基坑開挖支護(hù)方案設(shè)計畢業(yè)論文_第1頁
基坑開挖支護(hù)方案設(shè)計畢業(yè)論文_第2頁
基坑開挖支護(hù)方案設(shè)計畢業(yè)論文_第3頁
基坑開挖支護(hù)方案設(shè)計畢業(yè)論文_第4頁
基坑開挖支護(hù)方案設(shè)計畢業(yè)論文_第5頁
已閱讀5頁,還剩66頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)

文檔簡介

畢業(yè)論文專用紙致謝本論文的完成離不開我的指導(dǎo)老師劉鵬教授以及他的悉心指導(dǎo),從論文選題、方向的確立到論文的撰寫、修改和定稿,都得到了劉老師的悉心指導(dǎo)和幫助,和劉老師接觸的幾年里,劉老師在生活學(xué)習(xí)各個方面都給了我們很大的幫助,他既是我們的良師又是我們的益友,和他在一塊不僅學(xué)到了許多專業(yè)知識,而且學(xué)到了許多課本以外的東西和許多為人處事的方法,這些都將讓我終身受益非淺。此外,一并感謝在我做論文當(dāng)中給了我許多幫助的同學(xué)和長期以來一直關(guān)心和支持我的同學(xué)。大家的支持和鼓勵將是我奮斗的動力。附錄2外文資料的中文翻譯基坑支護(hù)相關(guān)技術(shù)FoundationPitSupportingTechnology

1.invertedsiphonandcrossthewatertank:whenwaterneedacrosstheroadbed,limitedtothedesignelevationatthesametime,canuseapipeorgroove,fromthebottomofthesubgradeorupperoverheadcrossing,theformerinvertedsiphon,thelatterforcrossingthesink,equivalentofculvertandcrossthewaterbridgerespectively,bothbelongtothespecialstructureofsubgradesurfacedrainage,andmostlyneededforirrigationandwaterconservancyanduse.

2.evaporationpool:dryclimate,drainagedifficultlocation,availablealongtheborrowpitorspecificallysetthesurfacewaterevaporationpoolisruledout.3.undergrounddrainagefacilities

Perchedwaterinembankmentandslopesoil,buriedshallowdivingknownasgroundwater,groundwateraffecttheroadbedstrengthandslopestability,shouldbesetwelldrainage,sewerandinspectionfacilitiessuchasgroundwater.

Commonsubgradeundergrounddrainagefacilitiesare:blindditch,sewerandwaterseepagetunnelandpits,itscharacteristicislittledisplacement,mainlycollectedwaterseepageway,andcametotheexclusionofroadbedscope.Forlargerflowofgroundwater,shouldsetupspecialundergroundpipelineisruledout.

Buriedundertheground,duetotheundergrounddrainageequipmentisnoteasytorepair,afterthecompletionofsubgradeandhardtofindoutthefailuresituation,thereforerequirestrongeffectiveundergrounddrainageequipment.

4.drainage:relativetothegroundopenditchdrainage,drainageisalsocalledtheblindditch,hasthemeaningofconcealedwork.Duetoaditchfilledwithparticlesofdifferentsizematerials,useoffillermaterialpermeabilitywillconvergeinaditchofgroundwater,andalongtheditchdrainagetothedesignatedplace.

5.sewer:adoptingtheinfiltratorswillconvergeinaditchofgroundwater,andthroughthebottomchannelwhichterminatestotheirappointedplaces.Itsroleistoreduceorinterceptgroundwater,thehydrauliccharacteristicsisturbulent.

6.pits:thepitsofhorizontalundergrounddrainageequipment,underthelocalexistenceofmultilayeraquifer,whichaffecttheroadbedwiththinupperaquifer,displacement,andflushthesewerishardtodecorate,theverticaldrainage,setupthepits,throughtheimpermeablelayer,theroadbed,withinthescopeoftheuppergroundwaterisdeeperaquifers,inordertoreducegroundwateroralloftheupperexcluded.

7.overview

Subgradeslopesurfaceprotectionmainlysolvetheroadbedconstruction,bareroadbedstabilityofslopeandslopesurface.Easytoerosionofsoilslopesandeasilyweatheredrockcuttingslope,afterconstructionifexposedforalongtime,inthenaturalweatheringundertheactionofstressandrainerosion,gully,slipwillhappencollapsecollapseandfalling,peeling,suchasslopedeformation.Atthesametime,flakeorerosiondebrisoftenblockedsideditch,poordrainage,therefore,musttakethecorrespondingprotectivemeasuresasearlyaspossible,otherwisewillcauseseriousdiseases.designprinciples

1)easytoweatheringorvulnerabletotherainswashedoutofrockandsoilslopeandseverebrokenrockslope,shallbeprotectedinatimelymanner.

