版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
/
ConstructionSchemeofReflectiveThermalInsulationCoatingforExteriorWallofThreeResidentialBuildings,TwoCommercialBuildingsandOneUndergroundGarageinSFGarden
catalogue
ChapterIProjectOverview1
ChapterIIiscompiledonthebasisof4
ChapterIVConstructionandDeploymentof5
ChapterVConstructionTechnologyofCeramicTileFacingReflectiveThermalInsulationCoating6
ChapterVIConstructionProgressPlan9
ChapterVIIResourceDemandPlan10
ChapterVIIIConstructionPreparationWorkPlan11
ChapterIXConstructionMeasuresPlan15
ChapterXSafetyGuaranteeMeasures19
Chapter11ConstructionCoordinationMeasures22
ChapterXIIMeasurestoEliminateCommonQualityFaults23
ChapterXIIIWarrantyMeasures24
ConstructionSchemeofReflectiveThermalInsulationCoatingforExteriorWallofThreeResidentialBuildings,TwoCommercialBuildingsandOneUndergroundGarageinSFGarden
ChapterIOverviewoftheProject
I.Generalsituationofbuildings
Engineeringdescription
Projectnamesof3residentialbuildings(self-numberedG-12,J-13,J-14)and2commercialbuildingsinSFGarden
Building(numberedGJ-4,GJ-5)and1basementproject
Constructionsite:ShiFengRoad,ShijingTown,BaiyunDistrict,XXCity
ConstructionunitXXCityJifengRealEstateDevelopmentXX
SupervisionunitXXYunxingconstructionprojectsupervisionXX
InvestigationunitXXCityUrbanPlanningSurveyandDesignInstitute
DesignunitXXXXBaiyunBuildingXXXX
ConstructionunitXXSouthConstructionGroupXX
3residentialbuildingsinSFGarden(self-numberedG-12(F-12),J-13(F-13),J-14(F-14)),commercial
Twobuildings(numberedGJ-4andGJ-5)andonebasementprojectarelocatedinShiFengRoad,ShijingTown,BaiyunDistrict,XXCity.
Itconsistsofanundergroundparkinggarage,twocommercialbuildingsandthreehigh-riseresidentialbuildings,withanareaof16,473㎡forconstructionbystages,withatotal
Thebuildingareais43,386㎡,ofwhichtheundergroundbuildingareais99,001㎡andtheabove-groundbuildingareais33,485.9㎡.
1floorunderground,15floorsaboveground,thebuildingcorniceelevationis47.1m,thebuildingcategoryisClassI,andthebuildingfireresistanceratingis
ClassI,thecivilairdefenseengineeringgradeisClass5,thestructuretypeisframeshearwallstructure,theseismicfortificationintensityis7degrees,andthedesignstandard.
Theheightof0.000isequivalenttotheabsoluteelevationof8.450,andthedesignedservicelifeis50years.
II.Generalsituationofstructure
ThedesigngradeofthefoundationofthisprojectisGradeA,thefoundationisCMcompositefoundation,thefoundationispileraft,andthestructuretypeisframeshear.
Thewallstructurehasaseismicfortificationintensityof7degrees,andthesafetylevelofthebuildingstructureisGradeII.
III.Overviewofwallenergy-savingdesign
Theinnerandouterwallsofthisprojecttoweraremadeofconcreteaeratedblocks,thethicknessoftheouterwallsis200mm,andthethicknessoftheinnerpartitionwallis100mm.
