1、PAGE TOC o 1-3 h z u HYPERLINK l _Toc409432596 第一章 工程概述 PAGEREF _Toc409432596 h 4 HYPERLINK l _Toc409432597 1.1 工程簡(jiǎn)介 PAGEREF _Toc409432597 h 4 HYPERLINK l _Toc409432598 1.2 施工特點(diǎn)和難點(diǎn) PAGEREF _Toc409432598 h 4 HYPERLINK l _Toc409432599 1.3 編制依據(jù) PAGEREF _Toc409432599 h 5 HYPERLINK l _Toc409432600 1.4 施工
2、目標(biāo) PAGEREF _Toc409432600 h 5 HYPERLINK l _Toc409432601 第二章 施工部署 PAGEREF _Toc409432601 h 5 HYPERLINK l _Toc409432602 2.1 施工技術(shù)路線(xiàn) PAGEREF _Toc409432602 h 5 HYPERLINK l _Toc409432603 2.2構(gòu)件分段 PAGEREF _Toc409432603 h 5 HYPERLINK l _Toc409432604 2.3 現(xiàn)場(chǎng)吊裝機(jī)械 PAGEREF _Toc409432604 h 8 HYPERLINK l _Toc40943260
3、5 2.4人員組織架構(gòu)及勞動(dòng)力安排 PAGEREF _Toc409432605 h 10 HYPERLINK l _Toc409432606 2.5擬投入的機(jī)械、設(shè)備計(jì)劃 PAGEREF _Toc409432606 h 10 HYPERLINK l _Toc409432607 2.5.1 現(xiàn)場(chǎng)安裝起重機(jī)械配備計(jì)劃 PAGEREF _Toc409432607 h 10 HYPERLINK l _Toc409432608 2.5.2 現(xiàn)場(chǎng)安裝測(cè)量工具配備計(jì)劃 PAGEREF _Toc409432608 h 10 HYPERLINK l _Toc409432609 2.5.3 現(xiàn)場(chǎng)安裝焊接設(shè)備配備計(jì)
4、劃 PAGEREF _Toc409432609 h 10 HYPERLINK l _Toc409432610 2.5.4 現(xiàn)場(chǎng)用電計(jì)算 PAGEREF _Toc409432610 h 11 HYPERLINK l _Toc409432611 第三章 鋼結(jié)構(gòu)運(yùn)輸 PAGEREF _Toc409432611 h 11 HYPERLINK l _Toc409432612 3.1構(gòu)件運(yùn)輸清單如下表: PAGEREF _Toc409432612 h 12 HYPERLINK l _Toc409432613 3.2運(yùn)輸路線(xiàn)實(shí)景圖 PAGEREF _Toc409432613 h 12 HYPERLINK l
5、 _Toc409432614 3.3運(yùn)輸分析如下: PAGEREF _Toc409432614 h 14 HYPERLINK l _Toc409432615 3.4安全技術(shù)措施 PAGEREF _Toc409432615 h 15 HYPERLINK l _Toc409432616 第四章 鋼箱梁現(xiàn)場(chǎng)安裝 PAGEREF _Toc409432616 h 15 HYPERLINK l _Toc409432617 4.1 施工準(zhǔn)備 PAGEREF _Toc409432617 h 15 HYPERLINK l _Toc409432618 4.2 構(gòu)件進(jìn)場(chǎng)驗(yàn)收 PAGEREF _Toc40943261
6、8 h 15 HYPERLINK l _Toc409432619 4.3臨時(shí)支撐立設(shè)位置示意圖 PAGEREF _Toc409432619 h 15 HYPERLINK l _Toc409432620 4.4 現(xiàn)場(chǎng)狀況及施工要求 PAGEREF _Toc409432620 h 17 HYPERLINK l _Toc409432621 4.4.1現(xiàn)場(chǎng)鋼結(jié)構(gòu)分布圖 PAGEREF _Toc409432621 h 17 HYPERLINK l _Toc409432622 4.4.2現(xiàn)場(chǎng)運(yùn)輸通道圖 PAGEREF _Toc409432622 h 18 HYPERLINK l _Toc409432623
7、 4.4.3現(xiàn)場(chǎng)硬化區(qū)域圖: PAGEREF _Toc409432623 h 18 HYPERLINK l _Toc409432624 4.4.4現(xiàn)場(chǎng)鋼結(jié)構(gòu)安裝順序 PAGEREF _Toc409432624 h 18 HYPERLINK l _Toc409432625 4. 5鋼結(jié)構(gòu)吊裝 PAGEREF _Toc409432625 h 19 HYPERLINK l _Toc409432626 4.5.1履帶吊吊裝 PAGEREF _Toc409432626 h 19 HYPERLINK l _Toc409432627 4.5.2液壓提升吊裝 PAGEREF _Toc409432627 h 5
8、7 HYPERLINK l _Toc409432628 4.5.3液壓頂推施工 PAGEREF _Toc409432628 h 59 HYPERLINK l _Toc409432629 4.6鋼結(jié)構(gòu)拼裝胎架布置 PAGEREF _Toc409432629 h 65 HYPERLINK l _Toc409432630 4.7吊裝吊點(diǎn)設(shè)置 PAGEREF _Toc409432630 h 66 HYPERLINK l _Toc409432631 4.7.1 匝道鋼箱梁吊點(diǎn)設(shè)置 PAGEREF _Toc409432631 h 66 HYPERLINK l _Toc409432632 4.7.2 主線(xiàn)橋
9、鋼梁吊點(diǎn)設(shè)置 PAGEREF _Toc409432632 h 67 HYPERLINK l _Toc409432633 4.9測(cè)量 PAGEREF _Toc409432633 h 68 HYPERLINK l _Toc409432634 4.10鋼箱梁就位調(diào)整 PAGEREF _Toc409432634 h 68 HYPERLINK l _Toc409432635 4.11結(jié)構(gòu)卸載 PAGEREF _Toc409432635 h 69 HYPERLINK l _Toc409432636 4.12臨時(shí)支撐拆除 PAGEREF _Toc409432636 h 70 HYPERLINK l _Toc
