版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、一、規(guī)劃專業(yè)英語規(guī)劃專業(yè)英語規(guī)劃詞典環(huán)境、基礎(chǔ)設(shè)施、交通運(yùn)輸環(huán)境設(shè)計(jì)( Environmental design ) 環(huán)境標(biāo)準(zhǔn)( Environmental standards )能源保護(hù)( Energy conservation )基礎(chǔ)設(shè)施( Infrastructure ) 主干道 ( Arterial road )輔助道路( Collector street )快速干道( Freeway ) 林蔭公路( Parkway )居住面積密度( Density of living floor area ) 居住建筑面積密度( Density of residential floor area )
2、 居住人口密度( Density of registered inhabitants ) 人口密度( Population density ) 人口分布( Population distribution ) 人口機(jī)械增長( Population growth from migration ) 居住密度( Residential density ) 高層高密度( High-rise/high density ) 高層低密度( High-rise/low density ) 建筑面積比( Floor-area ratio ) 居住建筑面積( Residential floor area ) 建筑高
3、度( Building height ) 建筑紅線( Building line ) 城市設(shè)計(jì)( Urban design ) 城市景觀( Cityscape ) 天際線( Skyline ) 空間布局( Space planning ) 城市網(wǎng)絡(luò) ( Urban network)臨街面( Frontage ) 歷史文化名城保護(hù)( Conservation of Historic Cultural Cities ) 古建筑保護(hù)( Conservation of historic buildings ) 文物古跡保護(hù)( Conservation of historic landmarks and
4、 sites ) 歷史性建筑保護(hù)( Historic preservation ) 風(fēng)景名勝保護(hù)( Conservation of scenic spots ) 歷史性市區(qū)( Historic district ) 綠帶( Greenbelt ) 城市規(guī)劃( Urban planning )總體規(guī)劃( Comprehensive planning )詳細(xì)規(guī)劃( Detailed planning ) 城市分區(qū)規(guī)劃( City district planning ) 功能規(guī)劃( Functional planning ) 住房建設(shè)規(guī)劃( Housing program ) 實(shí)體規(guī)劃( Physi
5、cal planning ) 城市性質(zhì)( Designated function of a city ) 豎向規(guī)劃( Site engineering )國土規(guī)劃( Territorial planning ) 建設(shè)場地規(guī)劃( Site planning ) 城市人防規(guī)劃( Civil defense planning ) 城市防災(zāi)規(guī)劃(Disaster planning ) 城市抗震規(guī)劃( Seismic planning ) 臨界分析(門檻理論)( Threshold analysis ) 用地平衡( Land use banlance ) 土地使用控制( Land use control
6、s ) 土地利用規(guī)劃圖( Land use plan ) 土地利用調(diào)查( Land use survey ) 城市用地評價(jià)( Land use assessment ) 城市規(guī)模( City size ) 商業(yè)網(wǎng)點(diǎn)( Commercial network ) 城市改造( Urban redevelopment ) 地形測量( Topographic survey ) 區(qū)位理論( Location Theory ) 可持續(xù)發(fā)展( Sustainable development ) 二、結(jié)構(gòu)工程常用詞匯結(jié)構(gòu)工程常用詞匯混凝土:concrete 鋼筋:reinforcing steel bar鋼筋混
7、凝土:reinforced concrete(RC)鋼筋混凝土結(jié)構(gòu):reinforced concrete structure板式樓梯:cranked slab stairs剛度:rigidity徐變:creep水泥:cement鋼筋保護(hù)層:cover to reinforcement梁:beam柱:column板:slab剪力墻:shear wall基礎(chǔ):foundation剪力:shear剪切變形:shear deformation剪切模量:shear modulus拉力:tension壓力:pressure延伸率:percentage of elongation位移:displaceme
8、nt 應(yīng)力:stress應(yīng)變:strain應(yīng)力集中:concentration of stresses應(yīng)力松弛:stress relaxation應(yīng)力圖:stress diagram應(yīng)力應(yīng)變曲線:stress-strain curve應(yīng)力狀態(tài):state of stress鋼絲:steel wire箍筋:hoop reinforcement箍筋間距:stirrup spacing加載:loading抗壓強(qiáng)度:compressive strength抗彎強(qiáng)度:bending strength抗扭強(qiáng)度:torsional strength抗拉強(qiáng)度:tensile strength裂縫:crack屈
