版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
XianyangSupervisionTestingCenterofArchitecture&SanitaryCeramics.China
Address:35#,WeiyangWestRoad,Tel:0086-29-33575728
XianyangCity,ShaanxiProvince,China.Fax:0086-29-33575203
E-mail:center@
№:S*****
TESTREPORT
Testedproducts:*********
Consignment:*********
Manufacturer:*********
IssuedDate:*********
Testlaboratory:XianyangSupervisionTestingCenterofArchitecture&SanitaryCeramics.China
№:S******1of5
CLIENT’SINFORMATION:
Consignment:*********
Consignment’saddress:*********
Manufacturer:*********
Manufacturer’saddress:*********
SAMPLEDESCRIPTION:
Product:******Trademark:****
Amountofsamples:*setsModel:****
Producedate:--/--/(dd/mm/yy)
Otherdescription:
-□high-levelflushingwatertank□close-coupledflushingwatertank
-□castiron□ceramicware□vitreouschina□pressedsteel□plastic
-□concealedflushingwatertank□exposedplasticwatertank
SOURCEOFSAMPLES:
ThesamplewastransporttotheCQTCbytruck,from******.ThesamplewasreceivedingoodconditiononMay**,2011.
DATEOFTESTING:May**,2011~May**,2011
TESTREQUESTED:
SASO(SaudiStandardNo.)1257/1998SanitaryAppliances:FlushingWaterTanks
CONCLUSION:
ThesampletestedcompliedwiththeapplicablesectionofSASO(SaudiStandardNo.)1257/1998SanitaryAppliances:FlushingWaterTanks.[ThesampletestedcompliedwiththesectionrequiredbyconsignmentofSASO(SaudiStandardNo.)1257/1998SanitaryAppliances:FlushingWaterTanks,exceptforsection*.*,*.*and*.*.]
EvaluatedbyReviewedby
Testengineer.Managerofthelab.
Issueddate:May**,2011
Note:1.Thisreportmaynotbycopied,exceptcopyitentiretyandgotawrittenpermissionofCQTC.
2.Theinspectionresultsareonlyresponsibleforthetestedsample.
№:S******2of5
ApplicableClauses
SASO(SaudiStandardNo.)1257/1998SanitaryAppliances:FlushingWaterTanks
5.1Materials
5.1.1Corrosionresistance
5.1.2Shellmaterial
Castiron
Ceramicware
Pressedsteel
Plastic
5.1.3Covermaterials
5.2Design
5.2.1Access
5.2.2Support
5.2.3Backflowprevention
5.2.4Outletvalve
5.2.5Outletconnection
5.2.6Waterline
5.3Construction
5.3.1Inletvalveconnections
5.3.2Water-tightjointbetweenthewatertankandthepan
5.4Operation
5.4.1Dischargecapacity
5.4.2Rateofflushdischarge
5.4.3Leakage
5.4.4Backsiphonage
5.5Flushingapparatus
6Marking
NOTE:N/A-Notapplicable(wereusedatfollowingpapers)
№:S******3of5
TableI-1.SASO(SaudiStandardNo.)1257/1998SanitaryAppliances:FlushingWaterTanks
ApplicableClauses
Specifications
Findings
Conclusion
5.1
Materials
Seeclause5.1.1~5.1.3
——
——
5.1.1
Corrosionresistance
Watertankshells,flushingapparatusandassociatedcomponentsshallbemadefrommaterialswhichundertheconditionsofuseareoneofthefollowing:
——
——
a.Non-corroding
Complied
/DidnotComply
/N/A
Complied
/DidnotComply
/N/A
b.Protectedagainstthetypesofcorrosioncausedbytheactionofwaterwithwhichthewatertankistobeused.
Complied
/DidnotComply
Complied
/DidnotComply
c.Beforedissimilarmetalsareusedintheconstructionofawatertank,themanufacturershallensureavoidanceofthepossibilityofelectrolyticaction.
No/Haveelectrolyticaction
/DidnotComply
Complied
/DidnotComply
5.1.2
Shellmaterial
Seeclause~
——
——
Castiron
Thickness:≥5mm.Allsurfacesoftheshellshallbesuppliedcoatedinternallyandexternallytobeprotectedagainstthetypesofcorrosion.Thecoatingshalldryrapidly,shallnotbesticky,shalladherewell,shallnotchipandshallbesufficientlyresistanttotemperatureundernormalconditionsofuse,transportationandstorageoftheproducts.Theexternalcoatingshallinadditionbesuitablefortheapplicationoffinishcoatings.