10、409432637 第五章 鋼箱梁焊接 PAGEREF _Toc409432637 h 71 HYPERLINK l _Toc409432638 5.1 焊接概括 PAGEREF _Toc409432638 h 71 HYPERLINK l _Toc409432639 5.1.1 原材料 PAGEREF _Toc409432639 h 71 HYPERLINK l _Toc409432640 5.1.2 現(xiàn)場(chǎng)焊接主要工作內(nèi)容包括 PAGEREF _Toc409432640 h 71 HYPERLINK l _Toc409432641 5.1.3 現(xiàn)場(chǎng)焊接特點(diǎn) PAGEREF _Toc40943
11、2641 h 71 HYPERLINK l _Toc409432642 5.1.4 鋼箱梁出廠技術(shù)要求 PAGEREF _Toc409432642 h 71 HYPERLINK l _Toc409432643 5.2 主要的焊接施工方法和技術(shù)措施 PAGEREF _Toc409432643 h 71 HYPERLINK l _Toc409432644 5.2.1 焊接工藝評(píng)定 PAGEREF _Toc409432644 h 71 HYPERLINK l _Toc409432645 5.2.2 定位焊 PAGEREF _Toc409432645 h 71 HYPERLINK l _Toc4094
12、32646 5.2.3 焊前檢查 PAGEREF _Toc409432646 h 72 HYPERLINK l _Toc409432647 5.2.4 焊接方法 PAGEREF _Toc409432647 h 72 HYPERLINK l _Toc409432648 5.2.5 焊接順序及焊接要求 PAGEREF _Toc409432648 h 72 HYPERLINK l _Toc409432649 5.2.6 多層多道焊 PAGEREF _Toc409432649 h 72 HYPERLINK l _Toc409432650 5.2.7 焊后打磨 PAGEREF _Toc409432650
13、 h 73 HYPERLINK l _Toc409432651 5.2.8 焊接檢驗(yàn) PAGEREF _Toc409432651 h 73 HYPERLINK l _Toc409432652 5.5.9 焊縫返修 PAGEREF _Toc409432652 h 73 HYPERLINK l _Toc409432653 5.2.10 嚴(yán)格焊接工藝紀(jì)律 PAGEREF _Toc409432653 h 73 HYPERLINK l _Toc409432654 第六章 相關(guān)驗(yàn)算 PAGEREF _Toc409432654 h 74 HYPERLINK l _Toc409432655 6.1格構(gòu)柱的驗(yàn)算
14、 PAGEREF _Toc409432655 h 74 HYPERLINK l _Toc409432656 6.2吊籠的驗(yàn)算 PAGEREF _Toc409432656 h 75 HYPERLINK l _Toc409432657 6.3操作平臺(tái)的驗(yàn)算 PAGEREF _Toc409432657 h 76 HYPERLINK l _Toc409432658 6.4吊裝鋼絲繩的驗(yàn)算 PAGEREF _Toc409432658 h 76 HYPERLINK l _Toc409432659 6.5吊裝吊耳的驗(yàn)算 PAGEREF _Toc409432659 h 77 HYPERLINK l _Toc4
15、09432660 6.6臨時(shí)支撐基礎(chǔ)驗(yàn)算 PAGEREF _Toc409432660 h 78 HYPERLINK l _Toc409432661 6.7吊車(chē)站位驗(yàn)算 PAGEREF _Toc409432661 h 81 HYPERLINK l _Toc409432662 第七章 施工過(guò)程危險(xiǎn)源及控制措施 PAGEREF _Toc409432662 h 82 HYPERLINK l _Toc409432663 第八章 現(xiàn)場(chǎng)質(zhì)量保證措施 PAGEREF _Toc409432663 h 84 HYPERLINK l _Toc409432664 8.1 質(zhì)量保證體系 PAGEREF _Toc4094
16、32664 h 84 HYPERLINK l _Toc409432665 8.2 質(zhì)量控制措施要點(diǎn) PAGEREF _Toc409432665 h 84 HYPERLINK l _Toc409432666 8.3 質(zhì)量保證措施 PAGEREF _Toc409432666 h 84 HYPERLINK l _Toc409432667 第九章 現(xiàn)場(chǎng)施工安全措施 PAGEREF _Toc409432667 h 86 HYPERLINK l _Toc409432668 9.1安全施工目標(biāo) PAGEREF _Toc409432668 h 86 HYPERLINK l _Toc409432669 9.2
17、安全施工組織體系 PAGEREF _Toc409432669 h 86 HYPERLINK l _Toc409432670 9.3 安全施工管理體系 PAGEREF _Toc409432670 h 86 HYPERLINK l _Toc409432671 9.4 安全管理控制 PAGEREF _Toc409432671 h 86 HYPERLINK l _Toc409432672 9.5 安全施工管理措施 PAGEREF _Toc409432672 h 87 HYPERLINK l _Toc409432673 9.6 安全注意事項(xiàng) PAGEREF _Toc409432673 h 88 HYPE
18、RLINK l _Toc409432674 9.7 安全檢查 PAGEREF _Toc409432674 h 88 HYPERLINK l _Toc409432675 9.8 焊接、切割防火措施 PAGEREF _Toc409432675 h 89 HYPERLINK l _Toc409432676 9.9防止高空墜落措施 PAGEREF _Toc409432676 h 89 HYPERLINK l _Toc409432677 9.10 防止高空落物傷人措施 PAGEREF _Toc409432677 h 89 HYPERLINK l _Toc409432678 9.11 施工安全生產(chǎn)保證措施
19、 PAGEREF _Toc409432678 h 90 HYPERLINK l _Toc409432679 9.12 防止觸電、氣瓶爆炸措施 PAGEREF _Toc409432679 h 92 HYPERLINK l _Toc409432680 9.13 登高措施 PAGEREF _Toc409432680 h 93 HYPERLINK l _Toc409432681 9.14 其他安全措施 PAGEREF _Toc409432681 h 93 HYPERLINK l _Toc409432682 9.15 季節(jié)施工 PAGEREF _Toc409432682 h 93 HYPERLINK l
