




版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、A2011.12CFCie stage 2版次日期狀態(tài)編寫校對審核批準修改-說明GUANGXICHENGGANG NUCLEARER SION PROJECT PHASE I (21000MW)廣西防城港核電廠一期(21000MW)工程DOC. NO.BLX17SVA004GJS045GNTITLE:題目SYSTEM DESIGN MANUAL AUXILIARYDISTRIBUTION SYSTEMCHAPTER 4 DESCRIPTION AND DEFINITION OF EQUIPMENT輔助蒸汽分配系統(tǒng)設計手冊第四章 設備的說明和定義參考電站編碼 ReferenceREV.C A T
2、 E G O R YA: Identical(+FCR,FCN,DEN,CIN,OROTHERS,IFANY)B: ModifiedC: NewIed by國 家 綜 合 甲 級號: A144004317GEDI省電力GUANGDONG ELECTRICER DESIGN INSTITUTE設計院內部編碼44-H0201S-J4110-04ernal Identification NumberThisis the property of GEDI. It must not be used, reproduced, transmitted or disclosed without the pri
3、or written permis of GEDI. 本文件之產權屬于 省電力。未獲我院 ,任何人不得擅自使用、 、傳遞或泄露該文件。批準:張鵬審核:校對:鄭軍編寫:胡琨CHAPTER 4 - DESCRIPTION AND DEFINITION OF EQUIPMENT4.1DESCRIPTIONRefer to the following diagrams and assoted systems, listed below.(i)Diagram of Auxiliary BL117SVA502GJS045DDDistribution System(ii)Diagram of Auxilia
4、ry BL217SVA503GJS045DD.Distribution SystemUnit 1Refer to the diagram BL117SVA502GJS045DD.Auxiliaryat 12 bar abs and 188 is fedo the distributionmain from the pipe to supplyTransformer system (STR). There is also anerconnectingauxiliaryfrom Auxiliary boilers(XCA) via the 0SVA.A prere reducing sion ob
5、tainfrom Auxiliary boilers (XCA) via the 0SVA inUnit 1 Conventional Island only and which reduprere and temperature to4.5 bar abs and 165 for distribution to the Nuclear Island and the Auxiliary Feedwater system (ASG) .The systemppd from the auxiliarydistribution system are described below.4.1.1Hot
6、Watroduction only for unit 1(SES)Depending on the prevailing climatic conditions heatingmay bed to the above calorifier at a rate of 2.0446t/hr, 12 bar abs and 188.Of thisall will return as condensate to the auxiliarydeaerator.4.1.2Feedwater Deaeratingand Gas Stripper (Unit 1) (ADG)A supply of heati
7、ng 12 bar abs and 188.ippd to the deaerator during start up of 18t/hr4.1.3Transformer Deaerator (STR)IeABCDEFGDate2011.12BLX17SVA004GJS045GNGEDI1/4CHENGGANGUnder normal running conditions a supply of 2.355 t/hr ofat 12 bar abs188 is fed by the distribution systemo the transformer deaerator.During a
8、start up condition of one unit the demand of auxiliary4.548 t/hr.rises to4.1.4Auxiliary Feedwater (ASG)may be condition. Thed to this system for heating, although only on a standbyippd at 4.5 bar abs and 165 from the prerereducing sion in Unit 1 conventional island. The normal demand, if required,is
9、 4.3 t/h and condensate returns to thetransformer deaerator. Theflowrate can under exceptional conditions momentarily reach 10 t/h (rare occurrence).4.1.5Turbine Gland (CET)During start up conditions auxiliaryis required fland sealing. Theisd at 6.5 bar abs and 172 from the prere reducingsion. Note:
10、 When consumptionthe turbine glands are in new condition, the gland will be 6.012 t/h. When the glands are worn, theconsumption will increase to 9.0 t/h.Unit 2Refer to the diagram BL217SVA503GJS045DD.This diagram dcts three feed user sions taking theirions are on Unit 2, theirs from the auxiliarycon
11、sumptionsfeed main. Although these user s are identical to those already described.Please refer to4.1.2For Feedwater Deaerating and Gas StripperADG (at 12 bar abs 188)4.1.34.1.5ForTransformer DeaeratorSTR ( CET (at 12 bar abs 188) at 6.5 bar abs 172)For Turbine GlandIeABCDEFGDate2011.12BLX17SVA004GJ
12、S045GNGEDI2/4CHENGGANG4.2CHARACTERISTICS4.2.1System Design DataThe auxiliarytransmitted by this system is at a prere of 12 bar absand a temperature of 188. A taphemain feeds a prerereducing sion where a supply of 4.5 bar abs 165 is made available forheating the Nuclear Island and the auxiliary feedw
13、ater deaerator. A tapinthemain feeds a prere reducing sion where a supply of 6.5 bar land seal heater(CET).abs 172 is made available f4.2.2Prere Reducing SionValve Type Material Inlet pre Outlet preTo ASGGlobe Carbon steel 124.5To CETGlobe Carbon steel 126.5rerebar abs bar abs4.2.3Ref ValveDesign pr
14、e Set prererebar g bar g3.54.54.2.4Trapstraps are egrated.ofthe ball floattype and are provided with astrainerIeABCDEFGDate2011.12BLX17SVA004GJS045GNGEDI3/4CHENGGANG4.3LAYOUT4.3.1A branch from the auxiliarymain in the balance of plant, running at-9.078m level enters the auxiliaries annexe adjacent to B row column 1. Thissupply will be at 12 bar abs 188. The main rises vertically toapproximay +12m level prior to running horizontally to B row betncolumn 6 and column 7. At this poit rises to the +32m level terminating attheconverters near B row column 8
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 西北大學《口腔醫(yī)學臨床前技能訓練(二)》2023-2024學年第二學期期末試卷
- 浙江汽車職業(yè)技術學院《數據分析與應用》2023-2024學年第二學期期末試卷
- 青島黃海學院《入侵檢測與入侵防御》2023-2024學年第二學期期末試卷
- 山東勝利職業(yè)學院《供應鏈與物流概論》2023-2024學年第二學期期末試卷
- 甘肅省定西市漳縣2025屆五年級數學第二學期期末統(tǒng)考模擬試題含答案
- 廣東茂名健康職業(yè)學院《高等藥理學(雙語)》2023-2024學年第二學期期末試卷
- 古希臘哲學和中國哲學
- 功放高頻移相
- 公共交通服務規(guī)范管理制度
- 工程項目成本控制的原則
- 圍棋入門基本知識
- 2024年新疆生產建設兵團興新職業(yè)技術學院高職單招職業(yè)技能測驗歷年參考題庫(頻考版)含答案解析
- 2025年貴州蔬菜集團有限公司招聘筆試參考題庫含答案解析
- 醫(yī)院設施日常巡查管理制度
- 急性心房顫動中國急診管理指南(2024)解讀
- 人教版四年級下冊數學第二單元觀察物體(二) 單元測試
- 建筑工程公司績效考核制度范本
- 專題12:賓語從句 -2023年中考英語考試研究(解析版)(上海專用)
- 汽車總線系統(tǒng)檢修課件 模塊一 汽車單片機在車載網絡中的應用
- 一型糖尿病的護理查房
- 《工業(yè)管道在線檢驗指南》
評論
0/150
提交評論