GB 51037-2014 GB51037-2014微組裝生產(chǎn)線工藝設(shè)備安裝工程施工及驗(yàn)收規(guī)范:英文_第1頁
GB 51037-2014 GB51037-2014微組裝生產(chǎn)線工藝設(shè)備安裝工程施工及驗(yàn)收規(guī)范:英文_第2頁
GB 51037-2014 GB51037-2014微組裝生產(chǎn)線工藝設(shè)備安裝工程施工及驗(yàn)收規(guī)范:英文_第3頁
GB 51037-2014 GB51037-2014微組裝生產(chǎn)線工藝設(shè)備安裝工程施工及驗(yàn)收規(guī)范:英文_第4頁
GB 51037-2014 GB51037-2014微組裝生產(chǎn)線工藝設(shè)備安裝工程施工及驗(yàn)收規(guī)范:英文_第5頁
已閱讀5頁,還剩46頁未讀 繼續(xù)免費(fèi)閱讀

付費(fèi)閱讀全文

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

專用

人人文庫

NATIONALSTANDARD

OFTHEPEOPLE'SREPUBLICOFCHINA

CODEFORCONSTRUCTIONANDACCEPTANCEOF

MICRO-ASSEMBLINGPRODUCTIONLINEPROCESS

EQUIPMENTINSTALLATIONENGINEERING

GB51037-2014

DevelopedbyTheMinistryofIndustryandInformationTechnologyof

thePeople'sRepublicofChina

ApprovedbyTheMinistryofHousingandUrban-Rural專用Developmentof

thePeople'sRepublicofChina

ImplementationDateMay1,2015

人人文庫

ChinaPlanningPress

Beijing2021

圖書在版編目(CIP)數(shù)據(jù)

GB51037-2014微組裝生產(chǎn)線工藝設(shè)備安裝工程施工

及驗(yàn)收規(guī)范:英文/中華人民共和國(guó)住房和城鄉(xiāng)建設(shè)部

組織編譯.--北京:中國(guó)計(jì)劃出版社,2021.12

ISBN978-7-5182-1415-0

Ⅰ.①G…Ⅱ.①中…Ⅲ.①微組裝—生產(chǎn)線—生產(chǎn)

工藝—設(shè)備安裝—工程施工—規(guī)范—中國(guó)—英文②微組裝

—生產(chǎn)線—生產(chǎn)工藝—設(shè)備安裝—工程驗(yàn)收—規(guī)范—中國(guó)

—英文Ⅳ.①TB4-65

中國(guó)版本圖書館CIP數(shù)據(jù)核字(2022)第010386號(hào)

ChineseeditionfirstpublishedinthePeople'sRepublicofChinain2014

EnglisheditionfirstpublishedinthePeople'sRepublicofChinain2021

byChinaPlanningPress

3rdFloor,CTower,GuohongBuilding專用

No.A11,Muxidi-Beili,XichengDistrict

Beijing,100038

PrintedinChinabyBeijingJingyintangGraphicPrintingCenter

?2014bytheMinistryofHousingandUrban-RuralDevelopmentof

thePeople'sRepublicofChina

Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor

byanymeans,graphic,electronic,ormechanical,includingphotocopying,recording,

oranyinformation人人文庫storageandretrievalsystems,withoutwrittenpermissionofthepublisher.

Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,

resold,hiredoutorotherwisecirculatedwithoutthepublisher'spriorconsentinanyformof

blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition

includingthisconditionbeingimposedonthesubsequentpurchaser.

ISBN978-7-5182-1415-0

中華人民共和國(guó)住房和城鄉(xiāng)建設(shè)部公告

2020年第129號(hào)

住房和城鄉(xiāng)建設(shè)部關(guān)于發(fā)布《微組裝生產(chǎn)線

工藝設(shè)備安裝工程施工及驗(yàn)收規(guī)范》等

11項(xiàng)工程建設(shè)標(biāo)準(zhǔn)英文版的公告

現(xiàn)批準(zhǔn)《微組裝生產(chǎn)線工藝設(shè)備安裝工程施工及驗(yàn)收規(guī)范》(GB51037-2014)、《電子工

業(yè)純水系統(tǒng)安裝與驗(yàn)收規(guī)范》(GB51035-2014)、《光纜生產(chǎn)廠工藝設(shè)計(jì)規(guī)范》(GB51067-

