不同專業(yè)課程模具設(shè)計(jì)_第1頁(yè)
全文預(yù)覽已結(jié)束

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、畢業(yè)設(shè)計(jì) graduation designTopic:Anchor flange performance test researchingFlange is a parts to makpe and pipeerconnected.Choose emulfor prere testing mediumExperimental Equipment1) hydraulic press2) Prere gaugemanual pumps (Manual type hydraulic pump)dynamic strain indicatorElectrical measuring steps1)

2、Determine the electrical measuringition, polishing (file, abrasive pr)2) Paste the strain gauge (cyanoacrylate adhesive, acetoneapp:addword:acetone,)3) The strain gauge and wire welding together (insulating t, multimeter-the straingauge betn the welding wire whether conducting, strain gauge betn spe

3、cimenwhether insulation)Linking the bridge and the strain indicatorAppd load: hydraulic press give it a 360t of axial prere, manual pump pre 15MPa Fluidernal prerere6) prerize 30 minutes to observe gauge prere, collect data, and observeddeformation and leak condition.Standard of a qualified workpiec

4、e:Gauge prere without fluctuation, flange no abnormal. And its deformation is small,after ref, workpieDimens unchanged.experimental procedureelectrical measuring method1. Put the Prere gauge (range 25MPa)and the manual pumps installedhehydraulic system, connected to the anchoring flange (container)

5、body.Installation complete, confirm the system without residual gas, step up to 10mpa check no leakage, and step up to 15 mpa, confirm on trial preleakage.re stable, no:UVOI (ROTM VTINOTM IUSVUTJ JOK JKYOMT GTJ IGRIRGZOUTVXK )UTYUROJGZK ZNK QTURKJMK 3GYZKX SURJ JKYOMT SKZNUJY GTJ YZKVY一: 6XU 6XUY_YO

6、Y GTJ *KZKXSOTGZOUT UL ZNK VXUY YINKSKY_YOY _YOY UL VGXZY ZNK YOZGHOROZ_ UL ZNK VTINOTM VXUY *KZKXSOTGZOUT UL ZNK VXUY YINKSK9INKSK 9OTMRK YZKV SUJKU VXUYOTM9INKSK (R9INKSK (ROTM VTINOTM VXUMXKYYOK JOKOTM VTINOTM IUSVUTJ JOK9INKSK 6XUJIZOUT KLLOIOKTI_ OY RU GTJ ZNK UXQVOKIK ISRGZOK KXXUX OY HOM :NK

7、JKZKXSOTGZOUT UL ZNK IKTZKX UL VXK 4KYZOTM 排樣 XK )GRIRGZKJ HR二:OTM LUXIK GTJ VTINOTM LUXIK ) 3URJ UKXGRR JKYOMT6TINOTM VTIN (ROTM JOK VTIN JOK 凸凹模 9ZXOVVRGZK 卸料板 6YN VRGZK ) ZNK YKRKIZ UL SURJ Z_VK 落料沖孔倒裝復(fù)合模 OTKX 倒置 )OZOUTOTM SUJK: 9ZXOV(條料) MOJT ,YZUV VOT ) -OJOTM JKOIK MOJZ MOJ YRKKK ) =UXQ VGXZ YOK IGRIRGZKJ )ZZOTM +JMK YOJKJ MGV 刃口雙面間隙 (ROTM KJMK IUSVZOTM(落料刃口計(jì)算) ) +RGYZOI KRKSKTZ : YVXOTM GTJ XHHKX ) :NK INUOIK UL KWOVSKTZ 4USOTGR VXKXK _YOY UL ZNK VXUY 分析零件的沖壓工藝性O(shè)TM LUXIK 沖壓力計(jì)算 )GRIRGZK ZNK HR H

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論