Project Procedure Manual項(xiàng)目管理手冊(cè)_第1頁(yè)
Project Procedure Manual項(xiàng)目管理手冊(cè)_第2頁(yè)
Project Procedure Manual項(xiàng)目管理手冊(cè)_第3頁(yè)
Project Procedure Manual項(xiàng)目管理手冊(cè)_第4頁(yè)
Project Procedure Manual項(xiàng)目管理手冊(cè)_第5頁(yè)
已閱讀5頁(yè),還剩8頁(yè)未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、.SAPC PROJECTPROJECT PROCEDURE MANUALRevDateDescriptionPreparedCheckedProject ManagerClientDisclaimerThis document has been prepared on behalf of and for the exclusive use of GASAN, and is subject to and issued in accordance with the agreement between GASAN and SAMI. The information in this document

2、 may not be disclosed to, or used by any other party without SAMIs prior written consent.184. Hepingbei Street Shenyang, LN 110001 P.R.ChinaTel: +86-24-23250043Fax: +86-24-23250041Shenyang Aluminum & Magnesium Engineering & Research Institute Company Ltd.*;REV 00 (22-Aug-11) Table of Content

3、s1EXECUTIVE SUMMARY11.1Staff Force Mobilization11.2Kick-off Meeting11.3Project Status11.4Payment11.5Key Issues and Areas of Concern12TECHNICAL QUERY33ENGINEERING43.1General43.2Achiedved This Month43.3Planed Next Month44PRICE QUOTATION65PHASE II IMPLEMENTATION PLAN66OPEN BOOK ESTIMATE67CDRL6文檔管理部分2 T

4、YPES OF DOCUMENTATION2.1 Technical Documents of Project2.1.1 Project drawings2.1.2 Project technical documents2.1.3 Standardized documents2.1.4 External drawings and documents2.2 Non-technical Documents of Project2.2.1 Correspondence2.2.2 Management documents2.2.3 Commercial documents2.3 Procedure,

5、Planning, Instructions and Statements of Projects3 PROJECT DOCUMENT NUMBERING FORMAT3.1 Numbering FormatN NNNNNN NANN NN NNN NNNN NNN3.1PrefixProject NumberingSheet NumberSequential NumberFunctional GroupPlant Area and PackageDocument TypeN refers to numeric character and A refers to alpha.3.2 Docum

6、ent Numbering Elements Explanation3.2.1 Prefix and Project Numberl Alpha character u S = SAMIu E = External (Supplier-Contractor-External Consultant)u CAS = CHALIECOu Six numeric characters (NNNNNN),prepared by the Project Management Department,or same as the Project Number for the preliminary proje

7、cte.g. CAS1117 represents GASAN CPC Project3.2.2 Plant Area and Package Numberl One alpha and three numeric characters (NANN) identified as part of plantu The first numeric character represents the Project Type, refer to Appendix Au The second alpha represents the area from the plant, refer to Appen

8、dix Bu The last two numeric characters are the Project Package, refer to Appendix Be.g. 3C01 means GPC Storage and Conveying and 3U10 means Domestic Sewage Lift Station3.2.3 Functional Groupl Two numeric characters, refer to Appendix Ce.g. 09 indicates carbon process discipline and 13 indicates layo

9、ut discipline3.2.4 Document Typel Three numeric characters, refer to Appendix De.g. 001 indicates 3D model design and 203 indicates minutes of meeting3.2.5 Sequential Numberl Four numeric characters applied to drawings and documentsl By default the Document Number Generator (DNG) will start at 0001

10、and allocate each number in strict sequence. However, the gaps are allowed in sequential numbers (e.g. drawings of a particular type can be numbered 0010, 0020, 0030 and etc.)3.2.6 Sheet Numberl Only used to drawings and not used for documents, three numeric characters applied to any single drawing

