已閱讀5頁,還剩8頁未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1 Rotor Brake A mechanical breaking system is besides the aerodynamic breaking function of the rotor an unavoidable component of a wind turbine. It is part of the mechanical drive train. The first task is to keep the rotor of a wind turbine in position when it is at a standstill. Locking the rotor is a must for servicing and repair work and is generally common practice during normal down times. Moreover, most turbines have locking bolts between rotor hub and nacelle for bridging extended periods of standstill and for servicing and repair work. The rotor can thus be secured in one or more positions. Rotor brakes are almost always disk brakes. Suitable disk brakes can frequently be adopted cost-effectively from existing production runs intended for other machines or vehicles .Against this background, the design of the rotor brake itself poses few problems. Nevertheless, the rotor brake presents the systems designer of a wind turbine with issues which have consequences for the entire system. The first and most important question is, which task the rotor brake is to fulfill within the operating concept. In the simplest case, its role is restricted to a mere holding function during rotor standstill. In this case, the brake must be dimensioned for the required holding torque of the rotor during standstill. This is determined in accordance with the aerodynamic forces calculated to occur at the assumed maximum wind speeds (Chapt.6.3.2). Apart from its function as a pure rotor parking brake, the rotor brake can 2 also be dimensioned as a service brake. As long as the braking torque and braking power(thermal loading) can be absorbed, the mechanical rotor brake can be used as a second independent raking system in addition to aerodynamic rotor braking and the operational reliability of the wind turbine is considerably improved in this way. In small wind turbines, a mechanical rotor brake, which in cases of emergency prevents rotor runaway, has proved to be extraordinarily successful and is widely used today. With increasing turbine size, it becomes more and more difficult to meet this requirement. For a turbine with a rotor diameter of 60 to 80 m, the rotor brake takes on almost absurd dimensions if it is to brake the rotor torque and power during full-load operation. For this reason, the task of the rotor brake in large turbines is always restricted to the function of pure parking brake. Apart from the issue of the rotor brakes task with respect to operations, there is the question of where in the drive train the rotor brake is best installed. The alternatives are for the rotor brake to be on the” low-speed” or on the” high-speed” side of the gearbox. In most turbines, efforts to keep the brake disk diameter as small as possible lead to the rotor brake being installed on the high-speed shaft, i. e. between gearbox and generator(Fig. 8.31). Owing to the higher rotational speed, the torque is one or even two orders of magnitude lower than at the slower rotor shaft, depending on the gear ratio. However, mounting the brake on the high-speed shaft has at least two disadvantages. It is inferior from the point of view of safety, since the braking 3 function fails if the low-speed shaft or the gearbox break down. Moreover, the rotor must be held by the gears during a standstill. Gears react with increased