20、 _Toc409432683 9.16本工程的安全重點(diǎn)及控制方法 PAGEREF _Toc409432683 h 93 HYPERLINK l _Toc409432684 9.17 吊車(chē)支腿或履帶的支設(shè)及提升架底部設(shè)置 PAGEREF _Toc409432684 h 94 HYPERLINK l _Toc409432685 9.18 安裝、焊接操作平臺(tái) PAGEREF _Toc409432685 h 94 HYPERLINK l _Toc409432686 9. 19防風(fēng)、防雨及安全措施 PAGEREF _Toc409432686 h 94 HYPERLINK l _Toc409432687
21、9.20 現(xiàn)場(chǎng)施工交通組織 PAGEREF _Toc409432687 h 94 HYPERLINK l _Toc409432688 第十章 文明施工及環(huán)境保護(hù)措施 PAGEREF _Toc409432688 h 96 HYPERLINK l _Toc409432689 10.1 文明施工及環(huán)境保護(hù)保證體系 PAGEREF _Toc409432689 h 96 HYPERLINK l _Toc409432690 10.2 文明施工保證措施 PAGEREF _Toc409432690 h 96 HYPERLINK l _Toc409432691 10.3 環(huán)境保護(hù)措施 PAGEREF _Toc4
22、09432691 h 96 HYPERLINK l _Toc409432692 10.4 施工規(guī)范化 PAGEREF _Toc409432692 h 97 HYPERLINK l _Toc409432693 10.5責(zé)任區(qū)模塊化 PAGEREF _Toc409432693 h 97 HYPERLINK l _Toc409432694 10.6檢查評(píng)比制度化 PAGEREF _Toc409432694 h 97 HYPERLINK l _Toc409432695 10.7 重獎(jiǎng)重罰經(jīng)濟(jì)化 PAGEREF _Toc409432695 h 97 HYPERLINK l _Toc409432696 第
23、十一章 應(yīng)急預(yù)案 PAGEREF _Toc409432696 h 98 HYPERLINK l _Toc409432697 11.1組織機(jī)構(gòu) PAGEREF _Toc409432697 h 98 HYPERLINK l _Toc409432698 11.2具體應(yīng)急預(yù)案 PAGEREF _Toc409432698 h 98 HYPERLINK l _Toc409432699 第十二章 季節(jié)性施工措施 PAGEREF _Toc409432699 h 101 HYPERLINK l _Toc409432700 12.1 本工程季節(jié)性施工特點(diǎn) PAGEREF _Toc409432700 h 101 H
24、YPERLINK l _Toc409432701 12.2 雨季施工保障措施 PAGEREF _Toc409432701 h 101 HYPERLINK l _Toc409432702 12.3 防雷施工保障措施 PAGEREF _Toc409432702 h 101 HYPERLINK l _Toc409432703 12.4 臺(tái)風(fēng)期施工保障措施 PAGEREF _Toc409432703 h 102 HYPERLINK l _Toc409432704 12.5 冬季施工保障措施 PAGEREF _Toc409432704 h 102 HYPERLINK l _Toc409432705 12
25、.5.1管理與準(zhǔn)備 PAGEREF _Toc409432705 h 102 HYPERLINK l _Toc409432706 12.5.2保障措施 PAGEREF _Toc409432706 h 102 HYPERLINK l _Toc409432707 第十三章 進(jìn)度計(jì)劃 PAGEREF _Toc409432707 h 103第一章 工程概述1.1 工程簡(jiǎn)介工程名稱(chēng):寧波市東苑立交快速化改造一期工程工程地點(diǎn):世紀(jì)大道與環(huán)城南路叉口工程范圍:主線(xiàn)橋:PMZ12PMZ13、PMZ13PMZ14、PMZ22PMZ23、PMZ24PMZ25、PMZ25PMZ26鋼橋梁的安裝。匝道:PNW06PNW
26、07、PNE11PNE13、PNE13PNE16、PNE01PNE03、PEN10PEN11、PNS01PNS03、PNS07PNS09、PWN19PWN22、PSN03PSN05鋼橋梁的安裝。人非橋:Prf08Prf13、Prf13Prf15、Prf15Prf17鋼橋梁的安裝。工程介紹:東苑立交快速化改造一期工程為在現(xiàn)狀東苑立交上,新建四層樞紐互通立交,新建互通立交與現(xiàn)狀東苑立交構(gòu)成六層上下分離、功能獨(dú)立的樞紐型互通立交。鋼箱梁分項(xiàng)工程分布于東苑立交快速化改造一期工程的主線(xiàn)和匝道范圍,主線(xiàn)鋼箱梁跨徑在4255m,匝道鋼箱梁跨徑在3438m之間。匝道2匝道3效果圖如下:匝道1主線(xiàn)橋3匝道4匝道
27、5匝道7匝道6匝道8主線(xiàn)橋2主線(xiàn)橋1根據(jù)設(shè)計(jì)圖紙,主線(xiàn)橋?yàn)榀B合梁,每跨有6榀鋼箱梁組成,匝道為單榀鋼箱梁構(gòu)成。主線(xiàn)橋疊合梁剖面圖如下圖:匝道鋼箱梁截面示意圖如下: 1.2 施工特點(diǎn)和難點(diǎn)本工程施工特點(diǎn):1、主線(xiàn)橋每跨為六榀鋼箱梁組成疊合梁;2、匝道及人非橋?yàn)榄h(huán)形鋼箱梁;3、橋上橋是本工程的一個(gè)顯著特點(diǎn)。本工程施工重難點(diǎn):1、鋼箱梁?jiǎn)慰缈鐝介L(zhǎng)、重量大、安裝高度高,施工有一定的難度;2、部分鋼箱梁安裝位置下方有原有橋梁,臨時(shí)支撐需搭設(shè)在原有橋梁上,保證原有橋梁的安全是施工中的一個(gè)重點(diǎn);3、由于施工條件復(fù)雜,測(cè)量定位難度大。5、焊接要求高。1.3 編制依據(jù)公路橋涵施工技術(shù)規(guī)范JFG/T F50-20
28、11公路工程質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)JTG F80/1-2004低合金高強(qiáng)度結(jié)構(gòu)鋼GB/T1591-2008鐵路鋼橋制作規(guī)范TB10212-2009鐵路特大橋質(zhì)量評(píng)定驗(yàn)收標(biāo)準(zhǔn)TBJ416-87金屬熔化焊焊接接頭射線(xiàn)照相GB/T3323-2005鋼焊縫手工超聲波探傷方法和探傷結(jié)構(gòu)的分級(jí)GB11345-89氣焊、焊條電弧焊、氣體保護(hù)焊和高性能束焊的推薦坡口GB/T985.1-2008埋弧焊的推薦坡口GB/T985.2-2008涂裝前鋼材表面銹蝕等級(jí)和除銹等級(jí)GB8923-98公路橋梁鋼結(jié)構(gòu)防腐涂裝技術(shù)條件JT/T722-2008表面粗糙度參數(shù)及其數(shù)值GB1031-95焊縫磁粉檢驗(yàn)方法和缺陷磁痕的分級(jí)JB/