200MM,and150mmthickaeratedblockisusedforthepartitionwallofstairwell.Amongthem,theexteriorwallofthetowerisdecoratedasfollows:
1,brickexteriorwallpractice
1)whiteexteriorwallthermalinsulationreflectivecoating;
XXX1ofJuntaiConstructionProject
ConstructionSchemeofReflectiveThermalInsulationCoatingforExteriorWallofThreeResidentialBuildings,TwoCommercialBuildingsandOneUndergroundGarageinSFGarden
2)Externalwalltiles,gluedwithadhesive;
3)5thickanti-crackingmortarcompositehot-dipgalvanizedsteelwiremesh(wirediameter0.9mm),aperture12.7*12.7mm),plasticanchor
Two-wayboltspacing500mmanchorage;
4)brushtheinterfaceagenttogether;
5)5mmthickpolymerwaterproofmortar;
6)10mmthick1:3cementmortarlevelinglayer;
7)Treatingtheinterfaceofthewallsurfaceatthegrass-rootslevel,brushingtheinterfacemortartogether;
2.Thermaldesignparametersofbuildingenergy-savingmaterialsinthisprojectareasfollows:
Averagesolarradiationabsorptioncoefficientofexteriorwall:ρ≤0.75,averageheattransfercoefficientofexteriorwallKm:
1.48W/(㎡k)AveragethermalinertiaindexDM:3.19.
IV.Overviewofreflectivethermalinsulationcoatingsforexteriorwalls
Reflectivethermalinsulationcoatingforexteriorwallistoreflect(radiate)theheatgeneratedbyinfraredraysinthesunlight,thusachievingthermalinsulation,
Afunctionalcoatingforthermalinsulation.Thecoatingiscomposedoffilm-formingmaterials,pigmentsandfillers,specialfunctionalmaterialsandadditives.every
Allkindsofmaterialshavedifferentinfraredabsorptionandreflectivity,soweshouldpayattentiontotheperformanceofeachmaterialwhenselectingmaterials.
1.Film-formingmaterials(resins):Mostorganicresinsasfilm-formingmaterialsaretransparentinthenear-redregion,
Whilevisiblelightabsorbssomeenergywiththedifferentcolorofresin.Generally,colorlesstransparentresinhardlyabsorbs.
Theenergyofsunlight.Therefore,resinscommonlyusedingeneralcoatingscanbeusedforsolarphotothermalreflectivecoatings.
XX2ofJuntaiConstructionProject
ConstructionSchemeofReflectiveThermalInsulationCoatingforExteriorWallofThreeResidentialBuildings,TwoCommercialBuildingsandOneUndergroundGarageinSFGarden
Theresinusedforexteriorwallreflectivethermalinsulationcoatingrequiresthatthelowertheabsorptionrateofvisiblelightandnearinfraredlight,thebetter.Most
Resincanmeet;Thehigherthetransparencyofresinisrequired,thelowerthesolarabsorptionrateis.Solarheatabsorptionofseveralcoatings
Theyieldisshowninthetable:
Solarthermalabsorptivityofseveralcoatings
Coatingpigmentabsorptionrate
OrganicresinTiO20.10epoxyresinTiO20.25
Silicone-acrylicresinTiO20.19polyurethaneresinTiO20.26
Silicone-alkydresinTiO20.22acrylicresinTiO20.24
2.Pigmentsandfillers:Exteriorwallreflectivethermalinsulationcoatingachievesthepurposeofthermalinsulationandcoolingbyreflectinginfraredraysinsunlight.
Yes,pigmentsandfillers,likeresins,requirethatthegreaterthereflectivityofvisiblelightandnearinfraredrays,thebetter,andthesmallertheabsorptivity,thebetter.
Atthesametime,inordertoreducethetransmissionofsunlight,pigmentsandfillersshouldalsohavethegreatestscatteringeffectonsunlight.
Factorsaffectingsunlightscatteringbypigmentsandfillers;
①CoveringpowerofpigmentsandfillersThegreaterthecoveringpowerofpigmentsandfillers,thegreaterthescatteringeffectonsunlight.Pigmentfiller
Titaniumdioxide(rutiletype)hasthelargesthidingpower,anditalsohasagreatscatteringeffectonsunlight.
②Refractiveindexofpigmentsandfillers.Therefractiveindicesofvariouspigmentsandfillersarealldifferent,andthedifferencesareveryhighandlow,asshowninTable3.