9、服:yield屈服點(diǎn):yield point屈服荷載:yield load屈服極限:limit of yielding屈服強(qiáng)度:yield strength屈服強(qiáng)度下限:lower limit of yield 荷載:load橫截面:cross section承載力:bearing capacity承重結(jié)構(gòu):bearing structure彈性模量:elastic modulus預(yù)應(yīng)力鋼筋混凝土:prestressed reinforced concrete預(yù)應(yīng)力鋼筋:prestressed reinforcement預(yù)應(yīng)力損失:loss of prestress預(yù)制板:precast sl
10、ab現(xiàn)澆鋼筋混凝土結(jié)構(gòu):cast-in-place reinforced concrete雙向配筋:two-way reinforcement主梁:main beam次梁:secondary beam彎矩:moment懸臂梁:cantilever beam延性:ductileity受彎構(gòu)件:member in bending受拉區(qū):tensile region受壓區(qū):compressive region塑性:plasticity軸向壓力:axial pressure軸向拉力:axial tension吊車梁:crane beam可靠性:reliability粘結(jié)力:cohesive force
11、外力:external force彎起鋼筋:bent-up bar彎曲破壞:bending failure屋架:roof truss素混凝土:non-reinforced concrete無梁樓蓋:flat slab配筋率:reinforcement ratio配箍率:stirrup ratio泊松比:Poissons ratio偏心受拉:eccentric tension偏心受壓:eccentric compression偏心距:eccentric distance疲勞強(qiáng)度:fatigue strength偏心荷載:eccentric load跨度:span跨高比:span-to-depth
12、 ratio跨中荷載:midspan load框架結(jié)構(gòu):frame structure集中荷載:concentrated load分布荷載:distribution load分布鋼筋:distribution steel撓度:deflection設(shè)計(jì)荷載:design load設(shè)計(jì)強(qiáng)度:design strength構(gòu)造:construction簡支梁:simple beam截面面積:area of section澆注:pouring澆注混凝土:concreting鋼筋搭接:bar splicing剛架:rigid frame脆性:brittleness脆性破壞:brittle failure
13、三、項(xiàng)目管理英文詞匯項(xiàng)目管理英文詞匯ABC Activity Based Costing 基于活動(dòng)的成本核算 ABM Activity Based Management 基于活動(dòng)的管理 ACWP Actual Cost of Work Performed 已完成工作實(shí)際成本 ADM Arrow Diagram Method 箭線圖方法 ADP Automated Data Processing 自動(dòng)化數(shù)據(jù)處理 ADR Alternative Dispute Resolution 替代爭議解決方案 AF Actual Finish Date 實(shí)際完成日期 AFE Application for
14、Expenditure 支出申請 AFE Authority for Expenditure 開支權(quán) ALAP As-Late-As-Possible 盡可能晚 AMR Advanced Material Release 材料提前發(fā)布 AOA Activity on Arc 弧線表示活動(dòng)雙代號網(wǎng)絡(luò) AOA Activity on Arrow 箭線表示活動(dòng)雙代號網(wǎng)絡(luò) AON Activity on Node 節(jié)點(diǎn)表示活動(dòng)單代號網(wǎng)絡(luò) AOQ Average Outgoing Quality 平均出廠質(zhì)量AOQL Average Outgoing Quality Limit 平均出廠質(zhì)量限度APMA
15、 Area of Project Management Application 項(xiàng)目管理的應(yīng)用領(lǐng)域APR Acquisition Plan Review 采購計(jì)劃評審AQL Acceptable Quality Level 可接受質(zhì)量水平AS Actual Start Date 實(shí)際開始日期ASAP As-Soon-As-Possible 盡快ATP Acceptance Test Procedure 驗(yàn)收測試過程AUW Authorized Unpriced Work 批準(zhǔn)的未定價(jià)工作 BAC Budget at Completion 完工預(yù)算BAC Baseline at Completi
