NATIONALSTANDARD
OFTHEPEOPLE'SREPUBLICOFCHINA
CODEFORCONSTRUCTIONANDACCEPTANCEOF
MICRO-ASSEMBLINGPRODUCTIONLINEPROCESS
EQUIPMENTINSTALLATIONENGINEERING
GB51037-2014
DevelopedbyTheMinistryofIndustryandInformationTechnologyof
thePeople'sRepublicofChina
ApprovedbyTheMinistryofHousingandUrban-Rural專用Developmentof
thePeople'sRepublicofChina
ImplementationDateMay1,2015
人人文庫
ChinaPlanningPress
Beijing2021
圖書在版編目(CIP)數(shù)據(jù)
GB51037-2014微組裝生產(chǎn)線工藝設(shè)備安裝工程施工
及驗(yàn)收規(guī)范:英文/中華人民共和國(guó)住房和城鄉(xiāng)建設(shè)部
組織編譯.--北京:中國(guó)計(jì)劃出版社,2021.12
ISBN978-7-5182-1415-0
Ⅰ.①G…Ⅱ.①中…Ⅲ.①微組裝—生產(chǎn)線—生產(chǎn)
工藝—設(shè)備安裝—工程施工—規(guī)范—中國(guó)—英文②微組裝
—生產(chǎn)線—生產(chǎn)工藝—設(shè)備安裝—工程驗(yàn)收—規(guī)范—中國(guó)
—英文Ⅳ.①TB4-65
中國(guó)版本圖書館CIP數(shù)據(jù)核字(2022)第010386號(hào)
ChineseeditionfirstpublishedinthePeople'sRepublicofChinain2014
EnglisheditionfirstpublishedinthePeople'sRepublicofChinain2021
byChinaPlanningPress
3rdFloor,CTower,GuohongBuilding專用
No.A11,Muxidi-Beili,XichengDistrict
Beijing,100038
PrintedinChinabyBeijingJingyintangGraphicPrintingCenter
?2014bytheMinistryofHousingandUrban-RuralDevelopmentof
thePeople'sRepublicofChina
Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor
byanymeans,graphic,electronic,ormechanical,includingphotocopying,recording,
oranyinformation人人文庫storageandretrievalsystems,withoutwrittenpermissionofthepublisher.
Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,
resold,hiredoutorotherwisecirculatedwithoutthepublisher'spriorconsentinanyformof
blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition
includingthisconditionbeingimposedonthesubsequentpurchaser.
ISBN978-7-5182-1415-0
中華人民共和國(guó)住房和城鄉(xiāng)建設(shè)部公告
2020年第129號(hào)
住房和城鄉(xiāng)建設(shè)部關(guān)于發(fā)布《微組裝生產(chǎn)線
工藝設(shè)備安裝工程施工及驗(yàn)收規(guī)范》等
11項(xiàng)工程建設(shè)標(biāo)準(zhǔn)英文版的公告
現(xiàn)批準(zhǔn)《微組裝生產(chǎn)線工藝設(shè)備安裝工程施工及驗(yàn)收規(guī)范》(GB51037-2014)、《電子工
業(yè)純水系統(tǒng)安裝與驗(yàn)收規(guī)范》(GB51035-2014)、《光纜生產(chǎn)廠工藝設(shè)計(jì)規(guī)范》(GB51067-
2014)、《光纖器件生產(chǎn)廠工藝設(shè)計(jì)規(guī)范》(51123-2015)、《電子工程防靜電設(shè)計(jì)規(guī)范》(專用50611-
GBGB
2010)、《防靜電工程施工與質(zhì)量驗(yàn)收規(guī)范》(GB50944-2013)、《天線工程技術(shù)規(guī)范》(GB50922-
2013)、《試聽室工程技術(shù)規(guī)范》(GB/T51091-2015)、《體育場(chǎng)建筑聲學(xué)技術(shù)規(guī)范》(GB/T50948-
2013)、《電子會(huì)議系統(tǒng)工程設(shè)計(jì)規(guī)范》(GB50799-2012)、《電子會(huì)議系統(tǒng)工程施工與質(zhì)量驗(yàn)收
規(guī)范》(GB51043-2014)英文版。工程建設(shè)標(biāo)準(zhǔn)英文版與中文版出現(xiàn)異議時(shí),以中文版為準(zhǔn)。
該11項(xiàng)工程建設(shè)標(biāo)準(zhǔn)英文版由住房和城鄉(xiāng)建設(shè)部組織中國(guó)計(jì)劃出版社有限公司出版發(fā)行。
中華人民共和國(guó)住房和城鄉(xiāng)建設(shè)部
2020年5月28日
人人文庫
AnnouncementoftheMinstryofHousingandUrban-Rural
DevelopmentofthePeople'sRepublicofChina
No.533
AnnouncementoftheMinistryofHousingandUrban-Rural
DevelopmentonPublishingNationalStandardof
CodeforConstructionandAcceptanceofMicro-assemblingProductionLine
ProcessEquipmentInstallationEngineering
CodeforConstructionandAcceptanceofMicro-assemblingProductionLineProcessEquipment
InstallationEngineeringhasbeenapprovedasanationalstandardwithaserialnumberofGB51037-
2014,andwillbeimplementedonMay1,2015.Inthiscode,Articles4.2.1(4),4.5.2(1),5.4.1(3),5.6.1
(3),5.7.1(5)7.7.2(3)專用.
