QualityControlPlan質(zhì)量控制計劃,,,,,,,,,,,,
,,,,,,,,,,,,,
■Prototype樣件,□Prelaunch試生產(chǎn),□Production生產(chǎn),ContactPerson/Tel.聯(lián)系人和電話,,,,Date(Original):報告日期,,,,,
ControlPlanNo.:控制計劃編號,,,Xieshixiang,,,,06/29/2011,,,,,
PartNo./LatestChangeLevel料號/最近版本,,,ProjectTeam:項目組成員,,,,CustomerPlantApproval/Date(ifneeded):客戶確認/日期,,,,,
BR3014216Q,,,"xieshixiang,changlianbo,liuzhibin",,,,,,,,,
PartName/Description零件名稱/描述,,,SupplierPlantApproval/Date:供應(yīng)商確認/日期,,,,CustomerQualityApproval/Date(ifneeded):客戶質(zhì)量部確認/日期,,,,,
"BOSS,PIPINGMANF,SS3/4″NPT",,,,,,,,,,,,
Supplier/Plant:供應(yīng)商名稱,,SupplierCode:供應(yīng)商編號,OtherApproval/Date(ifneeded):其它確認日期(如果需要的話),,,,OtherApproval/Date(ifneeded):其它確認/日期,,,,,
BROADEN,,,,,,,,,,,,
Part/ProcessNumber產(chǎn)品/工序編號,ProcessName/OperationDescription過程名/操作描述,Device/ToolsforMfg工具/機器,Characteristics特性,,,Measurement測量,Evaluation/Measurement量具,Samplesize樣品數(shù)量,"Samplefrequency
頻率","ControlMethod控制方法
",ReactionPlan應(yīng)對方法,
,,,No.序號,CheckPoints檢測點,,Product/ProcessSpec./tolerance產(chǎn)品/工序說明/公差,,,,,,
01,進貨檢驗Receivinginspection,,01,"鋼料
Rawmaterial",,"化學(xué)成分:Chemicalcomposition
C:<0.08,
Si;<1.0,
Mn:<2.0,
Cr:18~20,
Ni:6~10.5,
無油,nooli","材質(zhì)證明
光譜分析儀Materialcertification;Spectrometer
Calibratethespectrometremachine1timeeachyear.andcalibratethestandardsamples1timeeachshift.
",1pcs,"每批
Eachpurchase,
eachlot.
","標識原材料與證明文件;
光譜分析
物料采購驗收單
RawMaterialIdentificationandmaterialcertification;
Labcertification;
Incominginspectionrecords","采購員填寫不合格品評審單提交質(zhì)量經(jīng)理評估,確定是否接收。
TheoperatortoinitiateNCMRandnotifyQAfordisposition.","Theseareallthesamereactionplans.Howisnon-confomringmaterialcontained?
TheQAvaluetheaffectofthenonconfirmingmaterial.makethedisposition:returnsoraccepted.
"
,,,02,"合金成分
Alloychemicalcomposition
",,"鎳板符合標準GB6516-86
NickelaccordingtoGB6516-86","質(zhì)保書
MaterialQualitycertificationsupplier'scertification",1pcs,"每批
Eachpurchase,
eachlot.","質(zhì)保書
MaterialQualitycertification
Referenceprocess16","采購員填寫不合格品評審單提交質(zhì)量經(jīng)理評估,確定是否接收。
TheoperatortoinitiateNCMRandnotifyQAfordisposition..",
,,,,,,"鉬鐵符合標準GB/T3649-87
MoFeaccordingtoGB/T3649-87","質(zhì)保書
MaterialQualitycertification
supplier'scertification",1pcs,"每批
Eachpurchase,
eachlot.","質(zhì)保書
MaterialQualitycertification
Referenceprocess16","采購員填寫不合格品評審單提交質(zhì)量經(jīng)理評估,確定是否接收。
TheoperatortoinitiateNCMRandnotifyQAfordisposition.",
,,,03,"蠟料
WaxMaterial",,"軟化點:70-80℃
針入度(25℃)/10-1mm:5-9
線收縮率(%):0.9-1.1
灰分含量(%):≤0.05
Softeningpoint:70-80℃
Penetration(25℃)/10-1mm:5-9
Contractionrate(%):0.9-1.1
Ash(%):≤0.05","1質(zhì)保書
2第三方實驗室報告
1.MaterialQualitycertificationprovidedbysuppliereachlot;
2.Outsidelabtestreport",1times,"每6個月
Each6months
","定期送檢
Periodicallysendtooutsidetestlabeach6months
Brodencheckontractionrate(%)and
Ash(%),
1timeseachmonth.","采購員填寫不合格品評審單提交質(zhì)量經(jīng)理評估,確定是否接收。
TheoperatortoinitiateNCMRandnotifyQAfordisposition.