16、on 完成/完工基線BATNA Best Alternative to Negotiated Agreement 協(xié)議外最佳方案BCM Business Change Manager 商業(yè)變更經(jīng)理BCWP Budgeted Cost of Work Performed 已完工作預(yù)算成本BCWS Budgeted Cost of Work Scheduled 計(jì)劃工作的預(yù)算成本BEC Elapsed Cost 計(jì)劃工作的預(yù)算成本BOOT Build, Own, Operate, Transfer 建造擁有經(jīng)營轉(zhuǎn)讓BPA Blanket Purchase Agreement 一攬子采購協(xié)議BSA
17、Balanced Scorecard Approach 平衡記分卡方法C/SCSC Cost/Schedule Control System Criteria 成本控制系統(tǒng)標(biāo)準(zhǔn)?C/SSR Cost/Schedule Status Report 成本/進(jìn)度狀態(tài)報(bào)告CA Control Account 控制帳目CAD Computer Aided Drafting/Design 計(jì)算機(jī)輔助制圖/設(shè)計(jì)CAM Cost Account Manager 成本帳目經(jīng)理CAM Computer Aided Manufacturing 計(jì)算機(jī)輔助制造CAM Control Account Manager 控
18、制帳目經(jīng)理CAP Cost Account Plan 成本帳目計(jì)劃CAP Control Account Plan 控制帳目計(jì)劃CAR Capital Appropriation Request 資本劃撥請求CBD Component-Based Development 基于構(gòu)件的開發(fā)CBS Cost Breakdown Structure 成本分解結(jié)構(gòu)CCB Change Control Board 變更管理委員會CCDR Contractor Cost Data Report 承包商成本數(shù)據(jù)報(bào)告CDR Critical Design Review 關(guān)鍵設(shè)計(jì)評審CI Configuratio
19、n Item 配置項(xiàng)CM Configuration Management/Construction Management 配置管理/施工管理CPFFC Cost Plus Fixed Fee Contract 成本加固定費(fèi)用合同CPI Cost Performance Index 成本績效指數(shù)CPI Cost Performance Indicator 成本績效指數(shù)CPIFC Cost Plus Incentive Fee Contract 成本加獎(jiǎng)勵(lì)費(fèi)用合同CPM Critical Path Method 關(guān)鍵路徑法CPN Critical Path Network 關(guān)鍵路徑網(wǎng)絡(luò)圖CPPC
20、 Cost Plus Percentage of Cost Contract 成本加成本百分比合同CPR Cost Performance Ratio 成本績效比率CPR Cost Performance Report 成本績效報(bào)告CPU Central Processing Unit 中央處理單元CR Change Request 變更請求CSCI Computer Software Configuration Item 計(jì)算機(jī)軟件配置CSF Critical Success Factors 關(guān)鍵的成功因素CTC Contract Target Cost 合同目標(biāo)成本CTP Contract
21、 Target Price 合同目標(biāo)價(jià)格CTR Cost-Time Resource Sheet 成本時(shí)間資源表CV Cost Variance 成本偏差CWBS Contract Work Breakdown Structure 合同工作分解結(jié)構(gòu)DBA Database Administrator 數(shù)據(jù)庫管理員DBM Dynamic Baseline Model 動(dòng)態(tài)基線模型DBMS Database Management System 數(shù)據(jù)庫管理系統(tǒng)DCE Distributed Computing Environment 分布式計(jì)算環(huán)境DCF Discounted Cash Flow 折
22、現(xiàn)現(xiàn)金流DD Data Date 數(shù)據(jù)日期DID Data Item Description 工作項(xiàng)描述DRD documentation Requirements Description 文檔要求說明DU Duration 工期持續(xù)時(shí)間EAC Estimated Actual at Completion 實(shí)際完工估算ECC Estimated Cost to Complete 尚未完成的成本估算ECP Engineering Change Proposal 工程變更建議書EF Early Finish Date 最早完成日期EFC Estimated Final Cost 估算的最終成本EM
23、R Expenditure Management Report 支出管理報(bào)告EPS Enterprise Project Structure 企業(yè)項(xiàng)目結(jié)構(gòu)ERP Enterprise Resource Planning 企業(yè)資源規(guī)劃ERPS Enterprise Resource Planning Systems 企業(yè)資源規(guī)劃系統(tǒng)ES Early Start Date 最早開始日期ESAR Extended Subsequent Applications Review 擴(kuò)展后續(xù)應(yīng)用評審ETC Estimate To Complete 尚未完成/完工的估算EV Expected value 期望