andaremandatoryonesandmustbeimplementedstrictly
AuthorizedbytheResearchInstituteofStandardsandNormsofMinistryofHousingandUrban-
RuralDevelopmentofthePeople'sRepublicofChina,thiscodeispublishedanddistributedbyChina
PlanningPress.
MinistryofHousingandUrban-RuralDevelopmentofthePeople'sRepublicofChina
August27,2014
人人文庫
Foreword
ThiscodeisdevelopedbySinopecEngineeringIncorporationincooperationwithotherinvolved
organizationsaccordingtotherequirementsofDocumentJIANBIAO〔2010〕No.43issuedbythe
MinistryofHousingandUrban-RuralDevelopmentofthePeople'sRepublicofChina(MOHURD)—
“NoticeonPrintingandDistributing‘theDevelopmentandRevisionPlanofNationalEngineering
ConstructionStandardsin2010’”,thiscodeiscompiledandformulatedbyElectronicEngineering
StandardQuotaStationofChinaElectronicsStandardizationInstitute,the2ndResearchInstituteof
ChinaElectronicsTechnologyGroupandotherrelevantorganizations.
Basedontheinvestigationandresearch,thecompilationteamsummarizedthepracticalexperience,
absorbedthescientificresearchresultsinrecentyears,drewontheadvancedforeignexperiencewhichis
inlinewiththenationalconditionsofourcountry,andextensivelysolicitedpinionsfromthedomestic
relatedunitsondesign,productionandresearch.Andthecodewasfinalizedafterreview.
Thiscodeconsistsof8chaptersand1appendix,covering:generalprovisions;terms;basic
requirements;installation,debuggingandcommissioningoflowtemperature專用co-finedceramicandthick
filmsubstrateproductionprocessequipment;thinfilmsubstrateproductionprocessequipment
installation,debuggingandcommissioning;installation,debuggingandcommissioningofassembling
andpackagingprocessequipment;installation,debuggingandcommissioningofprocessinspection
equipment;engineeringacceptance,etc.
Theprovisionsprintedinboldtypearemandatoryonesandmustbeimplementedstrictly.
Thiscodeisunderthejurisdictionof,anditsmandatoryprovisionsareinterpretedbytheMinistry
ofHousingandUrban-RuralDevelopment.TheMinistryofIndustryandInformationTechnology
takescareoftheroutinemanagement,whilethe2ndResearchInstituteofChinaElectronics
TechnologyGroupCorporationisresponsiblefortheinterpretationoftechnicalspecifications.All
relevantorganizationsarekindlyinvitedtosummarizeandaccumulateactualexperienceswhen
implementingthiscode.Relevantcommentsandrecommendations,whenevernecessary,shallbe
submittedtothe2ndResearchInstituteofChinaElectronicsTechnologyGroupCorporation(Address:
No.115HepingSouthRoad,TaiyuanCity,ShanxiProvince,Postcode:030024)forfuturerevision.