2014)、《光纖器件生產(chǎn)廠工藝設(shè)計(jì)規(guī)范》(51123-2015)、《電子工程防靜電設(shè)計(jì)規(guī)范》(專用50611-

GBGB

2010)、《防靜電工程施工與質(zhì)量驗(yàn)收規(guī)范》(GB50944-2013)、《天線工程技術(shù)規(guī)范》(GB50922-

2013)、《試聽室工程技術(shù)規(guī)范》(GB/T51091-2015)、《體育場(chǎng)建筑聲學(xué)技術(shù)規(guī)范》(GB/T50948-

2013)、《電子會(huì)議系統(tǒng)工程設(shè)計(jì)規(guī)范》(GB50799-2012)、《電子會(huì)議系統(tǒng)工程施工與質(zhì)量驗(yàn)收

規(guī)范》(GB51043-2014)英文版。工程建設(shè)標(biāo)準(zhǔn)英文版與中文版出現(xiàn)異議時(shí),以中文版為準(zhǔn)。

該11項(xiàng)工程建設(shè)標(biāo)準(zhǔn)英文版由住房和城鄉(xiāng)建設(shè)部組織中國(guó)計(jì)劃出版社有限公司出版發(fā)行。

中華人民共和國(guó)住房和城鄉(xiāng)建設(shè)部

2020年5月28日

人人文庫

AnnouncementoftheMinstryofHousingandUrban-Rural

DevelopmentofthePeople'sRepublicofChina

No.533

AnnouncementoftheMinistryofHousingandUrban-Rural

DevelopmentonPublishingNationalStandardof

CodeforConstructionandAcceptanceofMicro-assemblingProductionLine

ProcessEquipmentInstallationEngineering

CodeforConstructionandAcceptanceofMicro-assemblingProductionLineProcessEquipment

InstallationEngineeringhasbeenapprovedasanationalstandardwithaserialnumberofGB51037-

2014,andwillbeimplementedonMay1,2015.Inthiscode,Articles4.2.1(4),4.5.2(1),5.4.1(3),5.6.1

(3),5.7.1(5)7.7.2(3)專用.

andaremandatoryonesandmustbeimplementedstrictly

AuthorizedbytheResearchInstituteofStandardsandNormsofMinistryofHousingandUrban-

RuralDevelopmentofthePeople'sRepublicofChina,thiscodeispublishedanddistributedbyChina

PlanningPress.

MinistryofHousingandUrban-RuralDevelopmentofthePeople'sRepublicofChina

August27,2014

人人文庫

Foreword

ThiscodeisdevelopedbySinopecEngineeringIncorporationincooperationwithotherinvolved

organizationsaccordingtotherequirementsofDocumentJIANBIAO〔2010〕No.43issuedbythe

MinistryofHousingandUrban-RuralDevelopmentofthePeople'sRepublicofChina(MOHURD)—

“NoticeonPrintingandDistributing‘theDevelopmentandRevisionPlanofNationalEngineering

ConstructionStandardsin2010’”,thiscodeiscompiledandformulatedbyElectronicEngineering

StandardQuotaStationofChinaElectronicsStandardizationInstitute,the2ndResearchInstituteof

ChinaElectronicsTechnologyGroupandotherrelevantorganizations.

Basedontheinvestigationandresearch,thecompilationteamsummarizedthepracticalexperience,

absorbedthescientificresearchresultsinrecentyears,drewontheadvancedforeignexperiencewhichis

inlinewiththenationalconditionsofourcountry,andextensivelysolicitedpinionsfromthedomestic

relatedunitsondesign,productionandresearch.Andthecodewasfinalizedafterreview.

Thiscodeconsistsof8chaptersand1appendix,covering:generalprovisions;terms;basic

requirements;installation,debuggingandcommissioningoflowtemperature專用co-finedceramicandthick

filmsubstrateproductionprocessequipment;thinfilmsubstrateproductionprocessequipment

installation,debuggingandcommissioning;installation,debuggingandcommissioningofassembling

andpackagingprocessequipment;installation,debuggingandcommissioningofprocessinspection

equipment;engineeringacceptance,etc.