2)andsofthardrockcuttingslope,shouldbeusedaccordingtothestrataconditionsallprotectionorlocalprotection.inrainyareas,withsandsoilfillingembankment,theshoulderandsideslopesurfaceisvulnerabletowatererosionandslopeprotectionwillbeaccordingtothespecificsituation.

4)slopeprotectionstructureisgenerallynotconsideredslopeorartificialfilledsoilatthebottomofthelateralpressure,theprotectionofthestabilityoftheslopeshouldbeenough,monlyusedslopesurfaceprotectiontypes

A,plantprotection

Plantprotectionisakindofsimpleconstruction,lowcostandgoodeffectisslopeprotectionmeasures.Plantcancovertopsoil,preventtherainswashedout;Adjustsoilmoisture,preventcracks;Theconsolidationofsoil,preventtheslopesurfaceweatheringflake,atthesametimealsocanrisetoprotecttheenvironment,beautifytheroleofroadcapacity.Inordertoensuretheslopestabilityandextendthelifespanoftheplantprotection,generalappropriateincuttingslopefootset1~2mhighplasmabuildbylayingbricksorstonesflakyslopeprotection.

Second,plaster(a)applicableconditions

(1).Withoutaseriousofeasyweatheringofrockslope,butpoorlybythecoalmeasuresstrataandthediagenesisofredstickyclayrockslopeisnotapplicable.

(2).Theslopeisnotrestricted,butshouldslopesurfaceisrelativelydry.

(3).Usefixednumberofyearisshorter,thegeneralis8~10years.9.constructionpointsforattention

(1).Thefrontshouldbetheslopesurfaceofweatheringrockflushwithcleanwithcleanwatertorinsetheslope;Applicationlargeconcaveslopepulpbuildbylayingbricksorstonesflakyinlaying,widefissuregrouting.

(2).Usinglimeplasterslagpulp,afterthemortarwipeonabitdrynamelytoram,untilpulpoutsurface,thenwipeflatcoatedwithhardener.

(3).Theplasterisunfavorableinwinterseason,rainandsunshinestronglyduringconstruction,thesuitabletemperaturefor4°~30℃,andpayattentiontocovergrasswaterkeepingingoodhealth.Three,shotcreteandshotcrete(a)10.applicableconditions

(1).Easybutnotseriousweatheringofrockslope,theslopesurfaceisrelativelydry.

(2).Ofhighandsteepslope,thebrokenupperstrataandcompletethelowerstrataandneedlargeareaprotectionslope,slopeusingthistypeismoreeconomic.

(3).Thedifferenceofdiagenesisclayrockslopeisunfavorableuse.11.constructionpointsforattention

(1).Theshotcreteandshotcreteaggradationrubbleslopeshouldbeclearedbeforeandwashit.

(2).Mechanicalinjectionshouldbedonebeforeoperationtotryspraying,moderatetoadjustthewatercementratio,theinjectionofgraybodypaste,smoothsurface,theaggregatedistributionuniform,lessamountofspringback.

(3).Thesprayingoperationshouldbebottom-uphierarchical.Graybodyachieveinitialsetimmediatelyafterthewaterkeepingingoodhealth,last7~10days.Itisstrictlyprohibitedinfrozenseasonortherainsprayingoperations.Four,plasmabuildbylayingbricksorstonesflakyrevetment(a)applicableconditions

(4)Variouseasyweatheringofrockslopeandsoilslopes.If,whenusedonembankmentslopeshouldbeheavyfactaftertheconstructionofembankment.

(5)Theslopeisnotgreaterthan1to1.

Plasmabuildbylayingbricksorstones,flakyslopeprotectiongenerallyUSESsuchascrosssection,dependingontheheightofslope,thethicknessofgeneralis0.3~0.4m.Whentheslopeprotectionareaislarger,andtheslopeissteep,inordertoenhancethestabilityofslopeprotection,canusethetypeofslopeprotection.