MRBhandle,returntosupplier.",
,,,,,,,,,,,,,
,,,04,"硅溶膠
Solicagel
",,"外觀:無懸浮物
Novisiblefloatingparticles
Nosiliconeindiscerptible","目測
Visualinspection
",1pcs,"每批
Eachpurchase,
eachlot.","物料采購驗收單
Broaden'sincominginspectionreport.","采購員填寫不合格品評審單提交質(zhì)量經(jīng)理評估,確定是否接收。
TheoperatortoinitiateNCMRandnotifyQAfordisposition.
MRBhandle,returntosupplier.",
,,,,,,SiO2:29-31%,"實驗室
Labtest",1pcs,"每批
Eachpurchase,
eachlot.","實驗室檢驗證明
Labcertification
INCOMINGINSPECTIONREPORT
","采購員填寫不合格品評審單提交質(zhì)量經(jīng)理評估,確定是否接收。
TheoperatortoinitiateNCMRandnotifyQAfordisposition.",
,,,05,"鋯粉
zirconpowder",,"粒度:48um(300目)
Granularsize:48um(300mesh)","實驗室
Labtest
",1pcs,"每批
Eachpurchase,
eachlot.","實驗室檢驗證明
INCOMINGINSPECTIONREPORT","采購員填寫不合格品評審單提交質(zhì)量經(jīng)理評估,確定是否接收。
TheoperatortoinitiateNCMRandnotifyQAfordisposition.",
,,,06,"鋯砂
zirconsand",,"粒度:150um(100目)
GranularSize:150um(100mesh)","實驗室
Labtest
",1pcs,"每批
Eachpurchase,
eachlot.","實驗室檢驗證明
INCOMINGINSPECTIONREPORT","采購員填寫不合格品評審單提交質(zhì)量經(jīng)理評估,確定是否接收。
TheoperatortoinitiateNCMRandnotifyQAfordisposition.",
,,,07,"莫來粉
Mullitepowder",,"粒度:75um(200目)
GranularSize:75um(200mesh)","實驗室
Labtest
IsthereanASTMstandardbeingfollowed?
ThereisnoASTMstandard,andnoGBstandardalso.becausetherearedifferentconditionsindifferentplant..eachfactoryhaveintermalstandard.Broden'sinternalstandardseethepicture.",1pcs,"每批
EachlotWhatdefinesalot?
Eachpurchase,
eachlot.","實驗室檢驗證明
Labcertification
Internalorexternal?
Broaden'slabcertification.","采購員填寫不合格品評審單提交質(zhì)量經(jīng)理評估,確定是否接收。
TheoperatortoinitiateNCMRandnotifyQAfordisposition.",
,,,08,"莫來細砂
Mullitesand",,"粒度:250-550um(30-60目)
GranularSize:250-550um(30-60mesh)","實驗室
Labtest
",1pcs,"每批
Eachpurchase,
eachlot.","實驗室檢驗證明
INCOMINGINSPECTIONREPORT","采購員填寫不合格品評審單提交質(zhì)量經(jīng)理評估,確定是否接收。
TheoperatortoinitiateNCMRandnotifyQAfordisposition.",
,,,09,"莫來粗砂
Mullitesand",,"粒度:550-1000um(16-30目)
GranularSize:550-1000um(16-30mesh)","實驗室
Labtest
",1pcs,"每批
Eachpurchase,
eachlot.","實驗室檢驗證明
INCOMINGINSPECTIONREPORT","采購員填寫不合格品評審單提交質(zhì)量經(jīng)理評估,確定是否接收。
TheoperatortoinitiateNCMRandnotifyQAfordisposition.",
02,蠟料制備Waxpreparation,"脫水桶
Dehydratetank",01,"脫水溫度
Dehydratetemperature",,"脫水溫度:105-120℃
Dehydratetemperature:105-120℃","自動溫控儀
顯示器
報警器
Automatictemperaturecontroller
Monitorandtrack
Alarms","連續(xù)
Throughout.
PLCcontrol","每桶
Eachtank","報警器
Machinealarms","停止生產(chǎn)并通知工程師調(diào)整。
Theoperatortoinformtheengineeradjust.","Howaretheadjustmentsmaintained?
Howdoestheoperatorknowwhentomakeanadjustment?
Whataretheoperatorscheckingtoo?
Whathappenstoallthebadproductidentified?
"
,,,02,"脫水時間
Dehydratetime",,"脫水時間:≥12h
Dehydratetime:≥12h","計時器
Timer
",1,"每桶
Eachtank
≥12h
","記錄
Manualtracking
TheoperatortofillinTheDehydrateTimeRecord,recordthestarttimeandtheendtime","操作者自行調(diào)整
Theoperatortoadjust",
,,"靜置桶
Precipitationtank",01,"靜置溫度
Precipitationtemperature",,"靜置溫度70-85℃
Temperature70-85℃","自動溫控儀
顯示器
報警器
Automatictemperaturecontroller
Monitorandtrack
Alarms","連續(xù)
Throughout.