Theprovisionsprintedinboldtypearemandatoryonesandmustbeimplementedstrictly.

Thiscodeisunderthejurisdictionof,anditsmandatoryprovisionsareinterpretedbytheMinistry

ofHousingandUrban-RuralDevelopment.TheMinistryofIndustryandInformationTechnology

takescareoftheroutinemanagement,whilethe2ndResearchInstituteofChinaElectronics

TechnologyGroupCorporationisresponsiblefortheinterpretationoftechnicalspecifications.All

relevantorganizationsarekindlyinvitedtosummarizeandaccumulateactualexperienceswhen

implementingthiscode.Relevantcommentsandrecommendations,whenevernecessary,shallbe

submittedtothe2ndResearchInstituteofChinaElectronicsTechnologyGroupCorporation(Address:

No.115HepingSouthRoad,TaiyuanCity,ShanxiProvince,Postcode:030024)forfuturerevision.

ChiefDevelopmentOrganizations,Co-DevelopmentOrganizations,ChiefDrafters,Chief

Reviewers,Chief人人文庫TranslatorsandChiefTranslationReviewersofthiscode:

ChiefDevelopmentOrganizations:

ElectronicEngineeringStandardQuotaStationofChinaElectronicsStandardization

Institute

The2ndResearchInstituteofChinaElectronicsTechnologyGroup

Co-DevelopmentOrganizations:

The214thResearchInstituteofChinaNorthIndustriesGroupCorporation

The14thResearchInstituteofChinaElectronicsTechnologyGroup

The29thResearchInstituteofChinaElectronicsTechnologyGroup

The43rdResearchInstituteofChinaElectronicsTechnologyGroup

ChinaElectronicSystemEngineeringNo.2ConstructionCorporationLimited

TheITElectronicEleventhDesignandResearchInstituteScientificand

TechnologicalEngineeringCorporationLimited

The26thResearchInstituteofChinaElectronicsTechnologyGroup

ChinaElectronicsEngineeringDesignInstitute

ChiefDrafters:

CHAOYuqingHEZhongweiYANWeiDUBaoqiangGAONengwu

WANGZhengyiWANGKaiyuanZHENGBingxiaoLIXiaoxuan

QIAOHailingWANGGuipingLVQinHongHUANGWensheng

WUJianhua

ChiefReviewers:

WUXiangXUEChangliSHENXianfengCHENGKaiQIUYingxia

HULaipingLIYangxingHEChangfengZHANGYu

ChiefTranslators:

LIJingzhaoZHOULiDUBaoqiangZHANGXiaomingZHUZongjiu

ChiefTranslationReviewers:

LIAOYanlinSONGGuixiaYANGKegui專用

人人文庫

Contents

1Generalprovisions…………………(1)

2Terms…………………(2)

3Basicrequirements………………(3)

3.1Constructionconditions……………(3)

3.2Equipmentunpacking…………………(3)

3.3Equipmentmoving………………………(4)

3.4Equipmentinstallation…………………(5)

3.5Debuggingandcommissioningofequipment……………(6)

4Installation,debuggingandcommissioningoflowtemperatureco-finedceramicand

thickfilmsubstrateproductionprocessequipment………………(7)

4.1Generalrequirements……………………(7)

4.2Tapecaster……………(7)

4.3Blanker……………………………專用(8)

4.4Greentapepuncher……………………(8)

4.5Laserscribingmachine…………………(9)

4.6Viafillingmachine………………………(9)

4.7Screenprinter…………………………(10)

4.8Stackingmachine…………………………(10)

4.9Isostaticlaminator……………………(11)

4.10Hotcutter……………………………(12)

4.11Lowtemperatureco-finedceramicboxfurnace(LTCCboxfurnace)………(12)

4.12Thick-filmbeltfurnace……………(13)

4.13Laserresistortrimmer……………(13)

5Thinfilmsubstrateproductionprocessequipmentinstallation,debuggingand

commissioning………………………(15)