Refractiveindexofpigmentsandfillers
Namerefractiveindexnamerefractiveindex
Titaniumdioxide(rutiletype)2.80bariumsulfate1.64
Titaniumdioxide(anatase)2.50magnesiumsulfate1.58
2.2zincoxideand1.54silicondioxide
Lithopone1.84ironoxidered2.80
Talcpowder1.59ironoxideyellow2.30
Alumina1.7
3.Specialfunctionalityofpigmentsandfillers:Specialfunctionalitymeansthatitcanplayahigherroleinexteriorwallreflectivethermalinsulationcoatingsatthesametime.
Synergisticpropertiesofanti-radiationanddiffusescattering,suchasnano-titaniumdioxide,antimonytrioxide,oxidation
Zirconiumandsomeothernanomaterials,phasechangematerials(vanadiumdioxideanditsdopants)andhollowglass(ceramic)microbeads.
Wait.
XXX3ofJuntaiConstructionProject
ConstructionSchemeofReflectiveThermalInsulationCoatingforExteriorWallofThreeResidentialBuildings,TwoCommercialBuildingsandOneUndergroundGarageinSFGarden
Hollowglass(ceramic)microbeadsaregenerallyaddedtotheintermediatecoating.Afterthecoatingiscuredtoformafilm,afilmisformedinthecoating
Thebarrierofhollowsphericalglassbeadsblockstheintroductionofheat.
4.Additives
Itsadditivesaresimilartopigmentsandfillersofgeneralcoatings:
(1)becausetheexteriorwallreflectivethermalinsulationcoatingshouldhavethespecialfunctionofthermalinsulation,somanufacturersmakeitwhite,which
Samplescankeepgoodreflection,whichisconducivetotheheatinsulationfunction.Onthecontrary,nomatterwhatcolor,theheatinsulationeffectwillbereduced.
②Thethermalinsulationperformanceofexteriorwallreflectivethermalinsulationcoatingisalsocloselyrelatedtothesurfacecleanlinessofthecoating.Addspecial
AdurablesurfactantisusedtoadjustthesurfaceXforce,sothatthecoatingishydrophilic,antifoulinganddurable.Whenbeingwashedbyrain,
Thedustonthesurfaceofthecoatingiswashedawaybyrain,leavingnoraindropimprintafterdrying,andkeepingtheappearanceofthecoatingwithoutanyinfluence.
Clean.
ChapterIICompilationBasis
1.UnifiedStandardforAcceptanceofConstructionQualityofBuildingEngineering(GB50300-2013)
2.CodeforQualityAcceptanceofBuildingDecorationEngineeringX(X》(GB50210-2018)
3.CodeforAcceptanceofConstructionQualityofBuildingEnergy-savingProjectsX(SZJG31—2014)
4.Energy-savingTestingStandardforArchitecturalReflectiveThermalInsulationCoatings(JGJ/T287-2014)
5,theXXprovincebuildingenergy-savingengineeringconstructionqualityacceptancespecificationX(DBJ15-65-2009)
6.TechnicalSpecificationforApplicationofReflectiveThermalInsulationCoatingsforBuildingsinXXProvince(DBJ15-75-2010);
7.ReflectiveThermalInsulationCoatingsforBuildings(JG/T235-2014);
8.ReflectiveThermalInsulationCoatingsforBuildings(GBT25261-2010););
XXX4ofJuntaiConstructionProject
ConstructionSchemeofReflectiveThermalInsulationCoatingforExteriorWallofThreeResidentialBuildings,TwoCommercialBuildingsandOneUndergroundGarageinSFGarden
9.TechnicalSpecificationforApplicationofReflectiveThermalInsulationCoatingsforBuildings(JGJ/T359-2015)
10.CodeforAcceptanceofConstructionQualityofResidentialBuildingEnergy-savingProject(DB11/1340-2016)
11,thebuildingconstructionsafetyinspectionstandard(JGJ59-2011)
12.TechnicalSpecificationforSafetyofAerialWorkinConstructionX(JGJ80-2016)
13.HangingBasketforAerialWork(GB19155-2003)
14,theconstructionsitetemporaryelectricitysafetytechnicalregulationsx(jgj46-2012)
15.thearchitecturalandstructuraldesigndrawingsofXXxxBaiyunbuildinginxxcityprovidedbytheowner,thearchitecturalfestival
DesignSpecialArticles"andrelatedreviewopinions;
ChapterIVConstructionDeployment
I.Organization
Second,thequalityobjectives
AccordingtotheengineeringstandardofXXprovince,codeforacceptanceofconstructionqualityofbuildingenergy-savingengineeringinXXprovince,dbj15-65-2009,
Theengineeringqualityofreflectivethermalinsulationcoatingforexteriorwallhasreachedthequalifiedstandard.
