設(shè)備運行維修手冊疏水閥中文_第1頁
設(shè)備運行維修手冊疏水閥中文_第2頁
設(shè)備運行維修手冊疏水閥中文_第3頁
設(shè)備運行維修手冊疏水閥中文_第4頁
設(shè)備運行維修手冊疏水閥中文_第5頁
已閱讀5頁,還剩12頁未讀 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

1、HANGZHOU LIANGGONG VALVE CO.,LTD.EQUIPMENT OPERATION AND MAINTENANCE MANUALCHAPTER:00PAGE:1DATE:2012-11-23EDITION:ADRAIN VALVEChapter0 CONTENT VERSION00.1 CONTENTSee next pageHANGZHOU LIANGGONG VALVE CO.,LTD.EQUIPMENT OPERATION AND MAINTENANCE MANUALCHAPTER:00PAGE:2DATE:2012-11-23EDITION:ADRAIN VALV

2、ECONTENT00 Catalog, version . 100.1 directory . 200.2 version . 3Chapter 0 Overview . 40.1 Equipment Model . 40.2devices applicable standard . 4Chapter 1 Device Description . 51.1 General data . 51.1.1 Operation Characteristics . 51.1.2 installation characteristics . 51.2 Detailed Description . 61.2

3、.1 Main parts . 61.2.2 Accessories . 71.3 Installation Requirements . 7Chapter 2 Run Rules . 8Start . 8 2.1 first start and overhaul2.2 Normal operation . . 82.3 Troubleshooting . . . . . . 8Chapter 3 Maintenance . . 93.1 during the normal operation of consumable spare parts list . . 93.2 special to

4、ols . . 93.3-handling device . . 93.4 spare parts storage conditions . . . 93.5 Maintenance Requirements . . 113.5.1 routine maintenance . 113.5.2 Preventive Maintenance . 113.5.3 regularly test . 113.5.4 disintegration maintenance . 113.5.5 the equipment outage during the maintenance and Notes . 12

5、3.5.6 special parts . 12Chapter 4 drawings . 134.1 General Plan . 14 HANGZHOU LIANGGONG VALVE CO.,LTD.EQUIPMENT OPERATION AND MAINTENANCE MANUALCHAPTER:00PAGE:3DATE:2012-11-23EDITION:ADRAIN VALVE00.2 VERSIONVERSIONDATECHAPTERPAGEAMENDMENT RANGE AND FOUNDATIONA2012-11FIRST VERSIONHANGZHOU LIANGGONG V

6、ALVE CO.,LTD.EQUIPMENT OPERATION AND MAINTENANCE MANUALCHAPTER:00PAGE:4DATE:2012-11-23EDITION:ADRAIN VALVEChapter 0 Overview Float-drain valve (referred to as drain valve), capable discharging in time of steaming pipe the condensate to prevent steam leak in the network and heating equipment, so as t

7、o ensure the normal operation of thermal equipment and pipe network has a significant effect on the energy conservation. Widely used in the chemical, refining, power, textile, paper and other industrial and mining enterprises, in particular, is more suitable for low pressure, high requirements of la

8、rge displacement and temperature stability, and should not be slack condensate steam equipment.01 Equipment modelThis manual corresponding model see table 0.1Table 0.1 Corresponding information of equipmentNO.ModelEquipment function codeValve DNSafety ClassWarranty ClassAnti-knock Grade1LGS45-16/15N

9、AQNCNA02 Equipment applicable standardsa). GB/T9113-2010 Integral steel pipe flangesb). GB/T12250-2005 steam drain valve term, sign, structure lengthc). GB/T22654-2008 steam drain valve technical conditionsHANGZHOU LIANGGONG VALVE CO.,LTD.EQUIPMENT OPERATION AND MAINTENANCE MANUALCHAPTER:00PAGE:5DAT

10、E:2012-11-23EDITION:ADRAIN VALVECHAPTER 1 EQUIPMENT DESCRIPTION1.1 General Data1.1.1 Operation CharacteristicsDrain valve is mainly made up of body, float, filters, valve cover, valve seat, etc.Medium flows into the valve body, according to the principle of buoyancy, the float valve body of lifting

11、movement change with the water level according to the opening and closing of valves, work as drain blocking air role.Drain valve main features: continuous drainage, stable performance, large displacement, small amount of leakage can be ranked saturated water continuously, resulting in a smaller stoc

12、k of stagnation of equipment condensate, heating up fast, stable heating temperature, automatic exhaust cold air device, no air lock phenomenon, the work is steady and no noise. Main Installation FeaturesNO. MODELEquipment function codeEquipment outline size(mm)Approx. Weight(Kg)Connection1LGS45-16/