5.1Generalrequirements……………………(15)

5.2Magneticsputteringdepositionsystem…………………(15)

5.3Vacuumevaporative人人文庫copper-coatedmachine……………(16)

5.4Chemicalvapordepositionsystem………………………(17)

5.5Spincoatingandhotplatesystem…………(18)

5.6Exposuremachine……………………(19)

5.7Developingsystem……………………(19)

5.8Reactiveionetchingmachine……………(20)

5.9Chemicalmechanicalpolishingmachine…………………(21)

6Installation,debuggingandcommissioningofassemblingand

packagingprocessequipment……………………(23)

6.1Generalrequirements……………………(23)

6.2Dieattachingmachine……………………(23)

6.3Dieeutecticbonder………………(23)

6.4Eutecticoven………………………(24)

6.5Wirebonder………………………(25)

6.6Flipchipbonder………………………(25)

6.7Plasmacleaner……………………(26)

6.8Selectivespraycoatingmachine…………(26)

6.9Parallelseamwelder………………(26)

6.10Energystoragewelder…………………(27)

6.11Laserwelder……………………(28)

7Installation,debuggingandcommissioningofprocessinspectionequipment……(29)

7.1Generalrequirements…………………(29)

7.2Probetester………………………(29)

7.3Acousticscanner…………………(30)

7.43Dopticalprofiler………………………(30)

7.5Automaticopticalinspector……………(30)

7.6Laserthicknessgauge……………………(31)

7.7X-rayscanner……………(31)

7.8Chipshearing/wirepullingtester…………專用(32)

8Engineeringacceptance……………(33)

8.1Generalrequirements…………………(33)

8.2Handoveracceptance…………………(33)

8.3Completedacceptance…………………(34)

8.4Disposalofreject………………………(34)

AppendixARecordformsofacceptanceformicro-assemblingproductionlineprocess

equipmentinstallationengineering……………………(35)

Explanationofwordinginthiscode………………(40)

Listofquotedstandards…………………(41)

人人文庫

1Generalprovisions

1.0.1Thiscodeispreparedwithaviewtostandardizingtheconstructionandqualityacceptanceof

micro-assemblingproductionlineequipmentinstallationengineering,guaranteetheinstallationquality

andreliableoperationofthemicro-assemblingline,andpromotingthedevelopmentofequipment

installationtechnologyinthisfield.

1.0.2Thiscodeisappliedtoconstruction,debugging,commissioningandacceptance,whilethemicro-

assemblingproductionlineisnewlybuild,reconstructedandextended.

1.0.3Inadditiontoimplementingthiscode,theconstructionandacceptanceofprocessequipmentfor

micro-assemblingproductionlineshallmeettherulesofnationalcurrentrelevantstandards.

專用

人人文庫

2Terms

2.0.1Micro-assembling

Thetechnologyofformingadvancedmicroelectronicmoduleisassemblyofvariousmicroparts

andcomponents,integratedcircuitchipsandchipcomponentswhichconsistofelectroniccircuitsonthe

highdensitymultilayerinterconnectedsubstratebysurfacemountingandinterconnectionprocess.

2.0.2Multilayersubstrate

Substratewithembeddedconductorlayersforimplementingcomplexinterconnectioncircuits.

2.0.3Thickfilm

Filmwhichisdepositedonthesubstratebyscreenprintingprocessandsinteredatthehighest

temperatureofabout850℃.

2.0.4Lowtemperatureco-firedceramic(LTCC)multilayersubstrate

Aftermultipleunsinteredflexiblegreentapes,ofwhichthickfilmconductorsandresistancefigures

(includinginterconnectedlinesthatconsistofthesefigures,embeddedpassivecomponent,etc.)are

printedonthesurface,andwhichinterlaminarinterconnectedmetallized專用holesaremanufactured,are

stackedinorder,laminatingthemintoawholestructurebyheatingandpressingsimultaneously.By

sinteringthegreentapesandthickfilmelectronicpasteatamaximumtemperatureofabout850℃

(sinteringfurnace)rigidandhighdensitymultilayerinterconnectedsubstratesareformedfinally.