24、值EVMS Earned value Management System 掙值管理系統(tǒng)FAC Forecast At Completion 完工預(yù)測FF Free Float 自由浮動(dòng)時(shí)間FFP Firm Fixed Price Contract 嚴(yán)格固定價(jià)格合同F(xiàn)IFO First In, First Out 先進(jìn)先出FM Functional Manager 職能經(jīng)理FP Fixed Price Contract 固定價(jià)格合同F(xiàn)PPIF Fixed Price Plus Incentive Fee Contract 固定價(jià)格加激勵(lì)酬FTC Forecast to Completion 完工
25、尚需預(yù)測FTP File Transfer Protocol 文件傳輸協(xié)議G&A General and Administrative Costs 綜合行政管理成本G&A General and Administrative 綜合行政管理費(fèi)GAAP Generally Accepted Accounting Principles 公認(rèn)會計(jì)原則GERT Graphical Evaluation and Review Technique 圖形評審技術(shù)GUI Graphical User Interface 圖形用戶界面四、建筑專業(yè)結(jié)構(gòu)英語詞匯A
26、 acceptable quality 合格質(zhì)量acceptance lot 驗(yàn)收批量acierate 鋼材admixture 外加劑against slip coefficient between friction surface of high-strength
27、bolted connection 高強(qiáng)度螺栓摩擦面抗滑移系數(shù)aggregate 骨料air content 含氣量air-dried timber 氣干材allowable ratio of height to sectional thickness of masonry wall or column
28、 砌體墻、柱容許高厚比allowable slenderness ratio of steel member 鋼構(gòu)件容許長細(xì)比allowable slenderness ratio of timber compression member 受壓木構(gòu)件容許長細(xì)比allowable stress range of fatigue
29、 疲勞容許應(yīng)力幅allowable ultimate tensile strain of reinforcement 鋼筋拉應(yīng)變限值allowable value of crack width 裂縫寬度容許值allowable value of deflection of structural member 構(gòu)件撓度容許值allowable value
30、of deflection of timber bending member 受彎木構(gòu)件撓度容許值allowable value of deformation of steel member 鋼構(gòu)件變形容許值allowable value of deformation of structural member 構(gòu)件變形容許值allowable value of drift a
31、ngle of earthquake resistant structure 抗震結(jié)構(gòu)層間位移角限值amplified coefficient of eccentricity 偏心距增大系數(shù)anchorage 錨具anchorage length of steel bar 鋼筋錨固長度approval
32、analysis during construction stage 施工階段驗(yàn)算arch 拱arch with tie rod 拉捍拱archshaped roof truss 拱形屋架area of shear plane 剪
33、面面積area of transformed section 換算截面面積aseismic design 建筑抗震設(shè)計(jì)assembled monolithic concrete structure 裝配整體式混凝土結(jié)構(gòu)automatic welding 自動(dòng)焊接auxiliary steel bar
34、160; 架立鋼筋B backfilling plate 墊板balanced depth of compression zone 界限受壓區(qū)高度balanced eccentricity 界限偏心距bar splice
35、0; 鋼筋接頭bark pocket 夾皮batten plate 綴板beam 次梁bearing plate of notch 齒承壓面(67)bearing plate 支承板
36、(52)bearing stiffener 支承加勁肋(52)bent-up steel bar 彎起鋼筋(35)block 砌塊(43)block masonry 砌塊砌體(44)block masonry structure
37、砌塊砌體結(jié)構(gòu)(41)blow hole 氣孔(62)board 板材(65)bolt 螺栓(54)bolted connection (鋼結(jié)構(gòu))螺栓連接(59)bolted joint (木結(jié)構(gòu))螺栓連接(69)bolted st