29、T6061-92城市橋梁工程施工與質(zhì)量驗(yàn)收規(guī)范CJJ 2-2008鋼結(jié)構(gòu)工程施工規(guī)范GB50755-2012起重吊裝常用數(shù)據(jù)手冊(cè)2002年2月第一版起重機(jī)用鋼絲繩檢驗(yàn)和報(bào)廢實(shí)用規(guī)范建筑施工起重吊裝安全技術(shù)規(guī)范(JGJ276-2012)建筑施工起機(jī)械使用安全技術(shù)規(guī)程(JGJ33-2012)設(shè)計(jì)院施工圖、技術(shù)交底及來(lái)往文件等公司以往類(lèi)似工程施工經(jīng)驗(yàn)及公司的規(guī)章制度和有關(guān)工程技術(shù)、質(zhì)量安全、生產(chǎn)管理文件等當(dāng)?shù)赜嘘P(guān)工程施工和技術(shù)管理規(guī)定1.4 施工目標(biāo)嚴(yán)格履行合同和招標(biāo)文件要求,嚴(yán)格遵守設(shè)計(jì)要求和相關(guān)技術(shù)規(guī)范,使各項(xiàng)指標(biāo)達(dá)到規(guī)定,讓業(yè)主放心、讓監(jiān)理工程師滿(mǎn)意。第二章 施工部署2.1 施工技術(shù)路線(xiàn)本工程
30、鋼結(jié)構(gòu)部分可分四部分進(jìn)行施工,第一部分包括主線(xiàn)橋1、匝道1和匝道2三部分;第二部分包括主線(xiàn)橋2、主線(xiàn)橋3及匝道4三部分;第三部分包括匝道3、匝道5、匝道6、匝道7和匝道8五部分;第四部分為人非橋施工。結(jié)合本工程的特點(diǎn),減少高空順橋方向焊縫的焊接,匝道18和主線(xiàn)橋1及主線(xiàn)橋3的構(gòu)件在加工廠分段制作,現(xiàn)場(chǎng)100噸履帶吊拼裝,350噸履帶吊加超起進(jìn)行吊裝施工;主線(xiàn)橋2采用加工廠分段制作,現(xiàn)場(chǎng)拼裝,然后用液壓提升進(jìn)行吊裝;人非橋在加工廠分段制作,在Prf09Prf12之間進(jìn)行拼裝,拼裝采用100噸履帶吊,然后在此處搭設(shè)操作平臺(tái),在平臺(tái)上安裝滑移軌道和頂推器,用350噸履帶吊把構(gòu)件放置在操作平臺(tái)滑移軌道
31、上,把構(gòu)件頂推到安裝位置。臨時(shí)支撐采用50噸汽車(chē)吊進(jìn)行配合施工,拼裝胎架采用25噸汽車(chē)吊進(jìn)行配合。2.2構(gòu)件分段結(jié)合設(shè)計(jì)對(duì)鋼結(jié)構(gòu)分段(縱向分縫距離柱墩支座中心不小于5米,距離橫隔板處不小于0.5米,距離橫向加勁板不小于0.25米,分縫處、腹板、頂板、底板分縫應(yīng)錯(cuò)開(kāi)0.25米,不得在同一位置分縫;頂板橫向分縫距離挑臂根部距離不小于1米,距離支座中心距離不小于2米,分縫處,腹板、頂板底板分縫處應(yīng)錯(cuò)開(kāi)0.1米,不得在同一位置分縫;端橫梁范圍邊跨兩端5米范圍,中橫梁中墩中心兩側(cè)各2.5米范圍不得進(jìn)行橫向分段)的要求,以及構(gòu)件運(yùn)輸情況,結(jié)合現(xiàn)場(chǎng)條件,對(duì)鋼橋梁進(jìn)行分段,具體分段如:主線(xiàn)橋1(Pmz12Pm
32、z13)分段:主線(xiàn)橋1(Pmz13Pmz14)分段:匝道1(Pnw06Pnw07)分段:匝道2(Pns01Pns03)分段:匝道3(Pen10Pen11)分段:匝道4(Pne11Pne13)分段:匝道4(Pne13Pne16)分段:主線(xiàn)橋2(Pmz22Pmz23):主線(xiàn)橋2(Pmz24Pmz26):匝道5(Pns07Pns09)匝道7(Pne01Pne03)匝道6(Pwn19Pwn22)匝道8(Psn03Psn05)2.3 現(xiàn)場(chǎng)吊裝機(jī)械各吊車(chē)性能如下表:50t汽車(chē)吊性能表100t履帶吊性能表350噸履帶吊加超起性能表重型主臂 超起桅桿27m 超起配重半徑15m 后配重85t 車(chē)身壓重50t(超
33、起配重200t時(shí)車(chē)身壓重30t)主臂長(zhǎng)度3036幅度超起配重超起配重幅度0501001502000501001502006204.228267192.2280.9300.0187.4266.1300.078171.7255.7300.0167.7235.8300.0300.089155.1214.2294.2294.2151.6206.4281.1292.5910141.2205.8231.1291.6138.2190.2220.6290.01011129.5190209.7289.5126.9180.5211.5287.81112119.5174.1195.2251.3287.7117.21
34、62.8201.0239.0285.81214103.4148.3184.1241.2265.0101.3141.4170.5228.0272.0141685.9128167.4210.6230.085.7127.5161.0204.9245.4161872.8111.2151.1188.4202.072.5109.4150.2184.0219.2182062.998.5135.1166.8178.062.697.4132.8165.9193.9202255.288.3121.8149.8159.054.887.1121.0147.1173.722244980.7106.8142.0142.0
35、48.678.7110.3128.7155.5242643.972.999.8126.0126.043.571.4102.4118.8140.4262839.666.193.3107.0107.039.265.991.5113.2127.3283035.660.681.5110.2115.1303232.455.774.8101.0104.0323429.751.373.289.989.934重型主臂 超起桅桿27m 超起配重半徑15m 后配重85t 車(chē)身壓重50t(超起配重200t時(shí)車(chē)身壓重30t)主臂長(zhǎng)度4248幅度超起配重超起配重幅度050100150200050100150200816
36、4219.1288.1159.8210.1268.489148.5199.6266.4285.7144.9201.2266.0266.0910135.6189.1211.4283.3132.2179.9220.8263.81011124.6174.4205.1281.1121.5165194.3261.61112115.1158.4197.3235.5279.4112.4154.3184.8257.0121499.7143.8180.4235.9267.097.4135.1156.7212.3255.8141684.6126.1158.1201.7239.083.0120.1135.1179.