PLCcontrol","每桶
Eachtank
≥12h","報警器
Machinealarms
Whentheprecipitationtemperatureisn'tinthetolance.weknowitimmediately.","停止生產(chǎn)并通知工程師調(diào)整。
Theoperatortoinformtheengineeradjust.",
,,,02,"靜置時間
Precipitationtime",,"靜置時間:≥12h
Stilltime:≥12h","計時器
Timer",1,"每桶
Eachtank
≥12h","記錄
Manualtracking
TheoperatorfillinThePrecipitationTimeRecord,recordthestarttimeandtheendtime
","操作者自行調(diào)整
Theoperatortoadjust",
03,"制造蠟?zāi)?/p>
Makewaxmodel","全自動射蠟機
Automaticwaxinjectionmachine",01,"射蠟壓力
Injectingpressure",,"射蠟壓力:2.5-3.5MPa
Pt=2.5~3.5MPa;
","壓力表
Pressuremeter
calbrated2timeeveryyear
",1times,"每小時
1hour","記錄
Manualtracking
TheoperatortofillinTheInjectingPressureRecord,recordthepressure1timeseachhour.","停止生產(chǎn)并通知工程師調(diào)整。
Theoperatortoinformtheengineertorecheckandadjust.",
,,,02,"射蠟溫度
Injectingtemperature",,"射蠟溫度:58-60℃
Temperature:58-60℃","測溫儀
Temperaturetester
calbrated2timeeveryyear
",1times,"每小時
1hour","記錄
Manualtracking
TheoperatortofillinTheInjectingTemperatureRecord,recordthetemperature1timeseachhour.","停止生產(chǎn)并通知工程師調(diào)整。
Theoperatortoinformtheengineertorecheckandadjust.",
,,,03,"射蠟時間
Injectingtime",,"射蠟時間:35+/-0.5s
Time:35+/-0.5s
","計時器
Timer
calbrated2timeeveryyear",100%,連續(xù)Continuous,"自動控制
Automaticstopwhentotime","停止生產(chǎn)并通知工程師調(diào)整。
Theoperatortoinformtheengineertorecheckandadjust.",
04,"修蠟
Decoratewaxmodel","專用刀具
Specialtool",01,"外觀
Appearance",,"無飛邊,毛刺
Noburrsandflashing","目測
Visualinspection",100%,連續(xù)Continuous,"自檢
Self-inspectionperinspectionsheet
","自檢并返修
Theoperatortorecheckandrework",
05,"檢驗
WaxmodelInspection",,01,"外觀
Appearance",,"無飛邊,毛刺
Noburrsandflashing","目測
Visual",100%,連續(xù)Continuous,"專檢記錄
Processinspectionrecord
","通知操作者停止工作,并進行自檢自修。
Informtheoperatortorecheckthewaxparts.Reworkedorrejected.",
,,,02,"尺寸
Waxdimensions",,"蠟件尺寸符合圖紙要求
Accordingtocastingpartdrawing
","卡尺
Caliper
calibrated1timeevery6months",5pcs,"Every2H
",,,
,,,,,,,,,,,,,
06,"組樹
Waxmodelsassembling","電烙鐵
Electriciron",01,"外觀
Appearance",,"組樹方式符合工藝要求
WaxtreeaccordingtoInstructionandsamplepicture","目測
Visual",100%,連續(xù)Continuous,"自檢
Self-inspection
Theoperatorshoudcheckthewaxtreeismeettherequirementsornot.","返工或報廢
Reworkedorrejected",
,,,,,,,,2pcs,2h,"專檢記錄
Processinspectionrecord
Theinspectorshoudcheckthewaxtreeismeettherequirementsornot.andrecordthesamplesizeandfrequency","通知操作者停止工作,并進行自檢。
Toinformtheoperatortorecheck,reworkedorrejected.",
07,"面層沾漿制殼
Baselayerdippingandcoating
","漿料機
淋砂機
浮砂機
恒溫恒濕機
鋯粉
鋯砂
Slurrytank&Sandcoatingdevice&
Humidistat&dryingdevice
zirconpowder
zirconsand",01,"粘度
Viscosityofbaselayer",,"面層粘度:35~40s
Viscosityofbaselayer:35~40S","標準流杯和計時器
viscositycupandtimer
Wechecktheviscosity5timesoneday.
calbrated2timeeveryyear
","5次
5times","每天
2-3timeseachshift","專檢記錄
Processinspectionrecord","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,02,"濕度
humidityofbaselayerroom",,"面層濕度:50-70%RH
humidityofbaselayer:
50-70%RH","濕度計
Hygrometer
calbrated2timeeveryyear","5次
5times","每天
2-3timeseachshift","專檢記錄
Processinspectionrecord
Thereportincludehumidityandtime.","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,03,"干燥時間
Dryingtime",,"干燥時間:6-12h
Dryingtime:6-12h","計時器
Timer
",100%,"每棵
eachtree",,"調(diào)整并再檢查
Theoperatortoadjustandrecheck",
08,"過渡層沾漿制殼
Thesecondlayerdippingandcoating
","漿料機
淋砂機
浮砂機
恒溫恒濕機
莫來粉
莫來砂
Slurrytank&Sandcoatingdevice&
Humidistat
Mullitepowder
Mullitesand",01,"粘度
Viscosityofthesecondlayer",,"過渡層粘度:13-15s
Viscosityofthesecondlayer:13-15S","標準流杯和計時器
viscositycupandtimer
Wechecktheviscosity5timesoneday.
calbrated2timeseveryyear","5次
5times","每天
2-3timeseachshift","專檢記錄
Processinspectionrecord
Thereportincludetheslurryviscosityandtime.