13、1951002057Flanged GB/T9113-2010HANGZHOU LIANGGONG VALVE CO.,LTD.EQUIPMENT OPERATION AND MAINTENANCE MANUALCHAPTER:00PAGE:6DATE:2012-11-23EDITION:ADRAIN VALVE1.2 Detailed Description Pic.2 The DRAIN VALVE structure diagram1. Outfall drain plug 2. Valve body 3. Drain plug 4 locking screws 5 seat 6 flo

14、at ball 7 Hole Collar 8 filters9. Valve cover gasket 10 valve cover 11 bolt head bolt 12 nut 13. Drain seat 14 top heart Main PartsName MaterialFunctionValve bodyCF8Motionless part,Pressure-containing part Valve seat304Motionless part to control flow area and achieve valve functionFloat ball304Motio

15、n part to control flow area and achieve valve functionValve coverCF8Motionless part,Pressure-containing partHANGZHOU LIANGGONG VALVE CO.,LTD.EQUIPMENT OPERATION AND MAINTENANCE MANUALCHAPTER:00PAGE:7DATE:2012-11-23EDITION:ADRAIN VALVE AccessoriesNO1.3 Installation Technical Requirements1.3.1 Check-u

16、p before installation.1 Clean the pipeline before installation. Because any smudginess may damage the valve sealing surface, even prevent the valve normal close and open, so make sure any dirt, metal debris, welding slag etc. in the pipline is cleared before installation. .2To check valve type, tag

17、no. size, pressure, temperature, safety class etc. according to the lay-out drawing before installation.3 To check valve nameplate content ensure valve type, connection size, flange size, valve material, operating temperature, applicable media meet the processing condition. .4 Valve appearance and c

18、leanliness examination before installation: a. Clear and fixed marking; b. Valve body two ends are well sealed before installation, no rust and smudginess inside the body; c. No mechanical damage; d. No pollution.5 Throw or drop is forbidden during the handling and installation.1.3.2 Installation Re

19、quirements.1 Fluid flow should be in the same direction indicated as the flow arrow on valve body; Center flow channel should be in the same axis as the pipeline center channel.1.3.2.2 In order to avoid the fatigue damage of the valve seat, the valve is not suitable for installation in place of the

20、maximum working pressure in the pipeline. 1.3.2.3 Valve should be installed in the natural state, to prevent the valve due to piping, support, etc. larger mounting stress.1.3.2.4 Valve installation should be according to the lay-out and also easy for valve installation, maintenance, besides, meet th

21、e follow requirement::a. Valve commissioning space required;b. Actuator disassembly space required;Valve identification plate be hang on valve before installation.HANGZHOU LIANGGONG VALVE CO.,LTD.EQUIPMENT OPERATION AND MAINTENANCE MANUALCHAPTER:00PAGE:8DATE:2012-11-23EDITION:ADRAIN VALVECHAPTER 2 O

22、PERATION DETAILS2.1 Valve First or After Maintenance Operation 2.1.1 Check valve processing pressure, flow, temperature accordingly before put into operation.2.1.2 There are often smudginess such as welding beads, metal shavings, burr etc. deposited in the system pipeline when valve first or after m

23、aintenance operation, so care should be taken when clean these smudginess, especially to protect the valve seat and float ball2.2Normal Operation2.2.1 Medium flows into the valve body, according to the principle of buoyancy, the float valve body lifting movement with the water level so changes the o

24、pening and closing of valves, working as a drain blocking air role.2.2.2 Automatic emptying means, such as if valves is not in normal state in the work process, remove the air vent on the cover to release, so that the discharge the air out the valve, and then tighten the drain plug, enable the valve

25、 to resume normal work .2.2.3Ex-work commissioning has been made according to customer requirement, installed and ready for operating.2.2.4 After product put into normal operation, users just check the indicated input pressure stable and output pressure indicated accordingly or not. Follow table 2.3

26、 shows some failures and how to remove it.2.3 Malfunction and TreatmentNO.FailuresCausesRemovals1Undrained. Filter, or seat clogging;working differential pressure gaugeThe water can not go up due to the occurrence of water hitting damageWashing lines, filters and valves dirt. DRAIN VALVE change the

27、appropriate model. Replacement float2Do not shut down, spout. Installation errors. Foreign body float and valve seat. Bypass valve failureRequire the installation in accordance with the installation diagramDisintegration cleaning, remove the foreign body. Replacement bypass valve3Steam leakage float

28、, the seat does not seal occupies a position of the valve body and valve cover bolts loose, causing the gasket leak. Bypass valve failureGrinding seat or replace the float. Tighten the bolt, replace the gasket. Replacement bypass valve 注:排除方法的具體操作步驟詳見解體維修章節(jié)HANGZHOU LIANGGONG VALVE CO.,LTD.EQUIPMENT

29、OPERATION AND MAINTENANCE MANUALCHAPTER:00PAGE:9DATE:2012-11-23EDITION:ADRAIN VALVECHAPTER 3 MAINTENANCE3.1Consumable spare list during normal operation Table 3.1 NO.Spare NamePart no.Reference Drawing no.Equipment tag no. QtyUnitWarranty GradeRemarks1Filter net8LGS45Y16P015-0All tag nos. correspond