wear of the tooth flanks to small oscillating movements, which are unavoidable in a stopped wind turbine due to air turbulence. In some turbines, it is attempted to solve this problem by no longer locking the rotor during standstill but by letting it” spin” at low speed. To avoid these disadvantages, the rotor brake was installed on the low-speed rotor shaft in some earlier systems. In small wind turbines a fully effective operating brake can be implemented with justifiable effort on the low-speed side, as long as design of the rotor shaft bearing assembly does not present an obstacle. The rotor brake on the low-speed side was a common feature of many earlier stall-controlled Danish wind turbines up to a power rating of about 100 kW in the Eighties. At that time it was considered to be an extra safety element even though the rotor brake was only designed as a parking brake. Installing the rotor brake on the slow side is much more problematic in large wind turbines, however. Even a parking brake already assumes a considerable size (Fig. 8.32).These disadvantages have led to the rotor brake being arranged on the high-speed side behind the gearbox in almost all new systems. 8.8 Gearbox The conversion of the greatly differing rotational speeds of the rotor and the electric generator has given the designers of the first wind turbines many headaches. This situation led to costly low-speed generator designs and to 4 hydraulic or pneumatic transmission systems to the generator (Chapt.8.1).Aerodynamicists made efforts to drive the rotor speed as high as possible in order to lower the gear ratio. It was assumed that costs would also increase considerably with increasing gear ratios, so that the development of rotors with extremely high tip-speed ratios was pushed forward. This situation has changed with the progress which has been made in gearbox technology. Today, high-performance gearboxes with gear ratios of up to 1:100 and more are available. In many areas of mechanical engineering, gearboxes are used which are suitable for deployment in wind turbines, as regards their technical concept, their efficiency and their operating life. The gearbox for the wind turbine has become a” vendor-supplied component”, which, with certain adaptations, can be taken from the standard product range of the gearbox manufacturers. Regardless of this favorable situation, the gearbox has been and still is a source of failures and defects in many wind turbines. The cause of these “gearbox problems” is not so much the gearbox itself, rather the correct dimensioning of the gearbox with regard to the load spectrum. In wind turbines, it is easy to underestimate the high dynamic loads to which the gearbox is subjected. Thus, in the early phase, many turbines had gearboxes which were undersized. Having learned their lessons, successful manufacturers equipped their turbines with ever stronger gearboxes and thus, in the course of development, empirically arrived at the right dimension. 