ChiefDevelopmentOrganizations,Co-DevelopmentOrganizations,ChiefDrafters,Chief
Reviewers,Chief人人文庫TranslatorsandChiefTranslationReviewersofthiscode:
ChiefDevelopmentOrganizations:
ElectronicEngineeringStandardQuotaStationofChinaElectronicsStandardization
Institute
The2ndResearchInstituteofChinaElectronicsTechnologyGroup
Co-DevelopmentOrganizations:
The214thResearchInstituteofChinaNorthIndustriesGroupCorporation
The14thResearchInstituteofChinaElectronicsTechnologyGroup
The29thResearchInstituteofChinaElectronicsTechnologyGroup
The43rdResearchInstituteofChinaElectronicsTechnologyGroup
ChinaElectronicSystemEngineeringNo.2ConstructionCorporationLimited
TheITElectronicEleventhDesignandResearchInstituteScientificand
TechnologicalEngineeringCorporationLimited
The26thResearchInstituteofChinaElectronicsTechnologyGroup
ChinaElectronicsEngineeringDesignInstitute
ChiefDrafters:
CHAOYuqingHEZhongweiYANWeiDUBaoqiangGAONengwu
WANGZhengyiWANGKaiyuanZHENGBingxiaoLIXiaoxuan
QIAOHailingWANGGuipingLVQinHongHUANGWensheng
WUJianhua
ChiefReviewers:
WUXiangXUEChangliSHENXianfengCHENGKaiQIUYingxia
HULaipingLIYangxingHEChangfengZHANGYu
ChiefTranslators:
LIJingzhaoZHOULiDUBaoqiangZHANGXiaomingZHUZongjiu
ChiefTranslationReviewers:
LIAOYanlinSONGGuixiaYANGKegui專用
人人文庫
Contents
1Generalprovisions…………………(1)
2Terms…………………(2)
3Basicrequirements………………(3)
3.1Constructionconditions……………(3)
3.2Equipmentunpacking…………………(3)
3.3Equipmentmoving………………………(4)
3.4Equipmentinstallation…………………(5)
3.5Debuggingandcommissioningofequipment……………(6)
4Installation,debuggingandcommissioningoflowtemperatureco-finedceramicand
thickfilmsubstrateproductionprocessequipment………………(7)
4.1Generalrequirements……………………(7)
4.2Tapecaster……………(7)
4.3Blanker……………………………專用(8)
4.4Greentapepuncher……………………(8)
4.5Laserscribingmachine…………………(9)
4.6Viafillingmachine………………………(9)
4.7Screenprinter…………………………(10)
4.8Stackingmachine…………………………(10)
4.9Isostaticlaminator……………………(11)
4.10Hotcutter……………………………(12)
4.11Lowtemperatureco-finedceramicboxfurnace(LTCCboxfurnace)………(12)
4.12Thick-filmbeltfurnace……………(13)
4.13Laserresistortrimmer……………(13)
5Thinfilmsubstrateproductionprocessequipmentinstallation,debuggingand
commissioning………………………(15)
5.1Generalrequirements……………………(15)
5.2Magneticsputteringdepositionsystem…………………(15)
5.3Vacuumevaporative人人文庫copper-coatedmachine……………(16)
5.4Chemicalvapordepositionsystem………………………(17)
5.5Spincoatingandhotplatesystem…………(18)
5.6Exposuremachine……………………(19)
5.7Developingsystem……………………(19)
5.8Reactiveionetchingmachine……………(20)
5.9Chemicalmechanicalpolishingmachine…………………(21)
6Installation,debuggingandcommissioningofassemblingand
packagingprocessequipment……………………(23)
6.1Generalrequirements……………………(23)
6.2Dieattachingmachine……………………(23)
6.3Dieeutecticbonder………………(23)
6.4Eutecticoven………………………(24)
6.5Wirebonder………………………(25)
6.6Flipchipbonder………………………(25)
6.7Plasmacleaner……………………(26)
6.8Selectivespraycoatingmachine…………(26)
6.9Parallelseamwelder………………(26)
6.10Energystoragewelder…………………(27)
6.11Laserwelder……………………(28)
7Installation,debuggingandcommissioningofprocessinspectionequipment……(29)
7.1Generalrequirements…………………(29)
7.2Probetester………………………(29)
7.3Acousticscanner…………………(30)
7.43Dopticalprofiler………………………(30)
7.5Automaticopticalinspector……………(30)
7.6Laserthicknessgauge……………………(31)
7.7X-rayscanner……………(31)
7.8Chipshearing/wirepullingtester…………專用(32)
8Engineeringacceptance……………(33)
8.1Generalrequirements…………………(33)
8.2Handoveracceptance…………………(33)
8.3Completedacceptance…………………(34)
8.4Disposalofreject………………………(34)
AppendixARecordformsofacceptanceformicro-assemblingproductionlineprocess
equipmentinstallationengineering……………………(35)
Explanationofwordinginthiscode………………(40)
Listofquotedstandards…………………(41)
人人文庫
1Generalprovisions
1.0.1Thiscodeispreparedwithaviewtostandardizingtheconstructionandqualityacceptanceof
micro-assemblingproductionlineequipmentinstallationengineering,guaranteetheinstallationquality
andreliableoperationofthemicro-assemblingline,andpromotingthedevelopmentofequipment
installationtechnologyinthisfield.