","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,02,"濕度
humidityofthesecondlayerroom",,"面層濕度:40-60%RH
humidityofthesecondlayer:
40-60%RH","濕度計
Hygrometer
calbrated1timeseveryyear","5次
5times","每天
2-3timeseachshift",,"調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,03,"干燥時間
Dryingtime",,"干燥時間:12-24h
Dryingtime:12-24h","計時器
Timer
",100%,"每棵
eachtree","記錄
Manualtracking
TheoperatortofillinTheDryingTimeRecord,recordthedryingtime.","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
09,"第三層沾漿制殼
Thethirdlayerdippingandcoating","漿料機
淋砂機
浮砂機
恒溫恒濕機
莫來粉
莫來砂
Slurrytank&Sandcoatingdevice&
Humidistat
Mullitepowder
Mullitesand",01,"粘度
Viscosityofbaselayer",,"第三層粘度:11-13s
Viscosityofthethirdlayer:11-13S","標準流杯和計時器
viscositycupandtimer
Wechecktheviscosity5timesoneday.
calbrated2timeseveryyear
","5次
5times","每天
2-3timeseachshift","專檢記錄
Processinspectionrecord
Thereportincludetheslurryviscosityandtime.","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,02,"濕度
humidityofthethirdlayerroom",,"面層濕度:40-60%RH
humidityofthethirdlayer:
40-61%RH","濕度計
Hygrometer
calbrated1timeseveryyear","5次
5times","每天
2-3timeseachshift",,"調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,03,"干燥時間
Dryingtime",,"干燥時間:≥24h
Dryingtime:≥24h","計時器
Timer
calbrated1timeseveryyear",100%,"每棵
eachtree","記錄
Manualtracking
TheoperatortofillinTheDryingTimeRecord,recordthedryingtime.","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
10,"第四層沾漿制殼
Thefourthlayerdippingandcoating","漿料機
淋砂機
浮砂機
恒溫恒濕機
莫來粉
莫來砂
Slurrytank&Sandcoatingdevice&
Humidistat
Mullitepowder
Mullitesand
",01,"粘度
Viscosityofthe4thlayer",,"第四層粘度:11-13s
Viscosityofthe4thlayer:11-13S","標準流杯和計時器
viscositycupandtimer
Wechecktheviscosity5timesoneday.
calbrated2timeseveryyear
","5次
5times","每天
2-3timeseachshift","專檢
Processinspectionrecord","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,02,"濕度
humidityofthe4thlayerroom",,"面層濕度:40-60%RH
humidityofthe4thlayer:
40-60%RH","濕度計
Hygrometer
calbrated1timeseveryyear","5次
5times","每天
2-3timeseachshift","專檢
Processinspectionrecord","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,03,"干燥時間
Dryingtime",,"干燥時間:≥24h
Dryingtime:≥24h","計時器
Timer
calibrated1timeeachyear",100%,"每棵
eachtree","記錄
Manualtracking
TheoperatortofillinTheDryingTimeRecord,recordthedryingtime.","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
11,"第五層沾漿制殼
The5thlayerdippingandcoating","漿料機
淋砂機
浮砂機
恒溫恒濕機
莫來粉
莫來砂
Slurrytank&Sandcoatingdevice&
Humidistat
Mullitepowder
Mullitesand",01,"粘度
Viscosityofthe5thlayer",,"第四層粘度:11-13s
Viscosityofthe5thlayer:11-13S","
標準流杯和計時器
viscositycupandtimer
Wechecktheviscosity5timesoneday.
calbrated2timeseveryyear
","5次
5times","每天
2-3timeseachshift","專檢
Processinspectionrecord","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,02,"濕度
humidityofthe5thlayerroom",,"面層濕度:40-60%RH
humidityofthe5thlayer:
40-60%RH","濕度計
Hygrometer
calibrated1timeeachyear","5次
5times","每天
2-3timeseachshift","專檢
Processinspectionrecord","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,03,"干燥時間
Dryingtime",,"干燥時間:≥24h
Dryingtime:≥24h","計時器
Timer
calibrated1timeeachyear",100%,"每棵
eachtree","記錄
Processinspectionrecord
TheoperatortofillinTheDryingTimeRecord,recordthedryingtime.","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
12,"第六層沾漿制殼
The6thlayerdippingandcoating","漿料機
淋砂機
浮砂機
恒溫恒濕機
莫來粉
Slurrytank&Sandcoatingdevice&
Humidistat
Mullitepowder",01,"粘度
Viscosityofthe6thlayer",,"第四層粘度:11-13s
Viscosityofthe6thlayer:11-13S","標準流杯和計時器
viscositycupandtimer
Wechecktheviscosity5timesoneday.
