthehosetothetankrooffromthelowernozzle,inord
44、ertopreventplasticpipefromsliding,bindittotheinnersideofthescaffoldtemporarilywithflexiblematerial.5.8 放水檢查InspectionforWaterDraining1)放水停留時間應(yīng)符合土建專業(yè)設(shè)計文件的要求Waterdrainingdetentiontimeshallbeincompliancewiththerequirementsofdesigndocumentsofthecivilworkdiscipline.2)儲罐試壓完畢后,放水應(yīng)排放到指定位置(罐區(qū)圍堰內(nèi)部排水溝),不可就地排放使
45、基礎(chǔ)浸水;Afterthetankpressuretestisfinished,thewatershallbedrainedtothespecifiedposition,andcannotbedrainedlocallyforfearoffoundationsoaking.3)罐內(nèi)應(yīng)徹底地進行清掃,除去銹蝕,底板不應(yīng)有顯著的變形和明顯凸凹,各附件應(yīng)符合圖樣要求,且無異常現(xiàn)象。Thetankshallbecompletelycleaned,rustshallberemoved,andbottomplatesshallbefreeofsignificantdeformationandobvious
46、unevenness,allaccessoriesshallbeincompliancewithdrawingrequirements,andbefreeofanyabnormality.4)放水后及時將罐內(nèi)的積水和雜物清掃干凈,應(yīng)打開所有的管口和人孔,以加強罐內(nèi)的空氣流通,當罐內(nèi)水吹干后,及時檢查,并用抹布清除干凈罐內(nèi)的水漬。Cleanupaccumulatedwaterandsundriesinthetankinpromptlyafterwaterdraining,allnozzlesandmanholesshallbeopened,soastostrengthenventilationi
47、nthetank,afterthewaterinthetankisdried,inspectitintimeandremovewaterstaininthetankwithrags.5.9 試壓技術(shù)要求TechnicalRequirementsforPressureTest1 .一般要求generalrequirements1)試壓工作開戰(zhàn)前,施工技術(shù)人員必須對參加試壓的所有人員進行技術(shù)交底,安全交底,嚴格遵守安全鄉(xiāng)己律和操作規(guī)程。Beforestartofthepressuretest,technicalpersonnelofconstructionshallgivetechnicaland
48、safetypresentationtoallpressuretestparticipants,andabidebysafetydisciplinesandoperatingregulationsstrictly.2)劃定危險區(qū),并安排人員負責警戒,禁止無關(guān)人員進入。Dividedangerouszones,andarrangepersonstoberesponsibleforalert,andnoentryforunrelatedpersonnel.2 .試驗時白要求testrequirements1)水壓試驗時,嚴禁對罐身、接口進行敲打或修補缺陷,嚴禁帶壓修理,泄壓后再進行修補,缺陷消除后
49、重新試壓。Duringthehydro-test,neitherknockthetankbodyornozzlenorrepairdefects,repairwithpressureisprohibited,andnorepairbeforepressurerelease,repeatthepressuretestafterremovalofdefects.2)罐頂穩(wěn)定性試驗時,確保安全裝置良好。Duringthestabilitytestforthetankroof,ensurethesafetydeviceisgood.3)負責降壓的操作人員必須控制升壓的速度,進水,泄壓注意防空。Oper
50、atorswhoareresponsibleforreducingpressuremustcontrolthespeedofboostingpressure,waterinflowandpressurerelief,andpayattentionnottoemptying.4)水壓試驗后,試壓用水必須由管道排放至指定地點,不得就地排放。Afterthehydro-test,thewaterusedforpressuretestshallbedrainedtothespecifiedlocationthroughthepipe,donotdrainitlocally.6.質(zhì)量管理QualityM
51、anagement6.1 質(zhì)量保證體系QualityGuaranteeMeasures1項目經(jīng)理部質(zhì)量保證體系見施工組織設(shè)計。Forthequalityguaranteesystemoftheprojectmanagerdepartment,seetheconstructionorganizationdesignplease.2作業(yè)層質(zhì)量保證體系。Qualityguaranteesystemoftheoperationlevel施工班組長(兼職質(zhì)檢員)施工班組6.2質(zhì)量保證措施QualityGuaranteeMeasures1)試驗時每臺儲罐應(yīng)裝設(shè)1塊壓力表,1塊真空表,試驗壓力以裝設(shè)在設(shè)備最