1.0.2Thiscodeisappliedtoconstruction,debugging,commissioningandacceptance,whilethemicro-
assemblingproductionlineisnewlybuild,reconstructedandextended.
1.0.3Inadditiontoimplementingthiscode,theconstructionandacceptanceofprocessequipmentfor
micro-assemblingproductionlineshallmeettherulesofnationalcurrentrelevantstandards.
專用
人人文庫
2Terms
2.0.1Micro-assembling
Thetechnologyofformingadvancedmicroelectronicmoduleisassemblyofvariousmicroparts
andcomponents,integratedcircuitchipsandchipcomponentswhichconsistofelectroniccircuitsonthe
highdensitymultilayerinterconnectedsubstratebysurfacemountingandinterconnectionprocess.
2.0.2Multilayersubstrate
Substratewithembeddedconductorlayersforimplementingcomplexinterconnectioncircuits.
2.0.3Thickfilm
Filmwhichisdepositedonthesubstratebyscreenprintingprocessandsinteredatthehighest
temperatureofabout850℃.
2.0.4Lowtemperatureco-firedceramic(LTCC)multilayersubstrate
Aftermultipleunsinteredflexiblegreentapes,ofwhichthickfilmconductorsandresistancefigures
(includinginterconnectedlinesthatconsistofthesefigures,embeddedpassivecomponent,etc.)are
printedonthesurface,andwhichinterlaminarinterconnectedmetallized專用holesaremanufactured,are
stackedinorder,laminatingthemintoawholestructurebyheatingandpressingsimultaneously.By
sinteringthegreentapesandthickfilmelectronicpasteatamaximumtemperatureofabout850℃
(sinteringfurnace)rigidandhighdensitymultilayerinterconnectedsubstratesareformedfinally.
2.0.5Thinfilmmultilayersubstrate
Multilayerinterconnectedsubstratewhichoverlappedandinterconnectedmultilayerthinfilm
conductorandinterlaminarinsulatingfilmaremanufacturedoninsulatingsubstrateorsiliconwaferwith
filmformingprocessesofvacuumevaporation,sputtering,chemicalvapordepositionetc.and
technologyofphotoetching,etchingetc.
2.0.6Greentape
Atape-likeflexiblethinceramicmaterialwithsmoothsurface,uniformtextureandcertainstrength
whichismanufacturedbycastingprocess.
2.0.7Packaging
Microelectronictechnologyofinterconnection,protectionandheatdissipationforelectronicdevices
(microcircuitsormodule),whichmainlyincludeplasticpackaging,ceramicpackagingandmetal
packaging.人人文庫
2.0.8Processinspection
Theprocessofmeasuringandinspectingtheproducts'shape,size,positionanditsmechanical,
physical,chemicalcharacteristicsandsoonbytools,instrumentsorequipmentofmeasuringortesting,
andcomparingwiththetechnologyrequirementsofproducts.Itistheinspectiontechniquetoevaluate
theconformityofprocedureorstateofproductcompletionwiththeruleofdesignandprocedure
documents.