37、3243.4161872.8109.8142.3177.0215.070.9108139.6174.0220.2182062.897.3127.8156.0197.061.595.1127.9164.1200.020225587.1116.2151.5182.053.685.2116.5145.9182.8222448.878.4107.7134.0162.047.477.1105.8132.5166.7242643.071.697.6124.2148.042.070.695.3123.8150.5262839.465.590.3113.3135.038.364.687.9113.4139.4
38、283035.760.980.5110.2123.034.859.481.8103.8130.3303232.555.877.796.7112.031.75574.898.5119.2323429.851.471.292.3102.029.349.969.093.2110.1343627.346.864.487.493.026.945.764.088.3102.0363825.242.961.483.083.024.741.959.681.393.9384022.839.156.176.286.940422136.853.372.772.742重型主臂 超起桅桿27m 超起配重半徑15m 后配
39、重85t 車(chē)身壓重50t(超起配重200t時(shí)車(chē)身壓重30t)主臂長(zhǎng)度5460幅度超起配重超起配重幅度0501001502000501001502009142.7190.3248.5139.4202.9211.1910130.5183.6245.4245.4127.5170.1209.11011120166.3212.2242.4117.4162.9207.1207.11112111149.6177.2240.4108.6157.2205.0205.0121496.3135.2163.0217.1236.394.2130.4153.6202.0141682.0120.1140.9183.9232
40、.380.1118158.3199.0199.0161870.1109.2129.7164.4214.168.8105.9132.4148.5195.9182060.994.4126.0163.2197.059.792.3125.8153.0190.9202253.184.2115.8143.6181.852.482.8114.1141.4179.8222446.976.3105.0130.9165.646.074.8104.6127.2165.6242641.669.695.7120.3151.540.868.395.3116.9151.5262837.963.887.7111.2139.4
41、37.262.687.3108.1139.4283034.458.980.5103.7128.333.757.880.1100.9128.3303231.453.874.197.6118.230.753.474.294.0119.2323428.749.368.492.3109.128.048.368.888.0111.1343626.345.163.786.6102.026.044.264.282.4104.0363824.541.359.081.193.923.840.659.478.996.0384022.638.655.576.088.921.937.955.973.890.94044
42、19.234.150.167.577.818.533.449.167.079.8444816.330.144.360.366.715.829.543.260.069.7485213.426.138.854.160.6525611.323.335.047.451.5562.4人員組織架構(gòu)及勞動(dòng)力安排本項(xiàng)目人員組織架構(gòu)如下所示: 擬投入的現(xiàn)場(chǎng)勞動(dòng)力計(jì)劃工種人數(shù)備注工種人數(shù)備注普工20質(zhì)量安全3焊工12測(cè)量員2輔助工4起重工2合計(jì)412.5擬投入的機(jī)械、設(shè)備計(jì)劃2.5.1 現(xiàn)場(chǎng)安裝起重機(jī)械配備計(jì)劃序號(hào)機(jī)械設(shè)備型號(hào)規(guī)格數(shù)量用途備注1鋼絲繩24mm6m (637+1)4根臨時(shí)支撐吊裝抗拉強(qiáng)度1550MP
43、a2鋼絲繩100mm12m(661+1)8根鋼箱梁吊裝抗拉強(qiáng)度1570MPa鋼絲繩66mm8m (637+1)8根鋼箱梁吊裝抗拉強(qiáng)度1570MPa卸扣30t高強(qiáng)8個(gè)鋼箱梁吊裝卸扣50t高強(qiáng)8個(gè)鋼箱梁吊裝3卸扣80t高強(qiáng)8個(gè)鋼箱梁吊裝2.5.2 現(xiàn)場(chǎng)安裝測(cè)量工具配備計(jì)劃序號(hào)機(jī)械設(shè)備型號(hào)規(guī)格數(shù)量國(guó)別產(chǎn)地備注1全站儀1中國(guó)2經(jīng)緯儀1中國(guó)2水準(zhǔn)儀2中國(guó)3塔尺5m2中國(guó)2.5.3 現(xiàn)場(chǎng)安裝焊接設(shè)備配備計(jì)劃序號(hào)機(jī)械設(shè)備型號(hào)規(guī)格數(shù)量國(guó)別產(chǎn)地備注1CO2氣體保護(hù)焊機(jī)12中國(guó)焊接2直流焊機(jī)4中國(guó)焊接、氣刨3空氣壓縮機(jī)1中國(guó)碳弧氣刨4割炬5中國(guó)5角向砂輪機(jī)5中國(guó)6焊條保溫桶10中國(guó)7碳弧氣刨槍5中國(guó)8焊材烘箱1中
44、國(guó)9小車(chē)式自動(dòng)埋弧焊機(jī)2中國(guó)注: 1、施工時(shí)機(jī)具型號(hào)將根據(jù)實(shí)際情況進(jìn)行相應(yīng)的調(diào)整,但機(jī)具的施工能力不變;2、本表為主要施工機(jī)械設(shè)備,施工時(shí)不限于此。2.5.4 現(xiàn)場(chǎng)用電計(jì)算現(xiàn)場(chǎng)施工主要涉及到箱梁的安裝及焊接,所使用的用電設(shè)備包括電焊機(jī)、空壓機(jī)、磨光機(jī)、碳弧氣刨,同時(shí)考慮夜間施工照明等需要。本項(xiàng)目電源為總包單位提供的二級(jí)電箱。本項(xiàng)目擬投入用電設(shè)備如下:序號(hào)設(shè)備名稱(chēng)規(guī)格(型號(hào))數(shù)量功率(KW)備注1空氣壓縮機(jī)1m32302磨光機(jī)15303二氧化碳保護(hù)焊電焊機(jī)184504直流焊機(jī)101005碳弧氣刨2306碘鎢燈10001010抽風(fēng)機(jī)10150烘干箱1307其它小型工機(jī)具100P=1.1(P10.6