52、高處的壓力表讀數(shù)為準。Duringthetest,eachtankshallbeprovidedwithonepressuregaugeandonevacuumgauge,andthetestpressureshallbebasedonthereadingofthepressuregaugemountedonthehighestpointoftheequipment.1.53倍。Thepressuregauge2)壓力表須經(jīng)校準,精度不低于1.5級,量程為最大被測壓力的shouldbecalibrated,theprecisionshallnotbelowerthanGrade1.5,andt
53、hemeasuringrangeis1.5-3timesofthegreatestpressuremeasured.3)有專人看護壓力表,嚴禁超過規(guī)定的試驗壓力。Personnelshallbespeciallyassignedtowatchthepressuregauge,thetestpressureagainstregulationsisforbidden.4)嚴格控制上水、進水、放水的過程,以避免超壓或抽空。Strictlycontroltheprocessofwaterfilling,waterinflowandwaterdraining,soastoavoidoverpressur
54、eoremptying.七.安全管理XSafetyManagement7.1 安全保證體系Safetyassurancesystem7.1.1 項目經(jīng)理部安全保證體系見施工組織設(shè)計;Forthesafetyassurancesystemoftheprojectmanagerdepartment,seetheconstructionorganizationdesignplease.7.1.2 作業(yè)層安全保證體系;SafetyassurancesystemoftheoperationlevelResponsibleEngineeroftheFull-timeSafetyInspectorconst
55、ructionConstructionShiftLeader(Part-timeSafetyInspector)Constructionshifts7.2 安全保證措施計戈UPlanningforsafetyassurancemeasures7.2.1 一般要求:Generalrequirements:1壓力試驗的各項準備工作必須經(jīng)過我方質(zhì)量部門的自檢合格,安全工作經(jīng)過HSE經(jīng)理同意后方可開始進行試壓工作。Allpreparationsforthepressuretestshallbeself-inspectedbyourqualitydepartmentandacceptable,andth
56、epressuretestcannotbeconductedbeforethesafetyworkisapprovedbyHSEmanager.2所有參與壓力試驗人員要進行崗位分工,責任明確;Allpressuretestparticipants,dutyshallbedividedwithclearresponsibility.3試壓時用警戒繩將儲罐圈出安全范圍,無關(guān)人員不得擅自靠近,以防止突發(fā)事故。Duringthepressuretest,thealertropeshallbeusedtoringthesafetyrangeofthetank,andunrelatedpersonnels
57、hallnotapproachwithoutauthorization.4試壓時隨時注意環(huán)境溫度的變化,監(jiān)視壓力表的讀數(shù),防止發(fā)生超壓現(xiàn)象。Duringthepressuretest,payattentiontothevariationoftheambienttemperatureanytime,soastoavoidoverpressure.5試壓過程中,如發(fā)現(xiàn)有異常響聲、壓力下降或加壓裝置發(fā)生故障燈不正?,F(xiàn)象時,應(yīng)立即停止試驗,并查明原因。Duringthepressuretest,incaseofanyDuringtheabnormalnoise,pressuredroporabnormalitya
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- JJF 2181-2024塑料薄膜和薄片氧氣透過率測試儀校準規(guī)范
- 2024年版簡易個人向公司借款合同模板
- 2024年版權(quán)授權(quán)費用協(xié)議
- 杞縣特色小鎮(zhèn)投資建設(shè)研究報告
- 硫酸鹽項目申請報告可行性研究報告
- 中秋節(jié)假日作文大全10篇
- 水滸傳每章讀書筆記
- 雙十一促銷活動策劃方案8篇
- 保護樹木的建議書模板匯編十篇
- 法律執(zhí)法課程設(shè)計
- 提醒關(guān)電關(guān)水關(guān)門注意安全的公告
- 箱變檢測報告
- 河南省商丘市民權(quán)縣2023-2024學(xué)年八年級上學(xué)期期末語文試題
- 初中教師教學(xué)基本功培訓(xùn)內(nèi)容課件
- 工業(yè)互聯(lián)網(wǎng)平臺建設(shè)方案
- 精準醫(yī)療的商業(yè)模式
- 2023-2024學(xué)年四川省成都市金牛區(qū)八年級(上)期末數(shù)學(xué)試卷
- 海南省省直轄縣級行政單位樂東黎族自治縣2023-2024學(xué)年九年級上學(xué)期期末數(shù)學(xué)試題
- 智慧物流第套理論題附有答案
- 湖北省武漢市江漢區(qū)2023-2024學(xué)年五年級上學(xué)期期末語文試題
- 江蘇省連云港灌南縣2023-2024學(xué)年七年級上學(xué)期期末考試語文試題
評論
0/150
提交評論