3Basicrequirements
3.1Constructionconditions
3.1.1Thecleanroomshallbeinaccordancewiththefollowingrequirementsbeforeinstallationofthe
micro-assemblingequipment:
1Acceptanceofemptyroomshallbequalifiedandtheairconditioningsystemshalloperate
continuouslyandnormallyformorethan24h.
2Temperatureshouldbe20℃to26℃.
3Relativehumidityshouldbe30%to70%.
4Load-bearingcapabilityoffloorshallmeetrequirementsofequipment.
5Clearanceheightshallmeetinstallationrequirementsofequipment.
6Bodypurificationfacilityattheroomentranceshallhavebeeninoperation.
7Theequipmententryshallbeavailable.
8Firefightingfacilitiesshallhavebeenpassedspecialacceptanceandcanbeenabled.
9Theantistaticfacilitiesintheantistaticworkingareashallhavepassed專用thetestandacceptance.
10Powersupply,gassource,watersourceandgroundingterminalshallbeavailableandin
accordancewithrequirements.
11Employeesafeevacuationchannelsshallbesetup.
3.1.2Theinstallationofmicro-assemblingequipmentshallhavethefollowingtechnicaldocuments:
1Equipmentinstallationplan.
2Equipmentpackinglist.
3Technicaldocumentsforinstallation,operation,maintenanceandinstallationtechnicalparameters
ofequipmentprovidedbyequipmentmanufacturers.
3.1.3Theconstructionpersonnelshallenterthepurificationroomwithapassportofenteringtheclean
area.Specialtypesofworkersshallbecertificatedinaccordancewithrelevantprovisions.
3.1.4Equipmentinstallationandhook-upengineeringmaterialsshallmeettherelevantrequirements
ofcurrentnationalstandardGB50472CodeforDesignofElectronicIndustryCleanRoom.
3.1.5Equipmentandtoolsusedinconstructionshallmeettherelevantrequirementsofcurrent
nationalstandardGB50467CodeforConstructionandAcceptanceofMicro-electronicsManufacturing
EquipmentInstallation人人文庫Engineering.
3.2Equipmentunpacking
3.2.1Equipmentshallbeunpackedwithjointparticipationofresponsiblepersonnelofsupplyunit,
constructionunitanddevelopmentunit.Unpackingofimportedequipmentforstatutorycommodity
inspectionshallbeattendedbycustomsinspectionrepresentatives.
3.2.2Packingcaseshallbecheckedfordamageanddamagedegreebeforeequipmentunpacking,anti-
vibrationandanti-tiltmarksshallnotbeabnormal.
3.2.3Equipmentunpackingshallbeinaccordancewiththefollowingrequirements:
1Packingcaseshallbeunpackedbyeffectivetoolsandfollowingreasonableproceduresunder
thepremiseofcausingnodamagetotheequipmentanditsaccessoriesinthecase.
2Thetopcoverofthecaseshallberemovedfirstafterremovingroofnailsorrelevantfasteners.
3Afterremovingthetopcoverandpart(orall)sidecoversofthecase,smallpartsandaccessories
shallberemovedfromthecasepriortomainframe,andthencarryouttheremainingworkofunpacking.
3.2.4Afterequipmentunpacking,packingmaterialshallberemovedintime.
3.2.5Afterequipmentunpacking,intactnessofinternalequipment,packageandaccessoriesshallbe
checked,anyabnormalsituationshallhaveimagerecordimmediatelyandputforwardtheprocessing
advice.
3.2.6Afterequipmentunpacking,equipmentshallbecheckedinaccordancewiththefollowing
requirements:
1Typespecificationontheequipmentnameplateshallbeconsistentwithequipmentlistor
technicalparameterlist.
2Iftheexteriorandprotectivepackageofequipmenthavedefects,damageorrustiness,itshallbe
putforwardandrecordedintime.Formanufacturingdefects,notifytheequipmentmanufacturerto
researchthehandlingmethod.
3Checkwhethertheparts,components,tools,accessories,subsidiarymaterials,andother
technicaldocumentsarecompleteonebyoneaccordingtothepackinglist,andshallmakearecord.
4Afterunpackingandinspectingtheequipment,theparts,accessories專用,accessorymaterials,tools
andfixtures,andtechnicaldocumentsthatneednottoinstallorbeusedforinstallationshallbeputinto
thecustodyoftheuser.
