1、混凝土工程concrete works一、材料袋裝水泥bagged cement散裝水泥bulk cement砂 sand骨料 aggregate商品混凝土commercial concrete現(xiàn)澆混凝土concrete-in-situ預制混凝土precast concrete預埋件embedment( fit 安裝)外加劑admixtures抗?jié)B混凝土waterproofing concrete石場aggregate quarry墊塊spacer二、施工機械及工具攪拌機mixer振動器vibrator電動振動器electrical vibrator振動棒vibratorbar抹子( stee
2、l wood ) trowel磨光機glasser混凝土泵送機concrete pump橡膠圈rubber ring夾子 clip混凝土運輸車mixer truck自動攪拌站auto-batching plant輸送機 conveyor塔吊tower crane汽車式吊車motor crane鏟子shovel水槍jetting water橡膠輪胎rubber tires布袋cloth-bags塑料水管plastic tubes噴水霧 spray water fog三、構件及其他專業(yè)名稱截面尺寸section size ( section dimension )混凝土梁concrete gird
3、er簡支梁 simple supported beam挑梁cantilever beam懸挑板cantileveredslab檐板eaves board封口梁joint girder翻梁upstand beam樓板floor slab空調(diào)板AC board飄窗bay window ( suspending window )振搗vibration串筒a chain of funnels混凝土施工縫concrete joint水灰比 ratio of water and cement砂率 sand ratio大體積混凝土large quantity of pouring混凝土配合比concrete
4、 mixture rate硬化中 )混凝土硬化hardening of concrete(in a hardening process規(guī)定時間regulated period質(zhì)保文件quality assurance program設計強度design strength永久工程permanent works臨時工程temporary works四、質(zhì)量控制及檢測不符合規(guī)格的non-standard有機物organic matters粘土 clay含水率moisture content ( watercontent )中心線central line安定性soundness ( good soun
5、dness優(yōu)良的安定性)坍落度 slump (the concrete with 18mm ± 20mm slump)混凝土養(yǎng)護concrete curing標養(yǎng)混凝土試件standard curing concrete test sample同條件混凝土試件field-cure specimen收縮 shrinkage初凝時間initial setting time終凝時間final setting time成品保護finished product protection混凝土試件concrete cube偏心受壓eccentric pressing保護層 concrete cove
6、r孔洞hole裂縫crack蜂窩honeycomb五、句子1, Usually we control the cement within 2%我們將水泥的誤差控制在2%2,Are there any pipe clogging happened during the concreting?澆筑混凝土中有堵管現(xiàn)象嗎?3,Will the pipe be worn out very fast?管道磨損很快嗎?4,This embedment is fixed at 1500mm from the floor and 350mm from the left edgeof the column. Wo
7、uld you measure the dimension by this meter?預埋件的位置在地面上1500mm離柱邊350mm我再量一下實際尺寸5, If the pouring depth is more than 2m, what measure will you adopt to avoid concrete collapsing or air holes inside?如果澆筑的深度超過2m,你將采用什么辦法來避免混凝土離析?6, Firstly we pour a layer of cement mortar around 50-100mmthick on the bott
8、om and then the concreting starts through the silo chain. The vibration will be done thoroughly layer and layer.首先我們在底部澆筑一層厚度為50-100mm厚的水泥砂漿,然后開始用串筒一次次地澆筑和振搗混凝土。7, Can you continue the concrete pouring after three hours suspension?混凝土在暫停3 小時之后,你可以接著澆筑嗎?8, The concrete surface will be chilled and cle
9、aned by the compressed air or jetting water, and also water and cement mortar are sprayed, then the new concrete can bepoured. The rebar should not be touched during vibration.混凝土表面要鑿毛,并用空壓機水槍的方法進行清洗,噴過水和水泥漿之后,可以開始新一輪的混凝土澆筑了。振搗中不能碰觸鋼筋。9, The construction joint in column should be horizontally made o
10、n top of foundation or under beams or slab, and in walls should be vertically made.柱的施工縫應水平設置,在基礎頂部或梁板下部,而墻的施工縫應垂直留置10, The vibrators should be inserted vertically in the last layer of concrete around 50mmdeep without touching formwork and rebar. The distance between each moving of vibrator should b
11、e of the vibrator affected radiation振動棒應垂直放在混凝土的最后一層,這層大概50mW,振動棒不得接觸模板和鋼筋,其每次振搗的距離應該是其影響半徑的倍11, We use the plastic sheets to cover and seal我們用塑料薄膜覆蓋劑封閉12, Brush some curing liquid on it 刷一些養(yǎng)護液上去13, The curing should last at least 7days養(yǎng)護必須持續(xù)7 天以上14, Hence to ascertain concrete strengths of structur
12、e is very important. This article states that the concrete strengths of structure body, specimens cured under standard condition and the same condition as structure are different each other although they are made of the same concrete mix.本文概述了混凝土標養(yǎng)試塊強度、同條件養(yǎng)護試塊強度與結(jié)構實體中的混凝土強度差異,指出標養(yǎng)混凝土試塊強度和同條件混凝土試塊強度并不能完全代表結(jié)構實體的混凝土強度15, This paper introduces the glassing technique for the building s cement floorwith the glasser and expounds the requirement of this technique for the concreteperformance, the construction machinery and principals, the technical standard ofconstruction, and the quality detectio
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- TY/T 2103-2024綠色體育場館運營評價
- NB/T 11548-2024立井井筒鉆注平行作業(yè)技術規(guī)范
- 乒乓球課題申報書
- 名師支部建設課題申報書
- 振興鄉(xiāng)村教育課題申報書
- 教學課題立項申報書模板
- 思政教研課題申報書模板
- 家庭研究專題課題申報書
- 課題項目申報書模版
- 個人購平房合同范本
- 《抖音營銷教程》課件
- 貴州省安順市2025屆高三年級第四次監(jiān)測考試2月語文試題及參考答案
- 2025屆山東核電校園招聘正式啟動筆試參考題庫附帶答案詳解
- 2025安徽蕪湖市運達軌道交通建設運營限公司招聘129人高頻重點模擬試卷提升(共500題附帶答案詳解)
- 2025年湖南科技職業(yè)學院高職單招職業(yè)技能測試近5年??及鎱⒖碱}庫含答案解析
- 2025屆江蘇省無錫市江陰實驗中學中考聯(lián)考歷史試題含解析
- 2024年安徽省高校分類考試對口招生語文試卷真題(含答案)
- 中國高血壓防治指南(2024年修訂版)解讀課件
- 公路工程標準施工招標文件(2018年版)
- DL∕T 5776-2018 水平定向鉆敷設電力管線技術規(guī)定
- (正式版)SH∕T 3548-2024 石油化工涂料防腐蝕工程施工及驗收規(guī)范
評論
0/150
提交評論