1:倒虹吸與渡水槽:當(dāng)水流需要橫跨路基,同時受到設(shè)計標(biāo)高的限制,可以采用管道或溝槽,從路基底部或上部架空跨越,前者稱倒虹吸,后者為渡水槽,分別相當(dāng)于涵洞和渡水橋,兩者屬于路基地面排水的特殊結(jié)構(gòu)物,并且多半是配合農(nóng)田水利所需而采用。

2:蒸發(fā)池:氣候干旱、排水困難地段,可利用沿線的集中取土坑或?qū)iT設(shè)置蒸發(fā)池排除地表水。3.地下排水設(shè)備

路基及邊坡土體中的上層滯水,活埋藏很淺的潛水稱為地下水,當(dāng)?shù)叵滤绊懧坊访鎻姸然蜻吰路€(wěn)定時,應(yīng)設(shè)置暗溝、滲溝和檢查井等地下水設(shè)施。

常用的路基地下排水設(shè)備有:盲溝、滲溝、滲水隧洞和滲井等,其特點是排水量不大,主要是以滲流方式匯集水流,并就近排除路基范圍以外。對于流量較大的地下水,應(yīng)設(shè)置專用地下管道予以排除。

由于地下排水設(shè)備埋置地面以下,不易維修,在路基建成后又難以查明失效情況,因此要求地下排水設(shè)備牢固有效。

4:暗溝:相對于地面排水的明溝而言,暗溝又稱盲溝,具有隱蔽工程的含義。由于溝內(nèi)填以大小不同的顆粒材料,利用滲水材料透水性將地下水匯集于溝內(nèi),并沿溝排泄至指定地點。

5:滲溝:采用滲透方式將地下水匯集于溝內(nèi),并通過溝底通道將水排至指定地點。它的作用是降低地下水或攔截地下水,其水力特性是紊流。

6:滲井:滲井屬于水平方向的地下排水設(shè)備,當(dāng)?shù)叵麓嬖诙鄬雍畬樱渲杏绊懧坊纳喜亢畬虞^薄,排水量不大,且平式滲溝難以布置,采用立式排水,設(shè)置滲井,穿過不透水層,將路基范圍內(nèi)的上層地下水,引人更深的含水層中去,以降低上層的地下水或全部予以排除。

7:路基坡面防護(hù)

概述

路基坡面防護(hù)主要是解決路基修筑以后,裸露的路基邊坡及坡面的穩(wěn)定問題。易于沖蝕的土質(zhì)邊坡和易于風(fēng)化的巖石路塹邊坡,施工后如果長期裸露,在自然風(fēng)化應(yīng)力和雨水沖刷的作用下,將會發(fā)生沖溝、溜塌、剝落、掉塊和坍塌等坡面變形。同時,剝落或沖蝕的碎屑物往往堵塞側(cè)溝,使排水不暢,故必須及早采取相應(yīng)的防護(hù)措施,否則將造成嚴(yán)重病害。10.2設(shè)計原則

(1)凡容易風(fēng)化的或易受雨水沖刷的巖石和土質(zhì)邊坡及嚴(yán)重破碎的巖石邊坡,均應(yīng)及時加以防護(hù)。

(2)軟硬巖層相間的路塹邊坡,應(yīng)根據(jù)巖層情況采用全部防護(hù)或局部防護(hù)。3)在多雨地區(qū),用砂類土填筑的路堤,其路肩和邊坡坡面易受雨水沖刷流失,應(yīng)根據(jù)具體情況將坡面防護(hù)。

(4)坡面防護(hù)結(jié)構(gòu)一般不考慮邊坡底層或人工填土的側(cè)壓力,其所防護(hù)的邊坡應(yīng)有足夠的穩(wěn)定性,但護(hù)墻可用于極限穩(wěn)定邊坡的情況。10.3常用坡面防護(hù)類型

一、植物防護(hù)

植物防護(hù)是一種施工簡單、費用低廉、效果較好的坡面防護(hù)措施。植物能覆蓋表土,防止雨水沖刷;調(diào)節(jié)土壤濕度,防止裂縫產(chǎn)生;固結(jié)土壤,防止坡面風(fēng)化剝落,同時還能起到保護(hù)環(huán)境,美化路容的作用。為保證邊坡穩(wěn)定和延長植物防護(hù)的使用年限,一般宜在路塹坡腳設(shè)1~2m高的漿砌片石護(hù)坡。

8:抹面(一)適用條件

(1).未經(jīng)嚴(yán)重風(fēng)化的各種易風(fēng)化巖石邊坡,但對由煤系巖層及成巖作用很差的紅色黏粘土巖組成的邊坡不適用。

(2).HYPERLINK"/s?w

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論