III.Energy-savingtargets
StrictlyimplementtheprovisionsoftheCodeforAcceptanceofConstructionQualityofBuildingEnergy-savingProjectsX(SZJG31-2010)toensurethisproject
XXX5ofJuntaiConstructionProject
ConstructionSchemeofReflectiveThermalInsulationCoatingforExteriorWallofThreeResidentialBuildings,TwoCommercialBuildingsandOneUndergroundGarageinSFGarden
Meettheenergy-savingstandardsrequiredbydesignandregulationX..
IV.Constructionpreparationwork
1,shouldbeengagedinbuildingenergy-savingengineeringconstructionrelatedemployeesforbuildingenergy-savingstandardsandtechnologiesandotherprofessionalknowledge.
Knowledgetraining.Constructionmanagersshouldparticipateincontinuingeducationofbuildingenergyconservationpractice.
2,theconstructionsite,shouldbeequippedwiththerelevantnationalandmunicipallawsandregulationsonbuildingenergyconservationandtheproject-relatedbuildingenergyconservation.
Sexstandard.
3.Beforetheconstructionofbuildingenergy-savingproject,theprojectchiefengineershouldorganizetheconstructionpersonneltobefamiliarwiththedesigndocumentsandparticipateinthejointreviewofconstructiondrawings.
Anddesigndisclosure.
4,thejointreviewofconstructiondrawings,shouldreviewwhetherthebuildingenergy-savingdesigndrawingshavepassedtheexaminationoftheconstructiondrawingdesignreviewunit.
Constructiondrawingsthathavenotbeenexaminedorreviewedanddonotmeetthemandatorybuildingenergyefficiencystandardsshallnotbeused.
5.Disclosureofbuildingenergy-savingdesign.
V.Workintheconstructionphase
Beforeconstruction,theapplicationformofmaterials/components/equipmentofbuildingenergy-savingengineeringtobebroughtintoplayshallbesubmittedasrequired(includingwall
Materials,thermalinsulationmaterials,doorandwindowparts,lightingequipment,etc.)andtheirqualitycertificationmaterials,asfollows:
1)Qualitycertificationmaterials(warrantyletter,specification,typeinspectionreportandreinspectionreportofinsulationsystemandcomponentmaterials)
Whetheritisqualifiedandcomplete,andwhetheritmeetstherequirementsofdesignandproductstandards.Asindicatedintheproductspecificationandproductidentification.
Whethertheperformanceindexmeetsthebuildingenergyefficiencystandard.
2)Whethertousematerials,componentsandequipmentthatarebannedoreliminatedbythestate.
3)Whetherthereisarecordcertificateofbuildingmaterialsandcorrespondingverificationrequirements.
4)Follow-upinspectionorwitnesstakingaccordingtotheproportionoftheentrustedconstructioncontractandtherelevantprovisionsofbuildingenergyefficiencystandards.
Sample,sendsamplesfortesting.