calbrated2timeseveryyear
","5次
5times","每天
2-3timeseachshift","專檢
Processinspectionrecord","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,02,"濕度
humidityofthe6thlayerroom",,"面層濕度:40-60%RH
humidityofthe6thlayer:
40-60%RH","濕度計
Hygrometer
calibrated1timeeachyear","5次
5times","每天
2-3timeseachshift","專檢
Processinspectionrecord","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,03,"干燥時間
Dryingtime",,"干燥時間:≥24h
Dryingtime:≥24h","計時器
Timer
calibrated1timeeachyear",100%,"每棵
eachtree","記錄
Manualtracking
TheoperatortofillinTheDryingTimeRecord,recordthedryingtime.","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
13,"脫蠟
De-waxing","蒸氣脫蠟釜
Steamde-waxingautoclave
",01,"脫蠟壓力
Steampressure",,"蒸氣壓力0.65~0.8MPa
Steampressure:
0.65~0.8MPa","壓力表
Pressuremeter
calibrated1timehalfayear",1time,"每爐
Eachfurnacepershift
","記錄
Manualtracking
TheoperatortofillinTheDewaxedRecord,recordthedewaxpressure.","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,02,"脫蠟時間
De-waxingtime",,"脫蠟時間:15-20分鐘
time:15-20min","計時器
Timer",1time,"每爐
Eachfurnacepershift
","報警器
Timeralarm","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,03,"型殼質(zhì)量
Qualityofshell",,"無裂殼
Nocracks","目視
Visualinspection
Broadensatndard
Nocracksontheshell.
",100%,連續(xù)Continuous,"記錄
Manualtracking
TheoperatortofillinTheDewaxedRecord,recordthebadshells.
Repairedorrejected","報廢
Rejectedandrecycled
",
14,"型殼焙燒
Shellbaking","型殼焙燒爐
Bakingfurnace",01,"焙燒溫度
Bakingtemperature",,"溫度:1100~1200℃,
Temperature:1100~1200℃;
","熱電偶
TC",1time,"每爐
Eachfurnacepershift
","記錄
Recordedthetemperatureanbakingtime
","調(diào)整并再檢查
Theoperatortoadjustandrecheck",
,,,02,"焙燒時間
Bakingtime",,"時間:30-45分鐘
Time:30-45minutes
Thefurnacesizeis2000×2500×1000
about160-200pcs
熱電偶
TCcontrolthetemperture
","計時器
Timer
calibrated1timeeachyear",1time,"每爐
Eachfurnacepershift
","報警器
Timeralarm","調(diào)整
Theoperatortoadjust",
15,"熔煉
Melting","中頻爐(200Kg)
IFfurnace(200kg)",01,"配料
Alloyingingredient
",,"304原料:185kg
鎳:5kg
鉬鐵:10kg
304rawmaterial:185kg
Nickel:5kg
MoFe:10kg
","稱
benchscale
calibrated2timeseachyear
",1time,"每爐
Eachfurnacepershift
","自檢專檢
Self-inspectionandspecialinspection
Recordtheweightofeverykindofrawmaterial.","調(diào)整
Theoperatortoadjust",
,,,02,"熔煉溫度
RefiningTemperature",,1610~1630℃,"測溫儀
Temperaturetester
calbrated1timeseachyear
Theoperatorwriteinthereport.
RefiningTemperatureshouldbein1610-1630℃
","1time
","每爐
Eachfurnacepershift
","自檢專檢
Self-inspectionandspecialinspection
Theactualrefiningtemperureshouldbecollected.","調(diào)整
Theoperatortoadjust",
16,"爐前光譜分析
Chemicalanalyze","光譜儀
試塊
Spectrometer
Testblock",01,"合金成分
Alloychemicalcomposition
",,"化學(xué)成分:CF8MASTMA351
ChemicalcompositionaccordingtoASTMA351
C:≤0.08,
Si;≤1.5,
Mn:≤1.5,
Cr:18.0~21.0,
Ni:9.0~12.0,
Mo:2.0-3.0","光譜室評估
Labevaluation
Broaden'slab.",1time,"每爐
Eachfurnacepershift
","專檢
Processinspectionrecord
Theactualchemicalcompositioniscollected
Putthedataintotheinspectionrecordandkeeptherecordfor5years","調(diào)整
Theinspectorinformedtheoperatortoadjust",
17,"澆注
Pouring","中頻爐(200Kg)
IFfurnace(200kg",01,"鋼液溫度
Thesteeltemperature",,"鋼溫:1610~1630℃
Temperatureofsteel:1610~1630℃","測溫儀
Temperaturetester
calbrated1timeeachyear
Theoperatorwriteinthereport.