2.0.5Thinfilmmultilayersubstrate

Multilayerinterconnectedsubstratewhichoverlappedandinterconnectedmultilayerthinfilm

conductorandinterlaminarinsulatingfilmaremanufacturedoninsulatingsubstrateorsiliconwaferwith

filmformingprocessesofvacuumevaporation,sputtering,chemicalvapordepositionetc.and

technologyofphotoetching,etchingetc.

2.0.6Greentape

Atape-likeflexiblethinceramicmaterialwithsmoothsurface,uniformtextureandcertainstrength

whichismanufacturedbycastingprocess.

2.0.7Packaging

Microelectronictechnologyofinterconnection,protectionandheatdissipationforelectronicdevices

(microcircuitsormodule),whichmainlyincludeplasticpackaging,ceramicpackagingandmetal

packaging.人人文庫

2.0.8Processinspection

Theprocessofmeasuringandinspectingtheproducts'shape,size,positionanditsmechanical,

physical,chemicalcharacteristicsandsoonbytools,instrumentsorequipmentofmeasuringortesting,

andcomparingwiththetechnologyrequirementsofproducts.Itistheinspectiontechniquetoevaluate

theconformityofprocedureorstateofproductcompletionwiththeruleofdesignandprocedure

documents.

3Basicrequirements

3.1Constructionconditions

3.1.1Thecleanroomshallbeinaccordancewiththefollowingrequirementsbeforeinstallationofthe

micro-assemblingequipment:

1Acceptanceofemptyroomshallbequalifiedandtheairconditioningsystemshalloperate

continuouslyandnormallyformorethan24h.

2Temperatureshouldbe20℃to26℃.

3Relativehumidityshouldbe30%to70%.

4Load-bearingcapabilityoffloorshallmeetrequirementsofequipment.

5Clearanceheightshallmeetinstallationrequirementsofequipment.

6Bodypurificationfacilityattheroomentranceshallhavebeeninoperation.

7Theequipmententryshallbeavailable.

8Firefightingfacilitiesshallhavebeenpassedspecialacceptanceandcanbeenabled.

9Theantistaticfacilitiesintheantistaticworkingareashallhavepassed專用thetestandacceptance.

10Powersupply,gassource,watersourceandgroundingterminalshallbeavailableandin

accordancewithrequirements.

11Employeesafeevacuationchannelsshallbesetup.

3.1.2Theinstallationofmicro-assemblingequipmentshallhavethefollowingtechnicaldocuments:

1Equipmentinstallationplan.

2Equipmentpackinglist.

3Technicaldocumentsforinstallation,operation,maintenanceandinstallationtechnicalparameters

ofequipmentprovidedbyequipmentmanufacturers.

3.1.3Theconstructionpersonnelshallenterthepurificationroomwithapassportofenteringtheclean

area.Specialtypesofworkersshallbecertificatedinaccordancewithrelevantprovisions.

3.1.4Equipmentinstallationandhook-upengineeringmaterialsshallmeettherelevantrequirements

ofcurrentnationalstandardGB50472CodeforDesignofElectronicIndustryCleanRoom.

3.1.5Equipmentandtoolsusedinconstructionshallmeettherelevantrequirementsofcurrent

nationalstandardGB50467CodeforConstructionandAcceptanceofMicro-electronicsManufacturing

EquipmentInstallation人人文庫Engineering.

3.2Equipmentunpacking

3.2.1Equipmentshallbeunpackedwithjointparticipationofresponsiblepersonnelofsupplyunit,

constructionunitanddevelopmentunit.Unpackingofimportedequipmentforstatutorycommodity

inspectionshallbeattendedbycustomsinspectionrepresentatives.

3.2.2Packingcaseshallbecheckedfordamageanddamagedegreebeforeequipmentunpacking,anti-

vibrationandanti-tiltmarksshallnotbeabnormal.

3.2.3Equipmentunpackingshallbeinaccordancewiththefollowingrequirements:

1Packingcaseshallbeunpackedbyeffectivetoolsandfollowingreasonableproceduresunder

thepremiseofcausingnodamagetotheequipmentanditsaccessoriesinthecase.

