1、TECHNICAL SPECIFICATIONS FORINSTALLATION OF MECHNICAL EQUIPMENT11.1HIGHLIGHTS OF CONSTRUCTIONCon structi on prec on diti ons of Equipme nt In stallati onThe desig n docume nt and other tech ni cal docume nts are all ready, the con struct iondrawings have been jointly checked up, technique clarificat
2、ion and necessary tech ni cal training shall have bee naccomplished.Relative foundation and trench work shall have been finished , the concrete strength shall not be lower tha n 75% of desig n stre ngth.1.2Accepta nee of Equipme nt Foun dati onAccepta nee of Civil DataQuality certificate.Survey Reco
3、rd and other con structi on data shall be ready.Foun dati on check ingThe position, geometry dimension and quality requirements of the equipment foun dati on shall comply with the con structi on draw ings and the Code for Con struction and Accepta nee of Con crete Structures (GB50204-92).Both the fo
4、un dati on surface of the equipme nt and the reserved holes of an chor boltsshall be clea ned up, the screw thread and the nut of the embeddedan chor bolt shallbe kept in good con diti on.The allowable tolerance of equipment foundation dimensions refer to table 1:Table 1ItemsAllowable Tolera nce (mm
5、)Coordin ate positi on (Lon gitudi nal & tra nsverse)± 20Elevati on of differe nt pla ne20Pla ne outl ine dime nsion± 20Pla ne outl ine dime nsion of protrudi ng platform20Dime nsion of con cave hole+ 20Leve In ess of pla nePer meter5(In cludi ng parts where equipme ntwould be in stall
6、ed on the levelground)Total le ngth10Plumb nessPer meter5Total le ngth10Elevation (top)+ 20Cen ter-to-ce nterEmbedded an chor bolt(from the top to the± 2bottom)Cen tral positi on± 10Depth+ 20Embedded an chor bolt holePlumb ness of theinternal surface of10the hole per meterElevati on+ 20Emb
7、edded an chor bolt activeCen tral positi on± 5an chor plateLeve In ess (an chorboard with slot) per5meterLeve In ess (an chor board with screw threaded hole) per meter21.3 Un pack ing In spect ion of Equipme ntUn pack ing in spect ion of equipme nt shall be executed un der the supervisi onof th
8、eOwner 'pers onn el, Con tractor shall in spect the follow ing items:Appearance , quantity, specification and model of the equipmentPack ing list and other tech ni cal dada.During the in specti on Con tractor shall keep all the records.Equipme nt , spare parts and special tools shall be carefull
9、y kept.1.4 In stallati on of Equipme nt1.4.1Positi oning and Alig ning of Equipme ntThe baseli ne of in stallati on shall be desig nated accord with con struct ion draw ing andrelating axis, edge line or elevation line before equipment positioning.The allowable tolerance of of the distance from plan
10、e installation bench mark to actual foundation axis or between actual shop wall axis and edge line is± 20mm.Refer to Table 2 for the allowable tolerance of plane position and elevation of the positi oning pla ne, li ne or point to bench mark:Table2ItemsAllowable Tolera nce (mm)Plane positi onEl
11、evati onWithout mecha ni cal relati ons with otherequipme nt± 10+ 2010With mecha ni cal relati ons with otherequipme nt± 2± 1Checked itemAllowable Tolera nee (mm)Common equipme ntEquipme nts Conn ected witMachi nesVerticalHoriz on talVerti calHoriz on talCen ter-to-ce nterD 2000 ,
12、7; 5D 2000 ,± 10± 5± 3± 3Elevati on± 5± 5Relative elevati on ±3Relative elevation ± 3Level nessaxial , L/1000 radial , 2D/1000axial, 0.6L/1000radial ,2D/1000Plumb nessH/1000But not more tha n 30H/1000Orie ntati onMeasure along circumfere nee of baseD 2000,10D&
13、gt;2000,15Measure along the circumfere nee of base5142An ehor BoltThe Anehor bolt in the reserved hole shall accord with the requirement of con struct ion draw ing and desig n doeume nt; the requireme nt below must be followed if no other special in struct ions are available:(1) An chor bolt shall b
14、e vertical in reserved hole free of in cli ning.(2) The dista nee betwee n any part of an chor bolt to the hole wall shall be larger than 15mm, and the bolt end shouldn ' touch hole bottom.(3) The oil dirt and oxidized surface of anchor bolt shall be clear away, a little grease shall be applied
15、to the screw thread of the an chor bolt.(4) There shall be no distance between the nut and the gasket, and so are the gasket and the pedestal of the equipment.(5) Bolt shall extend out of nut after nut fastening; the exposed length is about 1/3-2/3 of the diameter value of the bolt.(6) The anchor bl
16、ot shall be fastened while concrete strength in reserved reachesmore than than 75% designed value, the fastening strength shall be evenly.Iron ShimThe shim size for level adjusting of equipment shall accord with the requirement of construction drawings or technical documents.The common wedge shim an