RefiningTemperatureshouldbein1610-1630℃
",1time,"每爐
EachfurnaceProcessinspectionrecord
","自檢專檢
Self-inspectionandspecialinspection
Theactualrefiningtemperureshouldbecollected.","調(diào)整
Theoperatortoadjust",
,,,02,"澆注速度
Pouringrate",,"每串3~5S
Pouringrate:3~5S/tree","計時器
Timer
calibrated2timeseachyear
",100%,連續(xù)Continuous,"專檢
Processinspectionrecord
Theactualpouringtimeiscollected","調(diào)整
Theoperatortoadjust",
18,"冷卻
Cooling",,01,"冷卻時間
Coolingtime",,"冷卻時間至少4小時
Coolingtimeisnotlessthan4hours","計時器
Timer","每棵
Eachtree",100%,"自檢
Self-inspection
Thereisnodataneedtocollected.wejustseetheo'clock,oh,thecoolingtimehasmorethan4hours,wecoulddothenextstep.","調(diào)整
Theoperatortoadjust",
19,"震動脫殼
removingshell","震動脫殼機
Shakingmachine",01,"鑄件外觀
Thecastingappearance",,"無裂痕,傷痕
Nocrackandscaroncasting","目測
Visualinspection","每棵
Eachtree",100%,"自檢
Self-inspection
Thereisnodataneedtocollected.","調(diào)整
Theoperatortoadjust",
20,"澆口切割
Cuttingthepouringgate","砂輪切割機
Sandgrindingcutter
",01,"鑄件澆口殘留高度
Surplusgate",,"澆口余量<3mm,切忌割傷Pouringgate<3mm","卡尺
calibrated1time6months",5pcs,1h,"自檢
Self-inspection
Thereisnodataneedtocollected.","調(diào)整
Theoperatortoadjust",
21,"澆口打磨
grindingthepouringgate","砂帶機
Sandbeltmachine",02,"澆口
Surplusgate",,澆口<0.5mmPouringgate<0.5mm,"卡尺
Caliper
calibrated1time6months",5pcs,1h,"自檢
Self-inspection
Thereisnodataneedtocollected.","調(diào)整
Theoperatortoadjust",
22,"拋丸
Shotblasting","拋丸機
Blastingmachine
Q25
200-250pcs",01,"拋丸時間
Blastingtime",,"拋丸時間:30-40分鐘
Time:30-40min","計時器
Timer
calibrated1time6months
",100%,"每批
200-250pcs
","自動控制
Automaticstopwhentotime","調(diào)整
Theoperatortoadjust",
,,,02,表面砂子殘留狀況appearance,,"砂子無殘留
Noresidualofsands","目測
Visualinspection",5pcs,"每批
200-250pcs","自檢
Self-inspection
Thereisnodataneedtocollected.","返工
Theoperatortoreworked",
23,"酸洗
Acidwash
Whattypeofwashisthis?Isthereaspecificationsheet?
HF:HNO3:H2O=1:4:4","酸洗槽
Acidwashtank",01,"外觀
appearance",,"鑄件表面形成鈍化膜,色澤均勻,呈銀白色
Nooxideskin","目測
Visualinspection",5pcs,"每批
Eachlot5pcs
1timesacidwashing,1lot","自檢
Self-inspection
Thereisnodataneedtocollected.","返工
Theoperatortoreworked",
24,"精整
Finishing","氬弧焊機
Arcweldingmachine
手提式砂輪機
portablegrinder",01,"鑄件外觀
Castingsappearance",,"鑄件表面光潔,無鑄造缺陷
Rawcastingsurfaceisgood.
Nocastingdefect.
Weusethearcweldingmachineandgridertodecoratethecastingtomakeitbeautiful.