*mm
Complied
/DidnotComply
Complied
/DidnotComply
Ceramicware
Fireclay,stonewareandotherceramicware:Thickness:≥12mm.
*mm
N/A
Complied
/DidnotComply
N/A
Vitreouschina:
——
——
Internalwidth:≥365mm,thickness:≥10mm
*mm
Complied
/DidnotComply
N/A
Internalwidth:<365mm,thicknessatthewaterline:≥6mm
*mm
Complied
/DidnotComply
N/A
Pressedsteel
Theshellshallbeofseamlessorweldedconstruction.Allsurfacesoftheshellshallbecoatedwithvitreousenamel.Thesteelshallbeofthicknessnotlessthan1.6mmbeforeenamelling.
Complied
/DidnotComply
/N/A
Complied
/DidnotComply
/N/A
№:S******4of5
TableI-2.SASO(SaudiStandardNo.)1257/1998SanitaryAppliances:FlushingWaterTanks
ApplicableClauses
Specifications
Findings
Conclusion
Plastic
Plasticmaterialsshallbesuchthatwhenassembled,shallcomplywith:
——
——
Appearance
Tanksshallbefreefromblistersanddelaminations.
Complied
/DidnotComply
Complied
/DidnotComply
Exposedtanksshallbereasonablyfreefromflowlines,streakingorunintendedcolourvariationsonsurfacesvisibleafterinstallation.
Complied
/DidnotComply
Complied
/DidnotComply
Distortionresistance
WhentestedinaccordancewiththeSASO1479/1999,thetanksshallnotdistortoutwardsmorethan6mmandthecovershallnotbedislodged.
*mm
andthecoverdidnotbedislodged
Complied
/DidnotComply
Exposedwatertank
WhentestedinaccordancewiththeSASO1479/1999,shallsatisfythefollowing:
Colourfastnesstolight:≥5class
*class
Complied
/DidnotComply
Opacity:≥10%
*%
5.1.3
Covermaterials
Shallbemadeofthesamematerialasthebody.
Complied
/DidnotComply
Complied
/DidnotComply
5.2
Design
Seeclause5.2.1~5.2.6
——
——
5.2.1
Access
Thewatertankshallbedesignedtoallowsufficientaccessforadjustmentandmaintenanceofinternalcomponents.
Complied
/DidnotComply
Complied
/DidnotComply
Removablecoversshallbesecuredagainstsliding.
Complied
/DidnotComply
Complied
/DidnotComply
5.2.2
Support
Watertanksshallbedesignedwithameansofsupportwhichshallbeindependentofwatersupplyorflushpipe.Allfastenersusedtosupportthewatertankshallbeofcorrosionresistantmaterial.
Complied
/DidnotComply
Complied
/DidnotComply
5.2.3
Backflowprevention
Theinletvalvetogetherwithanyfittedsilencingdeviceorotherdevicewhichinterceptsthefreeflowofwaterfromthevalveshallbecapableofpreventingbacksiphonageofwater.Eitheranairgap,amechanicalbackflowpreventeroravacuumbreakermaysatisfythispurpose.Theairgapshallnotbelessthan25mm.
Have/No
*mm
Complied
/DidnotComply
5.2.4
Outletvalve
Whenactivatedshallremainintheopenpositionuntiltheflushiscompletedandthenshallcloseautomatically.Itscontrolmechanismshallinitiatetheflushingactionandthenautomaticallyreturntotheactivatingposition.Theoutletvalveshallbereplaceable.
Complied
/DidnotComply
Complied
/DidnotComply
5.2.5
Outletconnection
Thewatertankoutletshallbecapableofmakingawater-tightconnectionwiththeflushpipeormatchingpan.
No/Water-tightconnection
Complied
/DidnotComply
№:S******5of5
TableI-3.SASO(SaudiStandardNo.)1257/1998SanitaryAppliances:FlushingWaterTanks
ApplicableClauses
Specifications
Findings
Conclusion
5.2.6
Waterline
Shallbemarkedpermanentlyinsidethewatertankinsuchapositionthatitiseasilyvisibletothepersonadjusting.