5)Thebuildingenergy-savingengineeringmaterials,componentsandequipmentthathavenotbeenacceptedorfailedtobeacceptedshallnotbeusedinengineering.
Orinstall;Thematerials,componentsandequipmentthatarebannedoreliminatedbythestateshallnotbesignedandrecognized,andtheywillfailtopassthedeadline.
Buildingenergy-savingengineeringmaterials,componentsandequipmentshallbewithdrawnfromthesite.
6)Patrolandinspectthebuildingenergy-savingconstructionprocess.Theunqualifiedprocessshallnotbefollowedbythenextprocess.
Construction.
ChapterVConstructionTechnologyofCeramicTileFacingReflectiveHeatInsulationCoating
XXX6ofJuntaiConstructionProject
ConstructionSchemeofReflectiveThermalInsulationCoatingforExteriorWallofThreeResidentialBuildings,TwoCommercialBuildingsandOneUndergroundGarageinSFGarden
I.Basictechnologicalprocess
Thefollowingconstructiontechnologyisadoptedforcoatingceramictilereflectivethermalinsulationcoating:
Treatmentandcleaningofouterwalltilebaselayer→sprayingsealingprimerfor1time→sprayingreflectivethermalinsulationcoatingprimerfor1time→spraying.
Applyintermediatepaintofreflectivethermalinsulationcoatingonce→sprayfinishpaintofreflectivethermalinsulationcoatingonce→sprayfinishpaintonce→details.
Management→cleaningandmaintenance.
Second,themainmaterialselection
1.Cleaningmaterials:dilutehydrochloricacidoroxalicacidornaturalwater,etc.
2.Sealingprimer:"YingsuGranule"brandisadopted.Thisprimerhasgoodpermeability,excellentalkalisealingresistanceofpaintfilm,andgoodalkaliresistance.
Stronglayeradhesion;
3.Sprayreflectivethermalinsulationprimer:adoptthebrandof"YingsuGranule",andsprayreflectivethermalinsulationprimertoimprovethebase.
Adhesionoflayer;
4.Sprayreflectiveheat-insulatingintermediatepaintandfinishpaint:adopt"YingsuGranule"brand,reflectiveheat-insulatingpaintandmaincoating.
Remarkableradiationheatinsulationeffect,excellentwashingresistance,stainresistance,weatherresistance,algaeresistanceandmildewresistance,andgoodvisualeffect;
5.Overcoat:Itadopts"YingsuGranule"brand,whichhashighglossandglossretention,andplaysadecorativeandprotectiverole.
III.ConstructionTechnologyandRequirements
1,grassrootsrequirements
(1)Afterthecompletedexteriorwalltilesarequalified,theywillbehandedovertotheexteriorwallreflectivethermalinsulationcoatingprofessionalconstruction.
Unitconstruction.
(2)Thesurfacetreatmentoftheexternalwalltilesmustbesmoothandconsistentincolor,andthetilesshouldnotbepeeled,powdered,orchipped.
Andotherphenomena;Thesurfaceofbrickmortarjointshallbesmooth,withoutlooseness,sanding,pulverization,cracks,damages,honeycombsandholes.
Andhassufficientstrengthandrigidity.
(3)Theprofessionalconstructionunitofexteriorwallreflectivethermalinsulationcoatingusesdilutehydrochloricacidoroxalicacidornaturalwaterfortheconstructionface.
Suchascleaningmaterialsforcomprehensivecleaning.Accordingtothetop-downeverythreelayerstocleanagain,cycle,verticalconstructionface.
Staggeredwitheachothertopreventandavoidsecondarypollutioncausedbytoolongcleaningintervalandconstructionprocess.
(4)Themoisturecontentofthebaseshouldbe<8%,andthePHvalueshouldbebelow10.Iftheaboverequirementsarenotmet,theconstructionperiodshouldbeappropriatelyextended.