38、eel structure 螺栓連接鋼結(jié)構(gòu)(50)bonded prestressed concrete structure 有粘結(jié)預(yù)應(yīng)力混凝土結(jié)構(gòu)(24)bow 順彎(71)brake member 制動(dòng)構(gòu)件(7)breadth of wall between windows
39、 窗間墻寬度(46)brick masonry 磚砌體(44)brick masonry column 磚砌體柱(42)brick masonry structure 磚砌體結(jié)構(gòu)(41)brick masonry wall 磚砌體墻(42)broadlea
40、ved wood 闊葉樹材(65)building structural materials 建筑結(jié)構(gòu)材料(17)building structural unit 建筑結(jié)構(gòu)單元(building structure 建筑結(jié)構(gòu)(2builtup steel column
41、; 格構(gòu)式鋼柱(51bundled tube structure 成束筒結(jié)構(gòu)(3burnthrough 燒穿(62butt connection 對接(59butt joint 對接(70)butt weld
42、0; 對接焊縫(60)C calculating area of compression member 受壓構(gòu)件計(jì)算面積(67)calculating overturning point 計(jì)算傾覆點(diǎn)(46)calculation of load-carrying capacity of member
43、160;構(gòu)件承載能力計(jì)算(10)camber of structural member 結(jié)構(gòu)構(gòu)件起拱(22)cantilever beam 挑梁(42)cap of reinforced concrete column 鋼筋混凝土柱帽(27)carbonation of concrete 混凝土碳化(
44、30)cast-insitu concrete slab column structure 現(xiàn)澆板柱結(jié)構(gòu)cast-insitu concrete structure 現(xiàn)澆混凝土結(jié)構(gòu)(25)cavitation 孔洞(39)cavity wall 空斗墻(42)cement
45、160; 水泥(27)cement content 水泥含量(38)cement mortar 水泥砂漿(43)characteristic value of live load on floor or roof 樓面、屋面活荷載標(biāo)準(zhǔn)值(14)characteristic value of wind load
46、60; 風(fēng)荷載標(biāo)準(zhǔn)值(16)characteristic value of concrete compressive strength 混凝土軸心抗壓強(qiáng)度標(biāo)準(zhǔn)值(30)characteristic value of concrete tensile strength 混凝土軸心抗拉標(biāo)準(zhǔn)值(30)characteristic value of cubic concrete compressive strength&
47、#160; 混凝土立方體抗壓強(qiáng)度標(biāo)準(zhǔn)值(29)characteristic value of earthquake action 地震作用標(biāo)準(zhǔn)值(16)characteristic value of horizontal crane load 吊車水平荷載標(biāo)準(zhǔn)值(15)characteristic value of masonry strength
48、 砌體強(qiáng)度標(biāo)準(zhǔn)值(44)characteristic value of permanent action· 永久作用標(biāo)準(zhǔn)值(14)characteristic value of snowload 雪荷載標(biāo)準(zhǔn)值(15) characteristic value of streng
49、th of steel 鋼材強(qiáng)度標(biāo)準(zhǔn)值(55) characteristic value of strength of steel bar 鋼筋強(qiáng)度標(biāo)準(zhǔn)值(31) cha
50、racteristic value of uniformly distributed live load 均布活標(biāo)載標(biāo)準(zhǔn)值(14) characteristic value of variable action 可變作用標(biāo)準(zhǔn)值(14)
51、; characteristic value of vertical crane load 吊車豎向荷載標(biāo)準(zhǔn)值(15) characteristic value of material strength 材料強(qiáng)度標(biāo)準(zhǔn)值(18)
52、160; checking section of log structural member·, 原木構(gòu)件計(jì)算截面(67) chimney 煙囪(3)
53、0; circular doublelayer suspended cable 圓形雙層懸索(6) circular singlelayer suspended cable 圓形單層懸索(6)
54、 circumferential weld 環(huán)形焊縫(60) classfication for earthquakeresistance of buildings· 建筑結(jié)構(gòu)抗震設(shè)防類別(9)
55、 clear height 凈高(21) clincher 扒釘(?0) coefficient of equivalent b