5 8.8.1Gearbox Configurations Toothed-wheel gearboxes are constructed in two different forms. One is the parallel shaft or spur-gear system, the other is the technically more elaborate planetary gearing. The gear ratio per single reduction is limited, so that the difference in diameter between the small and the large wheel does not become too unfavorable. Parallel-shaft-gear stages are built with a gear ratio of up to 1 :5, whereas planetary stages have a gear ratio of up to 1 : 12. Wind turbines generally require more than one stage. Fig. 8.33 shows what effects different designs have on gearbox size, mass and relative cost 11. It is noteworthy that the three-stage planetary design has only a fraction of the overall mass of a comparable parallel shaft system. The relative costs are reduced to about one half. In the megawatt power class, the multi-stage planetary gearbox is, therefore, clearly superior. In smaller power classes, the comparison is not quite as unambiguous. In the range up to about 500 kW, parallel-shaft gear designs are often preferred for cost reasons. Small wind turbines are equipped with parallel-shaft gear systems.Theprevailingmodels are two-stage gearboxes which are commercially available from numerous manufacturers as modified universal transmissions (Fig. 8.34). In larger wind turbines, the planetary design definitely prevails. For outputs of several megawatts, two- or three-stage models are used (Fig. 8.35). Large gearboxes of this type are used, for example, in ship-building and several other 6 fields of mechanical engineering, so that suitable gearboxes for large wind turbines can be derived from these production sources. Gearboxes with one planetary stage and two additional parallel-shaft stages are used in many late-model turbines (Fig. 8.36).With the additional parallel shaft, the primary and secondary shafts are no longer coaxial. This has the advantage that a hollow through shaft can be implemented more easily. In this way, power supply lines supplying power to the blade pitch drive, as well as measurement and control signals for the rotor, can be routed through the gearbox. In larger gearboxes, an auxiliary rotor drive is frequently flanged to the gearbox housing. Using this electric motor, the rotor can be turned slowly. Such an auxiliary unit is indispensable for assembly and maintenance work in large rotors. Gearbox lubrication is usually carried out via a central oil supply in the nacelle. As a rule, it also contains an oil cooler and a filter. In spite of indisputable advances having been achieved in the durability of the gearboxes, there is still “trouble with the gears” being experienced even in the latest wind turbines. Although it is possible to adapt gearboxes for wind turbines from other types of machine, they are subject to special demands which are often not encountered in other applications. Much negative experience in recent years has provided important insights into this issue: Special attention must be devoted to the smooth running of the tooting. Particularly prominent gear meshing frequencies can cause resonances in the drive train.“Cheap” transmissions with simple tooting are unsuitable for use in 7 wind turbines. Oil leaks in the transmission are a particular problem. Labyrinth seals have proven more reliable than slipping type seals. In many cases, the housing flanges also showed leaks after some time. A box design with a top flange is apparently more advantageous than gearbox housings with flanges on the input and output side. The quality of the lubrication has been found to be a decisive factor for the service life of the gearbox. Oil temperatures which are too high cause just as much damage as does contamination in the oil. Oil coolers and filters are indispensible for large gearboxes ands is the careful observance of oil change intervals. The stiffness of the gearbox housing is an important criterion for its service life if the housing is integrated into the static design of the nacelle. Apart from these constructional measures, of course, the correct dimensioning has a decisive influence. 