2.Constructionofsealingprimer
(1)onthebasethatmeetstheconstructionconditions,paintbrushshallbeusedtobrushtheinternalcornersfirst,andthentheexteriorwallbeddingfaceshallbesprayed.Requirements
Nosagging,nobrushleakage,thedosageis0.17~0.20㎏/㎡(once),anditcanbedilutedaccordingtotheneed,butthewaterisadded.
XXX7ofJuntaiConstructionProject
ConstructionSchemeofReflectiveThermalInsulationCoatingforExteriorWallofThreeResidentialBuildings,TwoCommercialBuildingsandOneUndergroundGarageinSFGarden
Nomorethan15%.Afterpriming,thesurfaceshouldbeuniformincolor,andtherearenoproblemssuchascoatingleakageandprimerpenetration.
(2)Afterthebasecoatiscompletelydry(about24h),thereflectiveheatinsulationcoatingforexteriorwallshallbeconstructed.
3.Constructionofreflectivethermalinsulationcoating
(1)sprayingreflectiveheat-insulatingpaintprimer,reflectiveheat-insulatingpaintintermediatepaintandreflectiveheat-insulatingpainttopcoat
Construction,shouldbefromtoptobottomaccordingtoeverythreelayersofaconstructionperiod,afterthecompletionofeachlayerofpaintconstruction,eachtimefinishingmaterials.
Materialconstructionmustbecarriedoutafterthesurfaceofthepreviouscoatingmaterialisdried(about4hours),andeachcoatingmaterialshouldbecoated.
Uniformdecoration,eachlayeroffinishingmaterialsmustbecombinedfirmly,andthenumberoftopcoatingscanbeincreasedforprojectswithspecialrequirements;
A,ingredients:Lipudowithhigh-efficiencyhemisphericalreflectionabilityismixedwithfinishaccordingtotheratioof1:12.
Sprayevenlyonthetilesurfaceoftheexteriorwallwithaspraygun,withthedosageof0.20~0.25㎏/㎡(once),andthesprayingtimesarehorizontal,
Sprayitverticallyandvertically.
B.Sprayingconstruction:thedistancebetweenthemuzzleandthewallisabout25cm,andthehand-heldspraygunisusedtosprayevenlyhorizontally,verticallyandvertically.
Sprayonceineachdirection.Sprayisnotallowedinstrongwind(windspeedismorethan5m/min)andrainydays.
C.Coatingthicknessrequirements:thethicknessofeachcoatingisbetween0.18mm-0.23mm,andthesurfaceisuniform.
(2)Ontheclosedprimerlayerthatmeetstheconstructionconditions,selectapaintbrushtobrushtheinternalcornersfirst,andthenspraytheexteriorwallbeddingface.
Itisrequiredthatthereshouldbenosaggingandbrushleakage,andthesurfaceafterprimingshouldbeuniform,freefromcoatingleakage,virtualshadow,needleholesandairholes.
Question.
(3)Duringthewholeconstructionprocess,theconstructionviscosityoffinishingmaterialsshouldbebasedonthemethod,temperatureandhumidityintheconstructionseason,etc.
Theconditionsarestrictlycontrolled,andaspecialpersonshallberesponsiblefortheallocationaccordingtotheinstructions.Diluentorwatershallnotbeaddedatwill;
(4)Thecoatingmaterialsofthesamebatchnumbershallbeappliedtothesamewallsurfaceinthesamecolor.Whenthebatchnumberofthesamecolorisdifferent,thecoatingmaterialsshallbepreparedinadvance.
Evenlymix,toensurethatthesamewalldoesnotproducecolordifference;
(5)Whencoatingbyspraying,thecoatingfilmshouldnotbetoothickortoothin,anditshouldbefullycoveredandnottransparent.
Shadow,uniformsurface.
(6)Whenspraying,theviscosityofthecoatingandthepressureofthespraygunshouldbecontrolled,andthethicknessofthecoatingshouldbeuniform,withnoexposureandnoflow.