56、ending moment of eccentrically loaded steel memher(beam-column) 鋼壓彎構(gòu)件等效彎矩系數(shù)(58) cold bend inspection of steelbar 冷彎試驗(yàn)(39)cold drawn bar
57、; 冷拉鋼筋(28)cold drawn wire 冷拉鋼絲(29)coldformed thinwalled sectionsteel 冷彎薄壁型鋼(53)cold-formed thin-walled steel structure· 冷彎薄壁型鋼結(jié)構(gòu)(50)coldrolled deformed bar
58、; 冷軋帶肋鋼筋(28)column bracing 柱間支撐(7)combination value of live load on floor or roof 樓面、屋面活荷載組合值(15)compaction 密實(shí)度(37)compliance control
59、合格控制(23)composite brick masonry member 組合磚砌體構(gòu)件(42)composite floor system 組合樓蓋(8)composite floor with profiled steel sheet 壓型鋼板樓板(8)composite mortar 混合砂漿
60、(43)composite roof truss 組合屋架(8)composite member 組合構(gòu)件(8)compound stirrup 復(fù)合箍筋(36) compression member with large eccentricity·
61、160; 大偏心受壓構(gòu)件(32) compression member with small eccentricity· 小偏心受壓構(gòu)件(32) compressive strength at an angle with slope of grain 斜紋承壓強(qiáng)度(66
62、) compressive strength perpendicular to grain 橫紋承壓強(qiáng)度(66) concentration of plastic deformation 塑性變形集中(9) conceptual
63、earthquakeresistant design 建筑抗震概念設(shè)計(jì)(9) concrete 混凝土(17) concrete column 混凝土柱(26)
64、60;concrete consistence 混凝土稠度(37) concrete foldedplate structure 混凝土折板結(jié)構(gòu)(26) concrete foundation 混凝土基礎(chǔ)(27)
65、160; concrete mix ratio 混凝土配合比(38) concrete wall 混凝土墻(27) concrete-filled steel tubular member
66、160;鋼管混凝土構(gòu)件(8) conifer 針葉樹材(65) coniferous wood 針葉樹材(65)connecting plate 連接板(52)connection
67、; 連接(21)connections of steel structure 鋼結(jié)構(gòu)連接(59)connections of timber structure 木結(jié)構(gòu)連接(68)consistency of mortar 砂漿稠度(48)constant crosssection column
68、; 等截面柱(7)construction and examination concentrated load 施工和檢修集中荷載(15)continuous weld 連續(xù)焊縫(60)core area of section 截面核芯面積(33)core tube supported structure
69、; 核心筒懸掛結(jié)構(gòu)(3)corrosion of steel bar 鋼筋銹蝕(39)coupled wall 連肢墻(12)coupler 連接器(37)coupling wallbeam 連梁(12)coupling wallcolumn.
70、0; 墻肢(12)coursing degree of mortar 砂漿分層度(48)cover plate 蓋板(52)covered electrode 焊條(54)crack 裂縫(?0)crack resistance &
71、#160; 抗裂度(31)crack width 裂縫寬度(31)crane girder 吊車梁(?)crane load 吊車荷載(15)creep of concrete 混凝土徐變(30)crook 橫彎(71)
72、cross beam 井字梁(6)cup 翹彎curved support 弧形支座(51)cylindrical brick arch 磚筒拱(43)D decay
73、 腐朽(71)decay prevention of timber structure 木結(jié)構(gòu)防腐(70)defect in timber 木材缺陷(70)deformation analysis 變形驗(yàn)算(10)degree of gravity vertical for structure or structural member·
74、60; 結(jié)構(gòu)構(gòu)件垂直度(40)degree of gravity vertical forwall surface 墻面垂直度(49)degree of plainness for structural member 構(gòu)件平整度(40)degree of plainness for wall surface 墻面平整度(49)d