2Thetopcoverofthecaseshallberemovedfirstafterremovingroofnailsorrelevantfasteners.

3Afterremovingthetopcoverandpart(orall)sidecoversofthecase,smallpartsandaccessories

shallberemovedfromthecasepriortomainframe,andthencarryouttheremainingworkofunpacking.

3.2.4Afterequipmentunpacking,packingmaterialshallberemovedintime.

3.2.5Afterequipmentunpacking,intactnessofinternalequipment,packageandaccessoriesshallbe

checked,anyabnormalsituationshallhaveimagerecordimmediatelyandputforwardtheprocessing

advice.

3.2.6Afterequipmentunpacking,equipmentshallbecheckedinaccordancewiththefollowing

requirements:

1Typespecificationontheequipmentnameplateshallbeconsistentwithequipmentlistor

technicalparameterlist.

2Iftheexteriorandprotectivepackageofequipmenthavedefects,damageorrustiness,itshallbe

putforwardandrecordedintime.Formanufacturingdefects,notifytheequipmentmanufacturerto

researchthehandlingmethod.

3Checkwhethertheparts,components,tools,accessories,subsidiarymaterials,andother

technicaldocumentsarecompleteonebyoneaccordingtothepackinglist,andshallmakearecord.

4Afterunpackingandinspectingtheequipment,theparts,accessories專用,accessorymaterials,tools

andfixtures,andtechnicaldocumentsthatneednottoinstallorbeusedforinstallationshallbeputinto

thecustodyoftheuser.

3.2.7Inspectionrecordsshallbefilledinwhenunpackingequipment,thecontentandformatshallbe

inaccordancewiththosespecifiedinTableA.0.1ofthiscode.

3.3Equipmentmoving

3.3.1Equipmentmovinginmethodofliftingshallbeinaccordancewiththefollowingrequirements:

1Steelcableusedinliftingshallbeabletowithstandover10tofweight.

2Craneoperatorsshallbecertificated.

3Cablebindingpositionshallavoidinstrumentandfragilestructure.Theequipmentcenterof

gravityshallbepaidattentionwhenlifting,andpreventtheequipmentfromdumpingandfalling.

4Theliftingheightofequipmentshouldbesuitableforremovingtheouterbottompackaging.

5Liftingandloweringspeedshallbecontrolledwhenoperating,noimpactorcollisionshall

occur.

3.3.2Themechanical人人文庫facilitiesofforkliftsoraircushionsetc.shallbeusedwhenpositioninglarge-

scalemicro-assemblinglineproductionprocessequipmentintheroom.

3.3.3Thelengthoftwoforksshallexceed100mmofgravitycenterofequipmentwhenforkliftisused.

3.3.4Operationshallbesteadywhenmovingequipmentwithahydraulicloader.

3.3.5Movingequipmentwithaircushionshallbeinaccordancewiththefollowingrequirements:

1Aircushionsshallbeplacedundertheloadbeamatthebottomofequipment,andthenumberof

aircushionsforeachequipmentshallnotbelessthan4.

2Aircushionsshalltravelsteadilyafterinflating.Theheightofequipmentbottomfromthe

groundshallnotbelessthan2mm.

3.3.6Theprotectivemeasuresforthefloorshallbetakenwhenequipmentismovedintheroom.

3.4Equipmentinstallation

3.4.1Installationofmicro-assemblingequipmentshallbeinaccordancewiththefollowing

requirements:

1Full-openspaceofelectricboxandspaceofoperationandmaintenanceshallbereservedwhen

positioningtheequipment.

2Theprimarypipeandlinedistributionofpowersupply,gassource,watersourceandground

terminalsshallhavebeeninplace.

3Surfaceofequipmentshallbeprotectedduringinstallation.Sealingsurfaceshallnotbe

damagedorscratched.Installationofequipmentshallbefirmandreliable.Sunkscrewshallnotprotrude

overthesurfaceofconnectedparts.

4Whentheequipmenthasrequirementsofanti-vibrationcontrolorparticularload-bearing,

correspondingmeasuresofanti-vibrationorimprovementofload-bearingcapabilityshallbetaken.