11、sequential number with multiple sheets3.3 Project Document Numbering ExamplesProject DocumentExampleProject DrawingsCAS1117-3C01-09-042-0001Project Drawings with Sheet NumberCAS1117-3C01-09-030-0001-001CAS1117-3C01-09-030-0001-002Project Technical DocumentsCAS1117-3S09-50-123-0001Minutes of MeetingC

12、AS1117-3A00-00-030-00014 GASAN CPC PROJECT ELECTRONIC FILE NAMING CONVENTION4.1 File NamingGASAN CPC Project electronic file naming convention is applicable to all documents and drawings and the convention is as follows:CAS1117-NANN-NN-NNN-NNNN-NNN_A.PDF Among which :l CAS1117-NANN-NN-NNN-NNNN-NNN m

13、ay refer to 1.1l “A” represents the edition number:alpha or numeric characterl “PDF” represents the file extension4.2 CAD File NamingIn GASAN CPC Project, CAD file can be named through design personnel using Document Number Generator (DNG) provided by PW platform, refer to the convention in

14、GASAN CPC Project Electronic File Naming ExamplesProject DocumentElectronic File NamingProject DrawingsCAS1117-3C01-09-042-0001 A.DWGProject Drawings with Sheet NumberCAS1117-3C01-09-030-0001-001_A. DWGCAS1117-3C01-09-030-0001-002 _A. DWGProject Technical DocumentsCAS1117-3S09-50-123-0001_A.PDF雙方文件傳

15、輸:使用FTP服務(wù)器作為SAMI和WorleyParsons的文件傳輸載體,SAMI文控在FTP中建立了SAMI to GASAN,SAMI to WorleyParsons,WorleyParsons to GASAN,WorleyParsons to SAMI,按照文件類(lèi)型建立不同類(lèi)型的文件夾用于存放文件。APPENDIX A LIST OF PROJECT TYPE CODESProject TypeCodeAluminum engineering 1Alumina engineering 2Carbon engineering 3APPENDIX B LIST OF PLANT ARE

16、A AND PACKAGE CODESSYSTEM NAMESYSTEM CODEUNIT NAMEUNIT CODECODEMiscellaneousAMiscellaneous003A00Carbon systemCGPC Storage and Conveying013C01Shaft Kiln023C02CPC Storage and Conveying033C03Lab and Control Center123C12Accessory SystemSGeneral Storage Warehouse093S09General Maintenance Workshop103S10ut

17、ilityU13.8kV Power Distribution Room023U02Natural Gas Regulating Station073U07Booster pump house for the plant 093U09Domestic sewage treatment station103U10Production Waste Water Treatment Station113U11Waste Heat Boiler House123U12Circulating Water System for Shaft Kiln203U20Steam Turbine Generator

18、House223U22Chemistry Water Treatment233U23De-sulphuring System253U25Truck scale283U28Seawater pump house373U37Compressed air station413U41General Layout, Road and Vertical Planning443U44Fence, Gate and Guardroom453U45Piping and Cabling Network463U46Production Waste Water Collecting Pond703U70Rainwat

19、er collecting pond713U71Welfare WAdministrative Office Building013W01Canteen and Smoking Shelter063W06Parking Lot103W10Dispatch Office and Drivers lounge113W11Prayer Hall123W12Out-factoryEPatrol Road016E01APPENDIX C LIST OF FUNCTIONAL GROUP CODESDisciplinecodeCarbon process09Layout13Thermal engineer

20、ing14Water supply and drainage15Environmental assessment16Structure35Architecture40Ventilation 45Mechanical repair50Power supply70Automation 75Telecommunication76Project management90Procurement 91Project control92File management and control93Project design management95Application system and IT technical support96APPENDIX D LIST OF DOCUMENT TYPE CODESDocument typeCodeDocument typeCode3D Models-Design001Panel Layout090Plan Profiles012Power and Control Layout092Site Layout014Cable Raceway Layout093Component drawing018Earthing Layout094Installation

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論