30、ing to the drawing no/pieceQNC Valve seat5/pieceQNCFloat ball6/pieceQNC3.2 Special ToolsNO3.3 Transportation Equipment NA3.4 Spare Parts Storage Condition3.4.1 Original packaging or not Applicable3.4.2 Storage EnvironmentStorage area classificationStorage area refers to the ambient area of an equipm

31、ent, which not must be an isolation region.An equipment alone can composed a storage area if itself appearance is isolating with the ambient. Storage area can be classified into I, II, and III strictly according to requirement. I Storage Area:Composed by a closed space that can withstand the atmosph

32、eric environment, and its ground being laid or by dense material which will not produce any dust. Storage temperature should be maintained above 16, in order to reduce the inside moisture condensation. Equipment should be placed on the shelf or plate. The area should be cleaned regularly.II Storage

33、Area:Composed by a closed space that can withstand the atmospheric environment, and its ground being laid or by dense material which will not produce any dust. Equipment should be placed on the shelf or plate. The area should be cleaned regularly.HANGZHOU LIANGGONG VALVE CO.,LTD.EQUIPMENT OPERATION

34、AND MAINTENANCE MANUALCHAPTER:00PAGE:10DATE:2012-11-23EDITION:ADRAIN VALVEIII Storage Area:Outdoor storage, which can be drained smoothly, ground should be fine stone and concrete slab. Equipment should be placed on the shelf or plate. The area should be cleaned regularly.Valves and spare parts shou

35、ld be stored in the II storage area. Temperature and humidityStored in a ventilated, dry, clean and norm temp. Finished products warehouse, stacked in open area is prohibited.3.4.4 CleanCleaned before ex-work. Users can open and put valve into operation directly.3.4.5 Special requirement for storage

36、, transportation and isolation3.4.5.1 Transportationa) Opening transport: it can be chosen when this transportation would not damage the equipment. Flame-retardant waterproof tarpaulin covers should be used at necessary conditions. Internal air circulation in the waterproof cover should be ensured t

37、o prevent water condensation.b) Closed transport: if equipment not suitable for opening transport, closed transport should be chosen.c) It is necessary to prevent injury and burr during the transportation, rough handling is prohibited. d) It is necessary to prevent pollution during the transportatio

38、n according to relevant provisions e) Packaging layer, plug covers should in intact after loading and uploading, or should be replaced. StorageUnless acceptance inspection is required, the packed or maintainable equipment should be kept original condition until the end of storage period. (Cover and

39、plug should stay in place). Restore the packaging and protective layer after inspection finished. The packaging outermost layer should have signs or marks which stated word: Do not open the package before the final inspection. a) Stainless steel equipment shall not contact with carbon steel or conta

40、minants during loading and uploading and storage.b) Waste materials should be put in isolation area temporary.c) Spare parts and individually wrapped accessory should be stored separately and identified.d) Equipment should not put together with corrosive products, and packed boxes should be above th

41、e ground and walls 100mm.e) Stocked products to be transported should be put away and maintained according to specification, and type classification Other requirementNAHANGZHOU LIANGGONG VALVE CO.,LTD.EQUIPMENT OPERATION AND MAINTENANCE MANUALCHAPTER:00PAGE:11DATE:2012-11-23EDITION:ADRAIN VALVE3.5 M

42、aintenance requirement3.5.1 Daily Maintenancea) Regular maintenance should be taken after valve operation, and examine if the sealing surface, gasket in well condition or aging; If failure conditions are found, valve should be repaired or replaced promptly. Valve should be reassembled and readjusted

43、 if whole valve has been replaced.b) During the normal operation of drain valve, it is required to check if the input pressure indicated value conform to the processing ones, besides, examine the leakage of gasket and connection parts, if leaks occurs, it should be fastened or replaced at once. c) I

44、f the condensation of the media will lead to affect the valves performance, users should adopt appropriate measures to assess the degree of condensation of such media, or to replace other types of valves.3.5.2 Preventive MaintenanceIt is recommended every week maintenance for the equipment, and main

45、ly check-up the internal and external leakage, and replace gasket at necessary condition.3.5.3 Regular TestNA3.5.4 Disassembly Maintenance.1Disassemble valve partsDisassembly method(see pic 2) Avoid physical injury caused by sudden pressure leakage. It is required to cut off and discharge the pressu

46、re between the valve and tubes carefully before disassembly;First outfall drain plug unscrew sewage drained. Then unscrew the valve cover 10 centering 14 and drain seat 13 connected to the body and bonnet nut wrench 12 unscrew attendant can remove the valve cover 10 and the valve cover gasket 9. Hole Collar removed from the valve chamber, and come up with filter 8 float turn unscrew the valve body of the plug and locking screw, then remove the seat 5.All parts must be cleaning and inspe

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論