3.2.7Inspectionrecordsshallbefilledinwhenunpackingequipment,thecontentandformatshallbe
inaccordancewiththosespecifiedinTableA.0.1ofthiscode.
3.3Equipmentmoving
3.3.1Equipmentmovinginmethodofliftingshallbeinaccordancewiththefollowingrequirements:
1Steelcableusedinliftingshallbeabletowithstandover10tofweight.
2Craneoperatorsshallbecertificated.
3Cablebindingpositionshallavoidinstrumentandfragilestructure.Theequipmentcenterof
gravityshallbepaidattentionwhenlifting,andpreventtheequipmentfromdumpingandfalling.
4Theliftingheightofequipmentshouldbesuitableforremovingtheouterbottompackaging.
5Liftingandloweringspeedshallbecontrolledwhenoperating,noimpactorcollisionshall
occur.
3.3.2Themechanical人人文庫facilitiesofforkliftsoraircushionsetc.shallbeusedwhenpositioninglarge-
scalemicro-assemblinglineproductionprocessequipmentintheroom.
3.3.3Thelengthoftwoforksshallexceed100mmofgravitycenterofequipmentwhenforkliftisused.
3.3.4Operationshallbesteadywhenmovingequipmentwithahydraulicloader.
3.3.5Movingequipmentwithaircushionshallbeinaccordancewiththefollowingrequirements:
1Aircushionsshallbeplacedundertheloadbeamatthebottomofequipment,andthenumberof
aircushionsforeachequipmentshallnotbelessthan4.
2Aircushionsshalltravelsteadilyafterinflating.Theheightofequipmentbottomfromthe
groundshallnotbelessthan2mm.
3.3.6Theprotectivemeasuresforthefloorshallbetakenwhenequipmentismovedintheroom.
3.4Equipmentinstallation
3.4.1Installationofmicro-assemblingequipmentshallbeinaccordancewiththefollowing
requirements:
1Full-openspaceofelectricboxandspaceofoperationandmaintenanceshallbereservedwhen
positioningtheequipment.
2Theprimarypipeandlinedistributionofpowersupply,gassource,watersourceandground
terminalsshallhavebeeninplace.
3Surfaceofequipmentshallbeprotectedduringinstallation.Sealingsurfaceshallnotbe
damagedorscratched.Installationofequipmentshallbefirmandreliable.Sunkscrewshallnotprotrude
overthesurfaceofconnectedparts.
4Whentheequipmenthasrequirementsofanti-vibrationcontrolorparticularload-bearing,
correspondingmeasuresofanti-vibrationorimprovementofload-bearingcapabilityshallbetaken.
5Hook-upofequipmentshallbecompletedbyprofessionalsinaccordancewithtechnical
requirementsofequipment.TheSS316Lstainlesssteelpipeshouldbeusedforthevacuumpipelineof
accessequipment.Pipingofpurewater,compressedair,etc.shouldbeconnectedwithequipmentby
PTFEandpolyurethanehoses.
3.4.2Directinstallationofmicro-assemblingequipmentonthefloorshall專用beinaccordancewiththe
followingrequirements:
1Basegasketshallbeplacedonthegroundfirst,andconfirmedthatbasicgasketcanevenly
supporttheequipment.
2Handshallnotbeplacedabovethebasegasketduringoperation.
3Ifequipmentisequippedwithbottombolts,eachbottomboltshallbeproperlyinstalledinits
screwhole.Aircushionsshallbeusedtomovetheequipment.
4Theequipmentshallbeleveledgraduallybyadjustingtheheightofanchorboltsortheeffective
thicknessofbasegasket,andensurethatthelocknutisgaplessandeachbottomboltisfixedtothe
correspondingbasegasketonthefloor.
3.4.3Directinstallationofmicro-assemblingequipmentontheplatformshallbeinaccordancewith
thefollowingrequirements:
1Operatingplatformshallbehorizontal,steadyandfirm.
2Antistaticmaterialshallbelaidontheplatformandeffectivelyconnectedtoantistatic
groundingsystemofroom.
3.4.4Horizontal人人文庫adjustmentofequipmentshouldusethecross-testleveltomeasure,andthe
equipmentwithhighprecisionrequirementsmayusetwobracket-typelevels.