5Hook-upofequipmentshallbecompletedbyprofessionalsinaccordancewithtechnical

requirementsofequipment.TheSS316Lstainlesssteelpipeshouldbeusedforthevacuumpipelineof

accessequipment.Pipingofpurewater,compressedair,etc.shouldbeconnectedwithequipmentby

PTFEandpolyurethanehoses.

3.4.2Directinstallationofmicro-assemblingequipmentonthefloorshall專用beinaccordancewiththe

followingrequirements:

1Basegasketshallbeplacedonthegroundfirst,andconfirmedthatbasicgasketcanevenly

supporttheequipment.

2Handshallnotbeplacedabovethebasegasketduringoperation.

3Ifequipmentisequippedwithbottombolts,eachbottomboltshallbeproperlyinstalledinits

screwhole.Aircushionsshallbeusedtomovetheequipment.

4Theequipmentshallbeleveledgraduallybyadjustingtheheightofanchorboltsortheeffective

thicknessofbasegasket,andensurethatthelocknutisgaplessandeachbottomboltisfixedtothe

correspondingbasegasketonthefloor.

3.4.3Directinstallationofmicro-assemblingequipmentontheplatformshallbeinaccordancewith

thefollowingrequirements:

1Operatingplatformshallbehorizontal,steadyandfirm.

2Antistaticmaterialshallbelaidontheplatformandeffectivelyconnectedtoantistatic

groundingsystemofroom.

3.4.4Horizontal人人文庫adjustmentofequipmentshouldusethecross-testleveltomeasure,andthe

equipmentwithhighprecisionrequirementsmayusetwobracket-typelevels.

3.4.5Groundingofmicro-assemblingequipmentshallbeeffectiveandreliable,andgroundingterminal

shallbefirmlyconnectedtogroundingsystemofcleanroom.Groundingresistanceofequipmentshall

notexceed4Ω;Groundingsystemshallmeettherelevantrequirementsofcurrentnationalstandard

GB50169CodeforConstructionandAcceptanceofGroundingConnectionElectricEquipment

InstallationEngineering.

3.4.6Aftertheequipmentisinplace,powerconfigurationofequipmentshallbecheckedbytechnicians.

3.4.7Recordofinstallationprojectshallbefilledinaftertheequipmentisinstalled,contentandformat

shallbeinaccordancewiththosespecifiedinTableA.0.2ofthiscode.

3.5Debuggingandcommissioningofequipment

3.5.1Debuggingandcommissioningofmicro-assemblingequipmentshallbeinaccordancewiththe

followingrequirements:

1Theequipmenthasbeeninstalledinplace.

2Allkindsofpowerhook-upsshallensurethattheconnectiontotheequipmentissealedand

firm,thevariousparametersofthepowershallmeettherequirementsoftheequipment.

3Compressedairandprocessgasshallbecleanedbeforepumpingintotheequipment.

3.5.2Wiringofmicro-assemblingequipmentshallbecheckedbeforeoperating.

3.5.3Safetyofmicro-assemblingequipmentshallbetestedtomeetrequirementsbeforeoperation.

3.5.4Inthebootstate,aclampammetershallbeusedtomeasurewhetherthevoltageandcurrent

meettherequirementsofequipment.

3.5.5Inthebootstate,theequivalentcontinuousAweightedsoundlevelatpersonneloperating

positionshouldnotbegreaterthan70dB.

3.5.6Equipmentshallcontinuouslyoperatewithoutfailurefor48h.Beforeandafterthecontinuous

operation,themainperformanceindicatorsofequipmentshallbetested.Theresultsshallmeetthe

technicalrequirementsofequipment.

3.5.7Thedebuggingandcommissioningrecordsofmicro-assembling專用equipmentshallbefilledinfor

thesinglecommissioningwhichiscompliedwiththerelevantprovisionsofChapters4to7ofthiscode.

ThecontentandformatoftherecordsshallbeinaccordancewiththosespecifiedinTableA.0.3.

人人文庫

4Installation,debuggingandcommissioningoflowtemperatureco-fined

ceramicandthickfilmsubstrateproductionprocessequipment

4.1Generalrequirements

4.1.1Lowtemperature

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論