","目測
Visualinspection",100%,連續(xù)Continuous,"自檢
Self-inspection
","返工
Theoperatortoreworked",
25,"熱處理
Solutionheattreatment","熱處理爐
Heattreatmentfurnace",01,"熱處理溫度
Solusiontemperature
1090-1100℃",,"熱處理溫度:1090-1100℃
Temperature:1090-1100℃","熱電偶
TC
calibrated1timeeachyear",100%,"每爐
Eachfurnace","自動控制
Automatictracking","操作者填寫不合格品評審單提交質(zhì)量經(jīng)理評估,確定是否接收。
TheoperatortoinitiateNCMRandnotifyQAfordisposition.",
,,,02,"保溫時間
holdingtime",,"保溫時間:45分鐘
holdingtime:45min","計時器
Timer
calibrated1timeeachyear",100%,"每爐
Eachfurnace","報警
timeralarm",,
,,,03,"冷卻水溫
coolmediumtemperature",,"冷卻水溫≤35℃
Watertemperature:≤35℃","水溫計
hydrothermograph
calibrated1timeeachyear","1次
","每爐
Eachfurnacepershift
","自檢
Self-inspection
Theoperatorfillintheself-inspectionreport,recordtheactualsolusiontemterature、theactualholdingtime、theactualwatertemperature.",,
26,"拋丸
Shotblasting","拋丸機
Blastingmachine",01,"拋丸時間
Blastingtime",,"拋丸時間:30-40分鐘
Time:30-40min","計時器
Timer
calibrated1timeeachyear",100%,"每批
Eachlot200-250pcs","自動控制
Automaticstopwhentotime","調(diào)整
Theoperatortoadjust",
,,,02,"表面
appearance",,"無殘留氧化皮
Broadenstandard
Nooxideskin
","目測
Visualinspection
Nooxideskin",5pcs,"每批
Eachlot200-250pcs","自檢
Self-inspection
Thereisnodataneedtocollected.","返工
Theoperatortoreworked",
27,"清洗鈍化
passivation
Whattypeofpassivationisbeingused?
HNO3
Thereshouldbeacertificationforthisprocess.
Yes","清洗鈍化槽
passivationsink
Inthisprocess,thecastingsurfaceshouldbepassivated.Aftermaching,thereisanotherpassivationprocessformachingsurface.",01,"表面
appearance",,"表面鈍化成銀白色,形成均勻一致的鈍化膜
Thesurfacemustbeidenticalsilverywhitecolor
Weidentifedthepartspassivatedandnotpassivated.thereisnochancetogetmixed.
","目測
Visualinspectionpergordensample
Thesurfacemustbeidenticalsilverywhitecolor",5pcs,"每批
1passivate,1lot.","自檢
Self-inspection
Thereisnodataneedtocollected.","返工
Theoperatortoreworked",
,,,02,"鈍化質(zhì)量passivationquality
Formanchemicalinactivesurface",,"無游離鐵
Nofreeiron","硫酸銅試驗
Coppersulfatetest
Swabthesurfacetobeinspectedwithtestsolution,keepthesurfacewetforaperiodof6min.Copperdepositwillindicatethepresenceoffreeiron.",5pcs,"每批
1passivate,1lot.","自檢
Self-inspection
Thereisnodataneedtocollected.","返工
Theoperatortoreworked",
28,"毛坯終檢
Foundryfinalinspection","卡尺及檢具
Verniercaliperandotherinspectioninstruments",01,"外觀
appearance",,"鑄件表面光潔,無鑄造缺陷
Rawcastingsurfaceisgood.
Nocastingdefect.","目測
Visualinspection
",100%,"每批
1order,1lot.
","專檢
special-inspection
Recordthethenumberofgoodpartsandthenumberofthedefectiveparts.","操作者填寫不合格品評審單提交質(zhì)量經(jīng)理評估,確定是否接收。
TheoperatortoinitiateNCMRandnotifyQAfordisposition.",
,,,02,"尺寸
Dimension",,"鑄件主要尺寸符合毛坯圖紙
Thedimensionsaccordingtocastingdrawing.
Alldimensionsinthecastingdrawing.
","量檢具
Inspectioninstruments
Calliper",5pcs,"每100件
Each100pcs","專檢
special-inspection
Theactualdimensitionshouldberecorded.",,
29,"車1
Latheofworkingprocedure1","CNC車床
CNCLathe",01,"尺寸Dimension#34
0.15±0.01",,"0.15±0.01
",Micrometer(千分尺),1pcs,Eachshift,"首檢記錄FAI1pcs
","調(diào)整并重新提交首檢
Adjustedandtoresubmitthefirstsample",
,,,,,,,,3pcs,1h,"自主檢查Selfinspection3pcs/1H
Theactualdimensitionshouldberecorded.","通知主管工程師調(diào)整,操作者重新檢驗產(chǎn)品
Toinformengineertoadjusttheoperatortorechecktheparts.",
,,,,,,,,1pcs,1h,"巡檢記錄ProcessQAreport1pcs/1H
Theactualdimensitionshouldberecorded.","全部返檢
Toinformtheoperatortostopmachiningandtorecheckallparts.
",
,,,02,"尺寸Dimension#32
Φ0.904/0.908",,Φ0.904/0.908□,"三坐標
CMM
Thecontrolplanisforprototype.Whenproduction,wewillchangeCMMtospecialgaugetocheckthedimension.
Calibrated1time1year",1pcs,Eachshift,"首檢記錄FAI1pcs
","調(diào)整并重新提交首檢
Adjustedandtoresubmitthefirstsample",
,,,,,,,,3pcs,1h,"自主檢查Selfinspection3pcs/1H
Theactualdimensitionshouldberecorded.","通知主管工程師調(diào)整,操作者重新檢驗產(chǎn)品
Toinformengineertoadjusttheoperatortorechecktheparts.",
,,,,,,,,1pcs,1h,"巡檢記錄ProcessQAreport1pcs/1H
Theactualdimensitionshouldberecorded.","全部返檢
Toinformtheoperatortostopmachiningandtorecheckallparts.