17、d flat shim shall be selected according to Appendix 5 of the Construction & Acceptance Criterion of Machine & Equipment Installation Works (GB50231-98).GroutingThe grouting between the foundation and pedestal of the equipment/the reserved hole of the anchor bolt shall comply with the Code fo
18、r Construction and Acceptance of Concrete Structures (GB50204-92).The grouting place shall be cleaned up before grouting. The concrete grade used for grouting is one grade higher than that used for foundation or ground. Grounding shouldn 't make anchor bolt inclined or affect installing precisio
19、n of the equipment.The thickness of grouting layer shall accord with design requirement, commonly not less than 25mm.The outer forms shall be laid before grouting, the distance of outer forms from outer edge of equipment base shouldn 't less than 60mm; Float coat shall be applied to the surface
20、after removal of forms.The inner forms shall be laid when complete grouting is not needed under equipment base and grouting layer would bear load of equipment.Assembly of EquipmentThe assembly of equipment shall accord with the requirement of construction drawings, technical documents of manufacture
21、r and Code for Construction & Acceptance of Machine & Equipment Installation Works (GB50231-98).Before the equipment assembly, the Contractor shall be familiar with the equipment structure and the technical requirements of equipment assembly. Recheck and cleaning treating on match dimension,
22、 relating precision, match face and sliding face of assembly parts shall be done, and the assembly shall be performed according to marks and assemble sequence.As to equipment or parts have inner cavity, careful check and clearance must be done before concealing avoid any foreign substance contained
23、in it.As to oil tank or water tank that difficult to disassembly, check and fix, leakage examination must be done before assembly.Installation of Equipment AccessoriesThe installation of tower and inner parts of equipment shall accord with the requirement of construction drawings and Code for Constr
24、uction & Acceptance of Machine & Equipment Installation Works (GB50231-98).The installation of inner parts of pump shall accord with the requirement of construction drawings and Construction, Code for Construction and Acceptance of Compressor, Fan and Pump Installation Works (GB50275-98).The
25、 installation, pressure testing of accessory pipe shall accord with the requirement of construction drawings and Code for Construction and Acceptance of Industrial Piping Works (GB50236-98).The installation of accessory ladder, platform shall accord with the requirement of construction drawings and
26、Code for Construction and Acceptance of Steel Structure Works (GB50205-95).1.4.7 Equipment TestAfter the installation completed, all the welding seams of pressure vessel shall be checked according to the Assessment on Welding Technology of Pressure Vessel (JB4708-92) and make record.Pressure experim
27、ent shall be performed to pressure container accord with constructing instructions and design requirement after installation.The pressure & leakage test shall be executed according to the Construction Explanation and the Design Requirements after the installation of stove type and familiar equip
28、ments that have water double layer.1.4.8 Cleaning and Purging of EquipmentWhen the installation of pump equipment completed, cleaning and purged of such equipment must be carried out according to construction drawings and Construction, Checking and Construction, Code for Construction and Acceptance
29、of Compressor, Fan and Pump Installation Works (GB50275-98).The cleaning and purging of static equipment must be performed after installation according to construction drawings and Code for Construction & Acceptance of Machine & Equipment Installation Works (GB50231-98).1.4.9 Test-run of EquipmentThe conditions, contents and procedure shall be ready before equipment test-run, as specified in Code for Construction & Acceptance of Machine & Equipment Installation Works (GB50231-98).Make good
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年山東嵐山融資擔保有限公司招聘筆試參考題庫含答案解析
- 2025年滬教新版高一數(shù)學上冊階段測試試卷含答案
- 2025年度個人二手車買賣合同協(xié)議書2篇
- 2025年魯人新版選修化學下冊月考試卷
- 二零二五年度國際物流運輸服務合同14篇
- 2025版網(wǎng)絡(luò)安全風險評估與應急預案合同4篇
- 二零二五年度木工機械操作人員勞務租賃合同4篇
- 2025年外研版選修四歷史下冊月考試卷
- 2025年湘教版九年級歷史下冊月考試卷
- 2024年度陜西省公共營養(yǎng)師之四級營養(yǎng)師通關(guān)提分題庫及完整答案
- 第十七章-阿法芙·I·梅勒斯的轉(zhuǎn)變理論
- 焊接機器人在汽車制造中應用案例分析報告
- 合成生物學在生物技術(shù)中的應用
- 中醫(yī)門診病歷
- 廣西華銀鋁業(yè)財務分析報告
- 無違法犯罪記錄證明申請表(個人)
- 大學生勞動教育PPT完整全套教學課件
- 繼電保護原理應用及配置課件
- 《殺死一只知更鳥》讀書分享PPT
- 蓋洛普Q12解讀和實施完整版
- 2023年Web前端技術(shù)試題
評論
0/150
提交評論