Drop,uniformcolor;
(7)Inthefastdryingseason,whenfinishinginalargearea,manypeopleshouldcooperatewiththeoperation,flowoperation,andapplyinthesamedirection.
Decoration,shoulddealwithsummer-plantingparts.
(8)Exteriorwallfinishingconstructionshouldbecarriedoutfromtoptobottom;Materialcoatingconstructionsectionshouldbeinmetopeframeseam,
YinandYangcornerofwallordownspoutisthedividingline.
XXX8ofJuntaiConstructionProject
ConstructionSchemeofReflectiveThermalInsulationCoatingforExteriorWallofThreeResidentialBuildings,TwoCommercialBuildingsandOneUndergroundGarageinSFGarden
4.Constructionoffinishcoat
Aftertheconstructionofreflectivethermalinsulationcoatingforexteriorwalliscompleted,finishcoatshallbeconstructed.Finishcoatmustbeusedbefore.
Mixwell,selectthemostsuitableconstructionratioandadjusttheappropriateadhesiveaccordingtothetemperature,humidityanddifferentcoatingmethodsonthespot.
Water-basedfinishpaintisakindofwater-basedpaint,soorganicsolventpollutionshouldbeavoided.
5.Detailtreatment
Mainlyfortheconstructionelevator,towercraneembeddedparts,balconylines,rainwaterpipesandotherpartsforsecondarytreatment.
6.Cleaningandmaintenance
Afterthecompletionofthedetailtreatment,clearupthewindowframe,glassandbalcony,whicharemainlycausedbytheconstruction.
Andair-conditioningrailings;Afterthecompletionofcleaning,conductacomprehensiveinspection,andcarryoutre-inspectiononthepartswheretheconstructionisnotinplace.
Secondarytreatment.
IV.ConstructionMeasures
1,ceramictilefacingexteriorwallreflectivethermalinsulationcoatingadoptsautomaticelectrichangingbasketforconstruction,electrichangingbaskettype.
No.ZLP630,whichisarrangedalongtheperipheryoftheexternalwall.First,theeast-westfacadeisconstructed,andthenthenorth-southfacadeisconstructed.
Thenumberis20,whichhasmettheconstructionneeds.
2.Theinstalleddoorsandwindows,decorativelayers,etc.arecoatedwithreflectivethermalinsulationcoatingforceramictilefacingexteriorwallwithwoodenboards,
Plasticplate,etc.Flowersandtreesinthegardenshouldbecoveredwithstripedclothbeforespraying.Hangingbasketdownto
Whentherearetreesandflowersplanted,stayabovethem.Peopleusethedoorframetogoupanddown,andthehangingbasketfallsonthetreesandflowers.
Outsidethegrassclearing;
V.PrecautionsforConstruction
1,payattentiontothesafetyofcrossconstructionandmutualprotectionoffinishedproducts.Ifpollutionoccurs,itshouldbecleanedupimmediately.
2.Whencarryingoutthenextworkingprocedure,besuretowaituntilthepreviousworkingprocedureiscompletelydry.
3.Constructioninrainyandwindyweathershouldbeavoided,andtheconstructionshouldbestoppedwhentherelativehumidityisgreaterthan80%.
4.Theunusedtopcoatshouldbecoveredtopreventashfallingandcrusting.
5.Materialsmustbekeptindoorstopreventfreezinginwinterandnotexposedtothehotsuninsummer.
6.Forthepaintingoftowercranes,scaffoldingholes,roofsnearthegroundandotherspecialparts,thespecificschemeisrelatedto
Implementationafterconsultation.
ChapterVIConstructionProgressPlan
XXX9ofJuntaiConstructionProject
ConstructionSchemeofReflectiveThermalInsulationCoatingforExteriorWallofThreeResidentialBuildings,TwoCommercialBuildingsandOneUndergroundGarageinSFGarden
Accordingtoourcompany'spreviousconstructionexperienceandconstructiontechnicalforce,thebidperiodofthisprojectiscompletelyguaranteed,andthespecificwork
Theplanschedulewillbeformulatedaccordingtotheactualsituation.