",
,,,03,"尺寸Dimension
#25
0.22±0.01",,0.22±0.01,Micrometer(千分尺),1pcs,Eachshift,"首檢記錄FAI1pcs
","調(diào)整并重新提交首檢
Adjustedandtoresubmitthefirstsample",
,,,,,,,,3pcs,1h,"自主檢查Selfinspection3pcs/1H
Theactualdimensitionshouldberecorded.","通知主管工程師調(diào)整,操作者重新檢驗產(chǎn)品
Toinformengineertoadjusttheoperatortorechecktheparts.",
,,,,,,,,1pcs,1h,"巡檢記錄ProcessQAreport1pcs/1H
Theactualdimensitionshouldberecorded.","全部返檢
Toinformtheoperatortostopmachiningandtorecheckallparts.
",
,,,04,"尺寸Dimension#33
Φ1.000±0.005",,Φ1.000±0.005,"三坐標
CMM
Thecontrolplanisforprototype.Whenproduction,wewillchangeCMMtospecialgaugetocheckthedimension.
Calibrated1time1year",1pcs,Eachshift,"首檢記錄FAI1pcs
","調(diào)整并重新提交首檢
Adjustedandtoresubmitthefirstsample",
,,,,,,,,3pcs,1h,"自主檢查Selfinspection3pcs/1H
Theactualdimensitionshouldberecorded.","通知主管工程師調(diào)整,操作者重新檢驗產(chǎn)品
Toinformengineertoadjusttheoperatortorechecktheparts.",
,,,,,,,,1pcs,1h,"巡檢記錄ProcessQAreport
Theactualdimensitionshouldberecorded.","全部返檢
Toinformtheoperatortostopmachiningandtorecheckallparts.
",
,,,05,"尺寸Dimension#23
Φ0.755/0.759",,Φ0.755/0.759□,"三坐標
CMM
Thecontrolplanisforprototype.Whenproduction,wewillchangeCMMtospecialgaugetocheckthedimension.
Calibrated1time1year",1pcs,Eachshift,"首檢記錄FAI1pcs
","調(diào)整并重新提交首檢
Adjustedandtoresubmitthefirstsample",
,,,,,,,,3pcs,1h,"自主檢查Selfinspection3pcs/1H
Theactualdimensitionshouldberecorded.","通知主管工程師調(diào)整,操作者重新檢驗產(chǎn)品
Toinformengineertoadjusttheoperatortorechecktheparts.",
,,,,,,,,1pcs,1h,"巡檢記錄
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 股份制企業(yè)合同審查文書規(guī)范指南
- 小工程施工安全合同協(xié)議書
- 《加法結(jié)合律 》(教學(xué)設(shè)計) -2024-2025學(xué)年 北師大版四年級數(shù)學(xué)上冊
- 咸寧職業(yè)技術(shù)學(xué)院《電子測試技術(shù)(下)》2023-2024學(xué)年第二學(xué)期期末試卷
- 廣西藍天航空職業(yè)學(xué)院《地學(xué)基礎(chǔ)》2023-2024學(xué)年第二學(xué)期期末試卷
- 汕頭職業(yè)技術(shù)學(xué)院《環(huán)境前沿與熱點講座》2023-2024學(xué)年第二學(xué)期期末試卷
- 重慶科技學(xué)院《室內(nèi)軟裝飾設(shè)計》2023-2024學(xué)年第二學(xué)期期末試卷
- 貴州護理職業(yè)技術(shù)學(xué)院《軟件體系結(jié)構(gòu)與設(shè)計模式》2023-2024學(xué)年第二學(xué)期期末試卷
- 湖北美術(shù)學(xué)院《牙體牙髓病學(xué)》2023-2024學(xué)年第二學(xué)期期末試卷
- 新疆輕工職業(yè)技術(shù)學(xué)院《管理文秘》2023-2024學(xué)年第二學(xué)期期末試卷
- 2025年度安徽合肥市建投集團社會招聘54人高頻重點提升(共500題)附帶答案詳解
- 2016屆高三備考建議
- 北師大版六年級下冊數(shù)學(xué)全冊表格式教案
- 2021年阿里巴巴全球數(shù)學(xué)競賽預(yù)選賽試題及參考答案
- 龐中華硬筆字帖-2500常用字-硬筆書法-描紅-全集-打印版
- 上海市崇明區(qū)2025屆高三上學(xué)期一模 英語試卷(含答案)
- 突發(fā)事件應(yīng)急預(yù)案管理辦法培訓(xùn)課件
- 國家電投《新能源電站單位千瓦造價標準值(2024)》
- 原發(fā)性肺癌臨床路徑
- 學(xué)??萍脊?jié)活動方案
- 校園食品安全和膳食經(jīng)費管理方案3篇
評論
0/150
提交評論