Complied
/DidnotComply
Complied
/DidnotComply
5.3
Construction
Seeclause5.3.1~5.3.2
——
——
5.3.1
Inletvalveconnections
Shallbeprovidedforensuringandmaintainingawater-tightjiont.
No/leakage
Complied
/DidnotComply
5.3.2
Water-tightjointbetweenthewatertankandthepan
Shallbeprovidedforensuringawater-tightjiontbetweenthewatertankandthepaninaclose-coupledapplication.
No/leakage
Complied
/DidnotComply
5.4
Operation
Seeclause5.4.1~5.4.4
——
——
5.4.1
Dischargecapacity
WhentestedasdescribedintheSASO1479/1999,theaveragedischargecapacity:≤6.0L
*L
Complied
/DidnotComply
5.4.2
Rateofflushdischarge
Close-coupledwatertanks:≤1.6L/s
*L/s
Complied
/DidnotComply
High-levelwatertanks:≤2.0L/s
*L/s
Complied
/DidnotComply
5.4.3
Leakage
Anassembledwatertankshallshownosignofleakage.
No/Haveleakage
Complied
/DidnotComply
5.4.4
Backsiphonage
WhentestedinaccordancewiththeSASO1479/1999,shallshownobacksi
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 中國氰化三甲基硅烷產(chǎn)業(yè)經(jīng)營現(xiàn)狀與供需前景預(yù)測(cè)研究報(bào)告(2024-2030版)
- 中國氣驅(qū)增壓機(jī)行業(yè)運(yùn)行趨勢(shì)及投資動(dòng)態(tài)預(yù)測(cè)研究報(bào)告(2024-2030版)
- 中國條碼打印機(jī)行業(yè)競(jìng)爭(zhēng)格局與投資盈利預(yù)測(cè)研究報(bào)告(2024-2030版)
- 中國放射影像設(shè)備產(chǎn)業(yè)應(yīng)用態(tài)勢(shì)及投資前景分析研究報(bào)告(2024-2030版)
- 中國手機(jī)緊湊型相機(jī)模組行業(yè)未來趨勢(shì)與盈利前景預(yù)測(cè)研究報(bào)告(2024-2030版)
- 中國異形瓶行業(yè)市場(chǎng)運(yùn)營模式及未來發(fā)展動(dòng)向預(yù)測(cè)研究報(bào)告(2024-2030版)
- 中國天然增味劑行業(yè)市場(chǎng)發(fā)展分析及發(fā)展趨勢(shì)與投資戰(zhàn)略研究報(bào)告(2024-2030版)
- 中國發(fā)泡多聚敷料產(chǎn)業(yè)應(yīng)用狀況及未來前景分析研究報(bào)告(2024-2030版)
- 中國便攜式電動(dòng)汽車充電器行業(yè)市場(chǎng)現(xiàn)狀分析及競(jìng)爭(zhēng)格局與投資發(fā)展研究報(bào)告(2024-2030版)
- 中國三氟化氮行業(yè)產(chǎn)銷需求及未來前景規(guī)劃研究報(bào)告(2024-2030版)
- 讀后續(xù)寫人與動(dòng)物-天使狗狗的守護(hù)講義 高三英語作文復(fù)習(xí)寫作專項(xiàng)
- 國家開放大學(xué)《科學(xué)與技術(shù)》形考任務(wù)1-4參考答案
- 廠房泄爆面積計(jì)算
- 2023年全國中小學(xué)思政課教師網(wǎng)絡(luò)培訓(xùn)研修總結(jié)心得體會(huì)
- 《走進(jìn)芭蕾-中外芭蕾經(jīng)典作品鑒賞》學(xué)習(xí)通超星課后章節(jié)答案期末考試題庫2023年
- 口腔修復(fù)學(xué):全口義齒課件
- 宮頸及陰道上藥的護(hù)理(婦產(chǎn)科護(hù)理課件)
- 人教精通版英語五上Unit5《Isthisyourschoolbag》教案
- 2023年口腔醫(yī)學(xué)期末復(fù)習(xí)-牙周病學(xué)(口腔醫(yī)學(xué))考試歷年真題精華集選附答案
- 能源管理知識(shí)培訓(xùn)講義
- 老舊小區(qū)現(xiàn)狀調(diào)查調(diào)查表
評(píng)論
0/150
提交評(píng)論