ThisprojectisplannedtostartconstructiononMarch1,2020,andtheplannedcompletiontimeisApril30,2020.Theproject
Thetotalconstructionperiodis60days.
ChapterVIIResourceDemandPlan
1.LaborDemandPlan
Mainlabordemandscale
Noteofserialnumberofworkunitquantity
1generalworker15
2Painters40
3Electrician2
4Mechanic6Hangingbasketassembly
Note:Accordingtotheactualconstructionsituation,necessaryadjustmentscanbemadetoensurethattheconstructionpersonnelcanmeettheconstructionrequirements.
2.DemandPlanforMainMaterialsandTurnoverMaterials:
Everytimethemainmaterialcomesintoplay,20tonsofwaterisneeded.
3,mechanicalequipmentdemandplan:
Listofmainconstructionmachinery
Serialnumbermachinename,specification,model,unitquantity
1materialhoistJJM-3sets1
2AutomaticelectrichangingbasketZLP630hangingbasketplatform20
3.Rope120m.Strip10
4stirringrod/root5
5airlessspraygunGRACO395TTaiwan6
6Powercable3×6+1×4m600
Note:Accordingtotheactualconstructionsituation,necessaryadjustmentscanbemadetoensurethattheequipmentmeetstheconstructionrequirements.
4.Demandplanforlargetoolsandappliances:
1.Brushandmeasuringtoolssuchaslineruler,brush,combinationbrushpen,bucket,balanceandscale.
XX10ofJuntaiConstructionProject
ConstructionSchemeofReflectiveThermalInsulationCoatingforExteriorWallofThreeResidentialBuildings,TwoCommercialBuildingsandOneUndergroundGarageinSFGarden
2,supportingspecialrolleranduniformplateandotherrollercoati
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025品牌營(yíng)銷策劃服務(wù)合同范本
- 綠色農(nóng)業(yè)發(fā)展與教育普及的雙重重要性
- 疫情背景下病患支持體系變革及其在未來(lái)的應(yīng)用展望分析報(bào)告
- 商業(yè)實(shí)戰(zhàn)中學(xué)生的創(chuàng)新思維與實(shí)踐能力鍛煉
- 二零二四年外墻保溫材料環(huán)保認(rèn)證與施工合同3篇
- 二零二五年度企事業(yè)單位炊事員服務(wù)合同3篇
- 部編語(yǔ)文六年級(jí)上冊(cè):全冊(cè)單元、期中期末試卷文檔
- 2025年人教版PEP八年級(jí)地理上冊(cè)階段測(cè)試試卷含答案
- 2025年湘教新版必修3生物下冊(cè)階段測(cè)試試卷
- 2025年外研版七年級(jí)物理上冊(cè)階段測(cè)試試卷
- 乳腺癌的綜合治療及進(jìn)展
- 【大學(xué)課件】基于BGP協(xié)議的IP黑名單分發(fā)系統(tǒng)
- 2025年八省聯(lián)考高考語(yǔ)文試題真題解讀及答案詳解課件
- 信息安全意識(shí)培訓(xùn)課件
- 2024年山東省泰安市初中學(xué)業(yè)水平生物試題含答案
- 美的MBS精益管理體系
- 中國(guó)高血壓防治指南(2024年修訂版)解讀課件
- 2024安全員知識(shí)考試題(全優(yōu))
- 2024年衛(wèi)生資格(中初級(jí))-中醫(yī)外科學(xué)主治醫(yī)師考試近5年真題集錦(頻考類試題)帶答案
- 中國(guó)大百科全書(shū)(第二版全32冊(cè))08
- 醫(yī)院出入口安檢工作記錄表范本
評(píng)論
0/150
提交評(píng)論