75、epth of compression zone 受壓區(qū)高度(32)depth of neutral axis 中和軸高度(32)depth of notch 齒深(67)design of building structures 建筑結(jié)構(gòu)設(shè)計(jì)(8)design value of earthquake-
76、resistant strength of materials 材料抗震強(qiáng)度設(shè)計(jì)值(1design value of loadcarrying capacity of members· 構(gòu)件承載能力設(shè)計(jì)值(1designations 0f steel 鋼材牌號(53design value of material strength
77、; 材料強(qiáng)度設(shè)計(jì)值(1destructive test 破損試驗(yàn)(40detailing reinforcement 構(gòu)造配筋(35detailing requirements 構(gòu)造要求(22diamonding 菱形變形(71)diaphragm
78、60; 橫隔板(52dimensional errors 尺寸偏差(39)distribution factor of snow pressure 屋面積雪分布系數(shù)dogspike 扒釘(70)double component concrete column
79、0;雙肢柱(26)dowelled joint 銷連接(69)down-stayed composite beam 下?lián)问浇M合粱(8)ductile frame 延性框架(2)dynamic design 動(dòng)態(tài)設(shè)計(jì)(8)E ear
80、thquake-resistant design 抗震設(shè)計(jì)(9:earthquake-resistant detailing requirements 抗震構(gòu)造要求(22)effective area of fillet weld 角焊縫有效面積(57)effective depth of section
81、0;截面有效高度(33) effective diameter of bolt or high-strength bolt· 螺栓(或高強(qiáng)度螺栓)有效直徑(57) effective height 計(jì)算高度(21) ef
82、fective length 計(jì)算長度(21) effective length of fillet weld 角焊縫有效計(jì)算長度(48) effective length of nail 釘有效長度(56)
83、0; effective span 計(jì)算跨度(21) effective supporting length at end of beam 梁端有效支承長度(46) effective thickness of fillet weld
84、60; 角焊縫有效厚度(48) elastic analysis scheme 彈性方案(46) elastic foundation beam 彈性地基梁(11) elastic
85、foundation plate 彈性地基板(12) elastically supported continuous girder· 彈性支座連續(xù)梁(u) elasticity modulus of materials
86、;材料彈性模量(18) elongation rate 伸長率(15) embeded parts 預(yù)埋件(30) enhanced coefficient of local bearing strength of materials· 局部抗壓強(qiáng)度提高系數(shù)(14) entrapped air 含氣量(38) equilibrium moisture content 平衡含水率(66)
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年山東電力高等??茖W(xué)校高職單招職業(yè)技能測試近5年??及鎱⒖碱}庫含答案解析
- 2025年山東司法警官職業(yè)學(xué)院高職單招職業(yè)適應(yīng)性測試近5年常考版參考題庫含答案解析
- 2025年安徽電氣工程職業(yè)技術(shù)學(xué)院高職單招職業(yè)技能測試近5年??及鎱⒖碱}庫含答案解析
- 2025年安徽衛(wèi)生健康職業(yè)學(xué)院高職單招職業(yè)適應(yīng)性測試近5年??及鎱⒖碱}庫含答案解析
- 2025年培黎職業(yè)學(xué)院高職單招語文2018-2024歷年參考題庫頻考點(diǎn)含答案解析
- 2025年廈門東海職業(yè)技術(shù)學(xué)院高職單招語文2018-2024歷年參考題庫頻考點(diǎn)含答案解析
- 2025至2031年中國通宜理肺丸行業(yè)投資前景及策略咨詢研究報(bào)告
- 2025至2031年中國爵士575電腦掃描燈行業(yè)投資前景及策略咨詢研究報(bào)告
- 2025至2031年中國工程陶瓷制品行業(yè)投資前景及策略咨詢研究報(bào)告
- 智能化寵物護(hù)理服務(wù)創(chuàng)新-深度研究
- 2024年執(zhí)業(yè)藥師繼續(xù)教育專業(yè)答案
- 社會保險(xiǎn)課件教學(xué)課件
- 訂婚協(xié)議書手寫模板攻略
- 宇航用商業(yè)現(xiàn)貨(COTS)器件保證指南-編制說明
- 2024年安全員-C證考試題庫及答案(1000題)
- 《立體倉庫鋼結(jié)構(gòu)貨架技術(shù)規(guī)范(征求意見稿)》
- 2024年貴州蔬菜集團(tuán)有限公司招聘筆試參考題庫附帶答案詳解
- 2024江蘇省四校聯(lián)考高三下學(xué)期開學(xué)考化學(xué)試題及答案
- 《玩手機(jī)的危害》課件
- 《社區(qū)康復(fù)》課件-第二章 社區(qū)康復(fù)的內(nèi)容
- EAM資產(chǎn)管理的人工智能與大數(shù)據(jù)應(yīng)用
評論
0/150
提交評論