45、+P20.7+P31.0+P41.0) =1.1(2700.6+5500.7+101.0+1001.0)620KW其中: P1為電動(dòng)機(jī)總功率 P2為電焊機(jī)總功率P3為室外照明總功率 P4為其他小型電動(dòng)工機(jī)具總功率第三章 鋼結(jié)構(gòu)運(yùn)輸本工程鋼構(gòu)件采用公路運(yùn)輸為主,在構(gòu)件發(fā)運(yùn)前,制訂切實(shí)可行的運(yùn)輸方式和運(yùn)輸路線(xiàn),并選定備用的運(yùn)輸路線(xiàn)。根據(jù)工程進(jìn)度的需要,構(gòu)件原則上將按運(yùn)輸計(jì)劃,分批、分節(jié)地進(jìn)行。如果現(xiàn)場(chǎng)安裝計(jì)劃變更,必須事先發(fā)出書(shū)面通知,運(yùn)輸計(jì)劃將根據(jù)實(shí)際情況作相應(yīng)調(diào)整。我們將預(yù)先根據(jù)每批次的構(gòu)件特點(diǎn)和工程進(jìn)度,對(duì)于每批次的構(gòu)件都將進(jìn)行專(zhuān)門(mén)的統(tǒng)籌安排,對(duì)構(gòu)件的運(yùn)輸方式、運(yùn)輸?shù)缆返茸鞒隹b密的計(jì)劃,并安
46、排足夠的運(yùn)輸工具裝運(yùn)大型構(gòu)件,安排好構(gòu)件運(yùn)輸中所需的相應(yīng)配套措施。另外,對(duì)尺寸較大的構(gòu)件將制作專(zhuān)門(mén)的運(yùn)輸擱置件。運(yùn)輸操作之前,本公司將責(zé)令承運(yùn)方對(duì)投入運(yùn)營(yíng)的每一輛車(chē)輛進(jìn)行嚴(yán)格的安全檢查和正規(guī)的保養(yǎng)措施;并要求承運(yùn)方提交運(yùn)營(yíng)車(chē)輛的準(zhǔn)運(yùn)報(bào)告,以保證車(chē)輛能準(zhǔn)時(shí)、安全地到達(dá)目的地。將在每批構(gòu)件、在每個(gè)構(gòu)件交接點(diǎn)上派專(zhuān)人負(fù)責(zé),做好貨物裝車(chē)、交接等工作。與氣象部門(mén)保持緊密聯(lián)系,了解氣象信息,尤其是夏季臺(tái)風(fēng)季節(jié)。提前掌握臺(tái)風(fēng)動(dòng)態(tài),及時(shí)調(diào)整運(yùn)輸路線(xiàn)。遇到可能受臺(tái)風(fēng)影響時(shí),選擇應(yīng)急路線(xiàn)運(yùn)輸,保證構(gòu)件及時(shí)到達(dá)現(xiàn)場(chǎng),避免受臺(tái)風(fēng)封路影響而造成運(yùn)輸滯后。運(yùn)輸過(guò)程中成品保護(hù)措施構(gòu)件與構(gòu)件間必須放置一定的墊木、橡膠墊等緩沖
47、物,防止運(yùn)輸過(guò)程中構(gòu)件因碰撞而損壞。散件按同類(lèi)型集中堆放,并用鋼框架、墊木和鋼絲繩進(jìn)行綁扎固定,桿件與綁扎用鋼絲繩之間放置橡膠墊之類(lèi)的緩沖物。在整個(gè)運(yùn)輸過(guò)程中為避免涂層損壞,在構(gòu)件綁扎或固定處用軟性材料襯墊保護(hù)。根據(jù)本工程構(gòu)件截面形式及尺寸,現(xiàn)定于由寧波鄞州區(qū)濱海投資創(chuàng)業(yè)中心(臨春路)運(yùn)輸大件貨物至寧波市東苑立交項(xiàng)目工地。3.1構(gòu)件運(yùn)輸清單如下表:序號(hào)總名稱(chēng)名稱(chēng)構(gòu)件號(hào)高度寬度長(zhǎng)度構(gòu)件數(shù)量構(gòu)件重量1東苑12-13橋體6L I 12650283018230135898.067 2東苑12-13橋體5L I 12650283018230138985.252 3東苑12-13橋體4L I 126502
48、83018230138885.310 4東苑12-13橋體3L I 12650283018230138785.980 5東苑12-13橋體2L I 12650283018230138684.668 6東苑12-13橋體1L I 12650283018230135440.001 7東苑12-13橋體6L I 22650283019610136063.089 8東苑12-13橋體5L I 22650283019610140837.637 9東苑12-13橋體4L I 22650283019610140837.637 10東苑12-13橋體3L I 22650283019610140837.637
49、11東苑12-13橋體2L I 22650283019610140837.637 12東苑12-13橋體1L I 22650283019610136072.132 13東苑12-13橋體6L I 32650283018230135858.046 14東苑12-13橋體5L I 32650283018230138943.000 15東苑12-13橋體4L I 32650283018230138842.645 16東苑12-13橋體3L I 32650283018230138747.284 17東苑12-13橋體2L I 32650283018230138642.453 18東苑12-13橋體1L
50、 I 32650283018230135398.566 19東苑13-14橋體6L II 12140283015690128457.015 20東苑13-14橋體5L II 12140283015690130711.410 21東苑13-14橋體4L II 12140283015690130647.945 22東苑13-14橋體3L II 12140283015690130583.397 23東苑13-14橋體2L II 12140283015690130514.379 24東苑13-14橋體1L II 12140283015690128154.911 25東苑13-14橋體6L II 221
