配電箱工藝流程_第1頁
配電箱工藝流程_第2頁
配電箱工藝流程_第3頁
配電箱工藝流程_第4頁
配電箱工藝流程_第5頁
已閱讀5頁,還剩20頁未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)

文檔簡介

1、家用配電箱的安裝工藝Installation technology of household distribution box科技社制作2016尚德 尚能 永新 永動什么是配電板、配電箱?What is a Panel, distribution box?將測量儀器和控制、保護(hù)、信號等器件按一定規(guī)律安裝在專業(yè)的板上,便制成配電板。將其裝入專用的箱內(nèi),便成配電箱。Measuring instruments and control, protection, signal devices installed on a regular basis on professional boards, mad

2、e from the power distribution Board. Put it in a special box, into a distribution box配電箱的組成The composition of the distribution box配電箱是數(shù)據(jù)上的海量參數(shù),一般是構(gòu)成低壓林按電氣接線,要求將開關(guān)設(shè)備、測量儀表、保護(hù)電器和輔助設(shè)備組裝在封閉或半封閉金屬柜中或屏幅上,構(gòu)成低壓配電箱。正常運(yùn)行時可借助手動或自動開關(guān)接通或分?jǐn)嚯娐?。Distribution boxes are data on the mass parameter, usually constitute a

3、low-voltage forest according to the electrical wiring, requires that the switching device, measuring instrument, protect electrical and auxiliary equipment to assemble in enclosed or semi-enclosed metal cabinets or on the screen image, constitute a low-voltage power distribution box. Normal operatio

4、n can be realized by using manual or automatic switching on or off road.配電箱的一次元件有:空開,刀開,接觸器,熱繼電器,等;面板上的二次元件有:電壓表,電流表,轉(zhuǎn)換開關(guān),指示燈,按鈕,等;柜內(nèi)裝二次元件有:中間繼電器,時間繼電器,等;輔助配件有:導(dǎo)線,端子,熔絲,等。 另外,有許多配電柜裝有:PLC,變頻器。Distribution box of a times components has: empty open, knife open, contact device, hot following electrical

5、,; Panel Shang of two times components has: voltage table, ammeter, conversion switch, led, button,; cabinet within loaded two times components has: Middle following electrical, time following electrical,; auxiliary accessories has: wire, Terminal, melt silk,. In addition, there are many electrical

6、cabinet contains: PLC and inverter.目前常用的家用配電箱Common household distribution box家用配電箱的作用Role of household distribution box作用:它是連接電源與用電設(shè)備的中間裝置,它除了分配電能外,還具有對用電設(shè)備進(jìn)行控制、測量、指示及保護(hù)等功能。Role: it is connected to the power supply and electrical equipment broker, outside of distribution of power, it also has the p

7、ower to control, measurement, indication and protection functions.合理的分配電能,方便對電路的開合操作。有較高的安全防護(hù)等級,能直觀的顯示電路的導(dǎo)通狀態(tài)。便于管理,當(dāng)發(fā)生電路故障時有利于檢修。Reasonable distribution of electrical energy, convenient opening and closing of the circuit operation. High level of safety and protection, can directly display the conduc

8、ting State of the circuit. Ease of administration when the circuit down to overhaul.配電箱的原理The principle of distribution boxes配電箱是按電氣接線要求將開關(guān)設(shè)備、測量儀表、保護(hù)電器和輔助設(shè)備組裝在封閉或半封閉金屬柜中或屏幅上,構(gòu)成低壓配電裝置。正常運(yùn)行時可借助手動或自動開關(guān)接通或分?jǐn)嚯娐?。故障或不正常運(yùn)行時借助保護(hù)電器切斷電路或報警。借測量儀表可顯示運(yùn)行中的各種參數(shù),還可對某些電氣參數(shù)進(jìn)行調(diào)整,對偏離正常工作狀態(tài)進(jìn)行提示或發(fā)出信號。常用于各發(fā)、配、變電所中。Distribu

9、tion boxes are based on electrical wiring switch equipment, measuring instruments, protection of electrical and auxiliary equipment Assembly in closed or semi-closed metal cabinets or on the screen image, constitute a low-voltage power distribution unit. Normal operation can be realized by using man

10、ual or automatic switching on or off road. Protection fault or abnormal operation with electrical cut off the circuit or the police. By measuring instruments can display various parameters for running, electrical parameter can also be adjusted to prompts signals or deviations from normal working con

11、ditions. Commonly used for each license, distribution, substations.一般家用配電板原理圖General Household Panel schematic配電箱的安裝工藝流程Distribution box installation process1.先將配電箱外殼固定在墻上(家庭配電箱配電箱不宜安裝過高,一般安裝標(biāo)高為1.8米,以便操作)1. the first distribution box housing to the wall (household distribution box power distribution

12、 box should not be installed too high, generally installed 1.8 meters above sea level so that operations)2.然后將導(dǎo)軌固定在配電箱內(nèi)2. and then Rack Mount distribution boxes3.然后將空開,插座按從左到右的順序安裝在導(dǎo)軌上3. then open, socket installed in order from left to right on the rail4.按照電路圖開始接線4. in accordance with the circuit diagram start wiring(1)先接地線(1) ground wire(2)再接零線(2) the zero line(3)接著接火線(3). FireWire(4).最后接三相電源線(4). three-phase power supply line5.接線安裝完成后,用萬用表檢測接線是否正確是否有短路,斷路等情況。如確定沒有錯誤后,合上空氣開關(guān),通電5. wiring installation is complete, test with a mul

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論