3.4.5Groundingofmicro-assemblingequipmentshallbeeffectiveandreliable,andgroundingterminal
shallbefirmlyconnectedtogroundingsystemofcleanroom.Groundingresistanceofequipmentshall
notexceed4Ω;Groundingsystemshallmeettherelevantrequirementsofcurrentnationalstandard
GB50169CodeforConstructionandAcceptanceofGroundingConnectionElectricEquipment
InstallationEngineering.
3.4.6Aftertheequipmentisinplace,powerconfigurationofequipmentshallbecheckedbytechnicians.
3.4.7Recordofinstallationprojectshallbefilledinaftertheequipmentisinstalled,contentandformat
shallbeinaccordancewiththosespecifiedinTableA.0.2ofthiscode.
3.5Debuggingandcommissioningofequipment
3.5.1Debuggingandcommissioningofmicro-assemblingequipmentshallbeinaccordancewiththe
followingrequirements:
1Theequipmenthasbeeninstalledinplace.
2Allkindsofpowerhook-upsshallensurethattheconnectiontotheequipmentissealedand
firm,thevariousparametersofthepowershallmeettherequirementsoftheequipment.
3Compressedairandprocessgasshallbecleanedbeforepumpingintotheequipment.
3.5.2Wiringofmicro-assemblingequipmentshallbecheckedbeforeoperating.
3.5.3Safetyofmicro-assemblingequipmentshallbetestedtomeetrequirementsbeforeoperation.
3.5.4Inthebootstate,aclampammetershallbeusedtomeasurewhetherthevoltageandcurrent
meettherequirementsofequipment.
3.5.5Inthebootstate,theequivalentcontinuousAweightedsoundlevelatpersonneloperating
positionshouldnotbegreaterthan70dB.
3.5.6Equipmentshallcontinuouslyoperatewithoutfailurefor48h.Beforeandafterthecontinuous
operation,themainperformanceindicatorsofequipmentshallbetested.Theresultsshallmeetthe
technicalrequirementsofequipment.
3.5.7Thedebuggingandcommissioningrecordsofmicro-assembling專用equipmentshallbefilledinfor
thesinglecommissioningwhichiscompliedwiththerelevantprovisionsofChapters4to7ofthiscode.
ThecontentandformatoftherecordsshallbeinaccordancewiththosespecifiedinTableA.0.3.
人人文庫
4Installation,debuggingandcommissioningoflowtemperatureco-fined
ceramicandthickfilmsubstrateproductionprocessequipment
4.1Generalrequirements
4.1.1Lowtemperature
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年高速公路綠化帶養(yǎng)護(hù)服務(wù)協(xié)議版
- 2024砂碎石材料采購與環(huán)??萍紕?chuàng)新服務(wù)協(xié)議3篇
- 2024建筑設(shè)計(jì)合同設(shè)計(jì)方案與費(fèi)用
- 2024暑假工合同范本:暑期兼職員工服務(wù)條款3篇
- 2024版室內(nèi)水電布線與裝修承包合同書版B版
- 2024版高性能計(jì)算服務(wù)合同
- 2025年度生態(tài)恢復(fù)工程專用沙土供應(yīng)協(xié)議書3篇
- 2025年滬科版四年級(jí)語文下冊(cè)月考試卷
- 2025年粵教版選擇性必修3物理下冊(cè)階段測(cè)試試卷
- 二零二五年度大摩退出中金技術(shù)合作終止協(xié)議3篇
- 金朝的水利與社會(huì)經(jīng)濟(jì)
- 工程竣工保修期滿移交書
- 急診科烏頭堿中毒課件
- 2013天津中考滿分作文
- 高等數(shù)學(xué)同濟(jì)大學(xué)第7版 課后習(xí)題答案解析完整版
- 醫(yī)院安保人員錄用上崗管理辦法
- 單模光纜檢驗(yàn)報(bào)告
- 公共政策分析簡(jiǎn)答題
- 加熱爐溫度控制系統(tǒng)_畢業(yè)論文
- 微生物標(biāo)本送檢率低原因分析
- Q∕SY 1829-2015 抽油機(jī)用橡膠盤根驗(yàn)收規(guī)范
評(píng)論
0/150
提交評(píng)論