51、40283016610126719.974 26東苑13-14橋體5L II 22140283016610130146.853 27東苑13-14橋體4L II 22140283016610130146.853 28東苑13-14橋體3L II 22140283016610130146.853 29東苑13-14橋體2L II 22140283016610130146.853 30東苑13-14橋體1L II 22140283016610126719.974 31東苑13-14橋體6L II 32140283015630128320.281 32東苑13-14橋體5L II 321402830
52685 33東苑13-14橋體4L II 32140283015630130573.252 34東苑13-14橋體3L II 32140283015630130544.229 35東苑13-14橋體2L II 32140283015630130515.443 36東苑13-14橋體1L II 32140283015630128186.190 3.2運(yùn)輸路線(xiàn)實(shí)景圖我公司及運(yùn)輸公司人員對(duì)現(xiàn)場(chǎng)路線(xiàn)進(jìn)行了考察,行駛路線(xiàn)具體情況如下:1) 從起點(diǎn)向正西方向出發(fā),沿臨春路行駛900米,在臨春橋左轉(zhuǎn)進(jìn)入沿海中線(xiàn)2 沿沿海中線(xiàn)行駛7.7公里,直行進(jìn)入寶瞻線(xiàn) 3 沿寶瞻線(xiàn)行駛14.6公里
53、,左轉(zhuǎn)上匝道 4) 沿匝道行駛930米,過(guò)育王天童互通約700米后直行進(jìn)入甬臺(tái)溫高速公路5) 沿甬臺(tái)溫高速公路行駛12.2公里,朝臺(tái)州/金華/寧波東/世紀(jì)大道方向,稍向右轉(zhuǎn)6) 繼續(xù)沿甬臺(tái)溫高速公路行駛210米,過(guò)寧波東樞紐約470米后直行7) 繼續(xù)沿甬臺(tái)溫高速公路行駛140米,直行8) 繼續(xù)沿甬臺(tái)溫高速公路行駛40米,稍向右轉(zhuǎn)進(jìn)入東苑立交橋3.3運(yùn)輸分析如下:根據(jù)所考察貨物的尺寸與重量決定使用6軸及以上17.5米抽拉板車(chē)車(chē)輛尺寸(長(zhǎng)17.5米,高度低板1.2米,高板1.6米,寬度3米)構(gòu)件運(yùn)輸路線(xiàn)途徑4個(gè)隧道(限高5米,寬度雙向單車(chē)道),8座小橋(限軸距12噸)貨物長(zhǎng)寬高滿(mǎn)足運(yùn)載要求,重量選
54、擇6軸半掛車(chē),平均每軸不足8T,滿(mǎn)足運(yùn)輸要求。部分超限運(yùn)輸件,要求運(yùn)輸公司辦理相關(guān)通行手續(xù)。3.4安全技術(shù)措施1.通過(guò)隧道或道路狹窄的地方需前后左右查看,確保安全后方可通行。2.所需車(chē)輛,充分考慮了運(yùn)輸路線(xiàn)上的各種不利因素,車(chē)輛承載能力、動(dòng)力性能、通過(guò)高空障礙能力等都進(jìn)行了充分論證,從運(yùn)輸設(shè)備上保證運(yùn)輸?shù)陌踩浴?.選派經(jīng)驗(yàn)豐富的運(yùn)輸司機(jī),執(zhí)行本次運(yùn)輸任務(wù),提高了運(yùn)輸駕駛質(zhì)量。同時(shí)為每輛車(chē)配備副駕駛,確保在運(yùn)行途中具有充足的人力,盡快處理?yè)Q胎等臨時(shí)車(chē)輛故障及臨時(shí)排障的工作。操作上,我公司將要求運(yùn)輸公司嚴(yán)格執(zhí)行操作程序,從貨物裝車(chē)、貨物車(chē)上固定、道路運(yùn)輸?shù)拳h(huán)節(jié)的入手加強(qiáng)對(duì)運(yùn)輸安全的管理和控制:車(chē)
55、輛檢驗(yàn):裝車(chē)前要對(duì)運(yùn)輸車(chē)輛進(jìn)行必要的檢驗(yàn),內(nèi)容包括發(fā)動(dòng)機(jī)工作狀況;油、水、電狀況;制動(dòng)性能;轉(zhuǎn)向系統(tǒng)性能等,確保車(chē)輛處于良好的技術(shù)狀態(tài)。裝車(chē):裝車(chē)時(shí)要保證貨物重心與車(chē)輛承載中心對(duì)稱(chēng),不能左右偏斜,避免車(chē)輛偏載,降低車(chē)輛側(cè)向傾覆的風(fēng)險(xiǎn),同時(shí)要調(diào)整貨物前后位置,保證設(shè)備全部位于有效載貨平臺(tái)上,使車(chē)輛各軸線(xiàn)受力符合要求,防止局部超載現(xiàn)象發(fā)生。設(shè)備固定:設(shè)備在車(chē)輛上要進(jìn)行有效固定,采用焊接擋塊、鋼絲繩捆綁等方式進(jìn)行,并在構(gòu)件與固定工具間做好防護(hù),避免油漆受損。運(yùn)行中嚴(yán)格控制運(yùn)行速度,便于司機(jī)有足夠的時(shí)間處理突發(fā)事件;車(chē)輛通過(guò)橋梁時(shí),應(yīng)居中行走,車(chē)速控制在40公里/小時(shí)以?xún)?nèi),橋梁上不換檔、不減速、不制動(dòng)
56、;車(chē)輛通過(guò)收費(fèi)站時(shí),副司機(jī)和協(xié)作工人應(yīng)在車(chē)下觀察,及時(shí)告知司機(jī)車(chē)輛所處的位置,避免車(chē)、貨刮碰收費(fèi)站設(shè)施;車(chē)輛通過(guò)立交橋等跨路空中障礙時(shí),副司機(jī)要加強(qiáng)檢查,必要時(shí)到車(chē)下指揮車(chē)輛通過(guò);在車(chē)輛最寬點(diǎn)和車(chē)位最末端,白天懸掛紅旗,夜間懸掛紅燈,警示過(guò)往車(chē)輛注意安全。車(chē)輛中途進(jìn)行換胎等臨時(shí)維修操作時(shí),必須在車(chē)輛前后各100米位置擺放警示牌,車(chē)輛附近設(shè)置保護(hù),確保停車(chē)時(shí)車(chē)輛、設(shè)備和人身安全。運(yùn)行途中吃飯、過(guò)夜休息,車(chē)輛必須停于安全地帶,防止其他車(chē)輛刮碰設(shè)備。遇到雨、雪、大風(fēng)等惡劣天氣,為保證貨物安全應(yīng)做好相應(yīng)的防護(hù)措施。積極配合沿途交通、交警工作人員的指揮。第四章 鋼箱梁現(xiàn)場(chǎng)安裝4.1 施工準(zhǔn)備4.1.1技