8 風(fēng)機(jī)剎車裝置 機(jī)械制動(dòng)裝置作為主傳動(dòng)鏈的一部分,同具有氣動(dòng)剎車功能的轉(zhuǎn)子一樣,是風(fēng)力發(fā)電機(jī)一個(gè)不可或缺的組成部分。其首要任務(wù)是當(dāng)風(fēng)機(jī)停轉(zhuǎn)時(shí),使風(fēng)機(jī)轉(zhuǎn)子處于適當(dāng)?shù)奈恢谩T诰S修工作的過程中,鎖定主軸是必須的,而且在正常的停工期間,鎖定主軸也是慣常的做法。更為重要的是,為了渡過持續(xù)的主軸停轉(zhuǎn)時(shí)期以及維修工作的進(jìn)行,大多數(shù)風(fēng)機(jī)都會(huì)在輪轂和機(jī)艙之間安裝鎖緊螺栓,從而使主軸在一個(gè)或者多個(gè)位置得到保護(hù)。 主軸剎車通常采用盤式剎車,適當(dāng)?shù)谋P剎可以頻繁采用為其它的機(jī)器或裝置設(shè)計(jì)的現(xiàn)存的生產(chǎn)線,這樣就可以節(jié)約成本。在這樣的背景 下,主軸剎車的設(shè)計(jì)本身不會(huì)產(chǎn)生很多問題。然而,主軸剎車也會(huì)給風(fēng)機(jī)系統(tǒng)的設(shè)計(jì)者帶來一些問題,而這些問題可能給整個(gè)系統(tǒng)帶來一些后果。 最為重要的問題是,在經(jīng)營(yíng)理念之內(nèi),剎車裝置要完成哪項(xiàng)任務(wù)。在最簡(jiǎn)單的情況下,在主軸停轉(zhuǎn)的情況下,剎車裝置的尺寸必須滿足所需的支持轉(zhuǎn)矩。這是由假設(shè)風(fēng)速達(dá)到最大時(shí)所計(jì)算的空氣動(dòng)力所決定的(第 6.3.2 節(jié))。 剎車裝置除了單純地具有主軸駐車制動(dòng)功能外,尺寸合適時(shí),其也可以作為停車制動(dòng)裝置。只要制動(dòng)力矩和制動(dòng)力(熱負(fù)載下)能夠被吸收,主軸機(jī)械剎車也可以用作除了氣動(dòng)主軸剎車外的第二獨(dú)立剎車 系統(tǒng),這樣一來,風(fēng)機(jī)的運(yùn)作可靠性得到大幅提高。對(duì)于小型風(fēng)機(jī),在緊急情況下,主軸機(jī)械剎車會(huì)防止主軸失控,這一點(diǎn)被證實(shí)是非常成功的,并得到了廣泛的應(yīng)用。 隨著風(fēng)機(jī)尺寸的增大,這一需求會(huì)越來越難以得到滿足。對(duì)于主軸直徑為 60 米到80 米的風(fēng)機(jī)來說,如果是在滿載運(yùn)轉(zhuǎn)期間制動(dòng)主軸轉(zhuǎn)矩和主軸功率,主軸剎車裝置幾乎承擔(dān)了離譜的規(guī)模。因此,在大型風(fēng)機(jī)中主軸剎車裝置的作用總是被限制在單純的進(jìn)行駐車制動(dòng)的上。 除了主軸剎車裝置的運(yùn)轉(zhuǎn)任務(wù)的問題外的另一個(gè)問題是,剎車裝置安裝在主傳動(dòng)鏈的哪個(gè)位置是最合適的。兩種可以選擇的方案分別是安 裝在齒輪箱的低速軸和高速軸。在大多數(shù)的風(fēng)機(jī)中,為了使得剎車盤的直徑盡可能地小,常將剎車裝置安裝在高速軸上,比如安裝在如齒輪箱和發(fā)電機(jī)之間(圖 8.31)。根據(jù)齒輪的傳動(dòng)比,由于轉(zhuǎn)速較高,轉(zhuǎn)矩會(huì)比在低速軸上低一個(gè)甚至兩個(gè)數(shù)量級(jí)。 然而,將剎車裝置安裝在高速軸上至少有兩點(diǎn)缺點(diǎn)。由于如果低速軸或者齒輪箱出現(xiàn)故障時(shí),剎車功能就會(huì)失效,所以從安全的角度上,這種方案是處于劣勢(shì)的。再者,在主軸停轉(zhuǎn)的過程中,其必須由齒輪支撐。隨著齒輪齒側(cè)的逐漸磨損,齒輪會(huì)產(chǎn)生一些小的震動(dòng),由于空氣擾動(dòng),對(duì)于一個(gè)一個(gè)停止工作的風(fēng)機(jī)來說,這一點(diǎn) 是不可避免的。在有些風(fēng)機(jī)中,為了試圖解決這一問題,主軸停轉(zhuǎn)時(shí),不再鎖定主軸,而是允許它在低速下轉(zhuǎn)動(dòng)。為了避免以上缺點(diǎn),早期的主軸剎車系統(tǒng)被安裝在低速軸上。在小型風(fēng)機(jī)中, 9 只要主軸軸承裝置的設(shè)計(jì)不會(huì)出現(xiàn)問題,也可以通過無可非議的努力在低速端實(shí)施一個(gè)完全有效可操作的剎車方案。 80 年代,丹麥許多功率高達(dá) 100kw 的失速控制型風(fēng)機(jī)普遍采用主軸剎車安裝在低速軸的方案。那是,即使主軸剎車裝置僅僅被設(shè)計(jì)為駐車剎車裝置,這一方案也被看作是一個(gè)額外的安全因素。然而,在大型風(fēng)機(jī)中,將主軸剎車裝置安裝在低速軸是非常有爭(zhēng)議的。即使假 設(shè)剎車裝置有一個(gè)相當(dāng)大的尺寸(圖 8.32)。在幾乎所有新的系統(tǒng)中,這些缺點(diǎn)已經(jīng)引導(dǎo)主軸剎車裝置被安裝在齒輪箱后部的高速軸上。 圖 8.31N
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 單位管理制度范例匯編員工管理篇十篇
- 單位管理制度呈現(xiàn)匯編【人事管理】
- 專題二 民主與法治(精講課件)中考道德與法治一輪復(fù)習(xí) 課件
- 【課件】寒假是用來超越的!課件 2024-2025學(xué)年高中上學(xué)期寒假學(xué)習(xí)和生活指導(dǎo)班會(huì)
- 第5單元 走向近代(高頻選擇題50題)(解析版)
- 中北大學(xué)課件電工技術(shù)
- 《皮膚性病學(xué)疥瘡》課件
- 《電子產(chǎn)品技術(shù)文件》課件
- 母親節(jié) 愛的呈現(xiàn)
- 汽車行業(yè)洞察與展望
- (高清版)TDT 1053-2017 農(nóng)用地質(zhì)量分等數(shù)據(jù)庫(kù)標(biāo)準(zhǔn)
- 小學(xué)道德與法治課程標(biāo)準(zhǔn)與教材研究 課件 第七章 法治教育
- 聯(lián)合辦公協(xié)議書范本
- 高中數(shù)學(xué)家長(zhǎng)會(huì)課件:夯實(shí)數(shù)學(xué)基礎(chǔ)培養(yǎng)數(shù)學(xué)思維
- 2024年中國(guó)遠(yuǎn)洋海運(yùn)集團(tuán)招聘筆試參考題庫(kù)附帶答案詳解
- 2024年貴州能源集團(tuán)電力投資有限公司招聘筆試參考題庫(kù)附帶答案詳解
- 生殖免疫學(xué)教案課件
- 沙糖桔互聯(lián)網(wǎng)創(chuàng)業(yè)計(jì)劃書
- 胃結(jié)石演示課件
- 書法知識(shí)之章法布局
- 2023乙型肝炎病毒標(biāo)志物臨床應(yīng)用專家共識(shí)(完整版)
評(píng)論
0/150
提交評(píng)論