57、術(shù)準(zhǔn)備結(jié)合圖紙及現(xiàn)場(chǎng)安裝情況,由現(xiàn)場(chǎng)技術(shù)及測(cè)量人員,臨時(shí)支撐進(jìn)行檢查復(fù)測(cè),做好吊裝前的準(zhǔn)備工作,確保構(gòu)件的順利吊裝。4.1.2吊裝準(zhǔn)備由于起吊設(shè)備是大型吊車(chē),在吊裝前應(yīng)對(duì)吊車(chē)站位進(jìn)行確定,吊車(chē)站位處地基承載力進(jìn)行驗(yàn)算,吊車(chē)自身應(yīng)進(jìn)行保養(yǎng),吊車(chē)司機(jī)及指揮人員都應(yīng)持證上崗。4.1.3 道路協(xié)調(diào)準(zhǔn)備在鋼箱梁吊裝時(shí)間段內(nèi),對(duì)道路疏通及封路必須得到各單位的認(rèn)可,具備起吊條件,保證道路運(yùn)行安全。4.2 構(gòu)件進(jìn)場(chǎng)驗(yàn)收1)構(gòu)件進(jìn)場(chǎng)計(jì)劃依據(jù)現(xiàn)場(chǎng)鋼箱梁施工進(jìn)度計(jì)劃編制,鋼構(gòu)件應(yīng)嚴(yán)格按照構(gòu)件進(jìn)場(chǎng)計(jì)劃進(jìn)場(chǎng),以保證鋼箱梁施工的順利進(jìn)行。2)根據(jù)構(gòu)件計(jì)劃進(jìn)場(chǎng)時(shí)間,提前23天組織構(gòu)件進(jìn)場(chǎng)。構(gòu)件進(jìn)場(chǎng)后,先對(duì)構(gòu)件進(jìn)行自檢驗(yàn)收,
58、檢查運(yùn)輸過(guò)程構(gòu)件有無(wú)變形,外觀有無(wú)損壞,然后邀請(qǐng)總包、監(jiān)理共同驗(yàn)收。3)進(jìn)場(chǎng)構(gòu)件清單發(fā)出后現(xiàn)場(chǎng)管理人員應(yīng)及時(shí)與總包協(xié)調(diào)落實(shí)堆場(chǎng),保證構(gòu)件進(jìn)場(chǎng)前24小時(shí)有足夠的堆場(chǎng)使用。4)現(xiàn)場(chǎng)驗(yàn)收將嚴(yán)格按照設(shè)計(jì)、深化圖紙要求和國(guó)家相關(guān)道路橋梁驗(yàn)收規(guī)范,對(duì)構(gòu)件的質(zhì)量進(jìn)行檢查驗(yàn)收,并做好記錄。檢驗(yàn)用的所有計(jì)量檢測(cè)工具嚴(yán)格按規(guī)定統(tǒng)一定期送檢。5)每一批構(gòu)件都必須有構(gòu)件合格證明書(shū)。每一車(chē)構(gòu)件都必須有隨車(chē)構(gòu)件清單。構(gòu)件到場(chǎng)后,驗(yàn)收人員按隨車(chē)構(gòu)件清單核對(duì)所到構(gòu)件的數(shù)量及編號(hào),隨車(chē)逐件驗(yàn)收清點(diǎn)無(wú)誤后方可簽字確認(rèn)。如果發(fā)現(xiàn)問(wèn)題,及時(shí)通知加工車(chē)間進(jìn)行更換或補(bǔ)充構(gòu)件以保證現(xiàn)場(chǎng)需求。6)裝、卸貨時(shí)應(yīng)注意安全,防止事故發(fā)生。夜間卸車(chē)
59、要由充足的照明并對(duì)作業(yè)人員進(jìn)行專(zhuān)項(xiàng)安全交底。運(yùn)輸拖車(chē)司機(jī)將卡車(chē)停到指定位置后應(yīng)鎖好車(chē)門(mén),離開(kāi)卡車(chē)到安全地帶,不得隨意在施工現(xiàn)場(chǎng)走動(dòng)以保證安全。4.3臨時(shí)支撐立設(shè)位置示意圖匝道鋼箱梁吊裝單元高空對(duì)接口位置不在橋墩位置,需要設(shè)置臨時(shí)支撐。鋼箱梁梁底標(biāo)高為雙曲線(xiàn),具體高度需根據(jù)現(xiàn)場(chǎng)臨時(shí)支撐處實(shí)際標(biāo)高而定,臨時(shí)支撐布置如下所示:匝道2(Pns01Pns03):該處匝道順橋方向分成左中右三部分,垂直跨度方向分成五段。匝道4(Pne11Pne13)該部分匝道橋面寬度從約15500mm變化到約12100mm,考慮構(gòu)件的運(yùn)輸及現(xiàn)場(chǎng)的吊裝,該部分匝道順橋方向分成左中右三部分,垂直跨度方向分成三段。匝道4(Pne
60、13Pne16),該部分匝道橋面寬度從約12100mm變化到約8200mm,考慮構(gòu)件的運(yùn)輸及現(xiàn)場(chǎng)的吊裝,該部分匝道Pne13Pne14軸線(xiàn)中部分分段順橋方向分成左中右三部分,其余Pne13Pne16順橋方向分成左右兩部分,垂直跨度方向分成七段。匝道4(Pne13Pne16)匝道5(Pns07Pns09),該處匝道順橋方向分成左右兩部分,垂直跨度方向分成五段。 匝道7(Pne01Pne03),該處匝道順橋方向分成左右兩部分,垂直跨度方向分成五段。 匝道6(Pwn19Pwn22),該處匝道順橋方向分成左右兩部分,垂直跨度方向分成六段。匝道8(Psn03Psn05),該處匝道順橋方向分成左右兩部分,
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 勞務(wù)合同范例游戲軟件
- 南岸區(qū)物流合同范本
- oem酒定制合同范本
- 人員安全合同范本
- 動(dòng)物轉(zhuǎn)讓合同范本
- 農(nóng)戶(hù)土地托管合同范本
- 2025年安徽省建筑安全員《A證》考試題庫(kù)
- 鄉(xiāng)村振興背景下遼寧鄉(xiāng)村體育產(chǎn)業(yè)發(fā)展趨勢(shì)研究
- 600萬(wàn)裝修合同范本
- 2025江西省安全員考試題庫(kù)及答案
- GB/T 6003.2-2024試驗(yàn)篩技術(shù)要求和檢驗(yàn)第2部分:金屬穿孔板試驗(yàn)篩
- 2025年初中地理八年級(jí)上冊(cè)全冊(cè)重點(diǎn)知識(shí)點(diǎn)復(fù)習(xí)課件
- 人工智能大模型
- 高空作業(yè)車(chē)外墻施工方案
- 川教版信息技術(shù)五年級(jí)下冊(cè)全冊(cè)教學(xué)設(shè)計(jì)教案
- 重慶市江北區(qū)社區(qū)專(zhuān)職工作者招考聘用高頻500題難、易錯(cuò)點(diǎn)模擬試題附帶答案詳解
- 掩體構(gòu)筑與偽裝教學(xué)法教案
- 讓我們一起去追“星”!兩彈一星之核彈老人魏世杰課件高二下學(xué)期愛(ài)國(guó)主義教育主題班會(huì)
- 2024年日歷表電子版(帶農(nóng)歷-含周數(shù)-周一開(kāi)始-打印版)
- 2024年計(jì)算機(jī)組成原理期末考試試題及答案共五套
- DB32T-認(rèn)知障礙老年人康復(fù)訓(xùn)練服務(wù)規(guī)范編制說(shuō)明
評(píng)論
0/150
提交評(píng)論