2.Feed/DrawSummary
3.CS-1
3.1.TrayGeometry
3.2.ResultsSummary
3.3.HydraulicPlots
4.CS-2
4.1.TrayGeometry
4.2.ResultsSummary
4.3.HydraulicPlots
5.CS-3
5.1.TrayGeometry
5.2.ResultsSummary
5.3.HydraulicPlots
6.CS-4
6.1.TrayGeometry
6.2.ResultsSummary
6.3.HydraulicPlots
7.CS-5
7.1.TrayGeometry
7.2.ResultsSummary
7.3.HydraulicPlots
8.CS-6
8.1.TrayGeometry
8.2.ResultsSummary
8.3.HydraulicPlots
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
1.ColumnInternalsSummary
Summary
Sections
Page3of60
2019/7/14
Column1
StartStage
EndStage
Diameter(meter)
SectionHeight(meter)
InternalsType
TrayorPackingType
SectionPressureDrop(bar)
%ApproachtoFlood
LimitingStage
CS-1
2
5
9
3.2
Trayed
SIEVE
0.0425055
75.2
2
CS-2
6
9
10
3.4
Trayed
SIEVE
0.0719069
78.3651
6
CS-3
10
18
10
8.1
Trayed
SIEVE
0.157215
77.5612
10
CS-4
24
39
8
12.8
Trayed
SIEVE
0.242357
77.0859
39
CS-5
19
21
10
3
Trayed
SIEVE
0.0481658
82.6014
19
CS-6
22
23
8
1.5
Trayed
SIEVE
0.0193841
72.1763
22
Property
Value
Unit
NumberofTrayed/Packedstages
38
Totalheight
32
meter
Totalheadloss
6.56893
meter
Totalpressuredrop
0.581534
bar
Numberofsections
6
Numberofdiameters
3
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
2.Feed/DrawSummary
Feed/DrawSummary
Page4of60
2019/7/14
Stage
Stream
Feed/Draw
1
MEOAC
Draw
6
CH3COOH
Feed
10
H2SO4
Feed
24
CH4O
Feed
40
PROD1
Draw
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
CS-1
TrayGeometry
Section
Downcomergeometry
Weirgeometry
Panels
Page5of60
2019/7/14
Property
Side
Unit
Weirheight
0.075
meter
Weirlength
5.607
meter
Property
Side
Unit
Downcomerclearance
0.0623
meter
Downcomerwidthtop
0.98
meter
Downcomerwidthbottom
0.98
meter
Downcomerareatop
3.75126
sqm
Downcomerareabottom
3.75126
sqm
Property
Value
Unit
Traytype
SIEVE
Diameter
9
meter
Trayspacing
0.8
meter
Numberofpasses
1
Holediameter
0.0127
meter
Holearea/Activearea
0.1
Deckgaugethickness
10GAUGE
Deckgaugethicknessvalue
3.4036
mm
Cross-sectionalarea
63.6173
sqm
Activearea
56.1147
sqm
Netarea
59.866
sqm
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page6of60
2019/7/14
Property
A
Unit
Flowpathlength
7.04
meter
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
3.2.ResultsSummary
Summary
Limitingconditions
Page7of60
2019/7/14
Property
Value
Unit
Tray
Location
Maximum%jetflood
75.2
2
Maximum%downcomerbackup(aerated)
41.5517
2
Maximumdowncomerloading
177.453
cum/hr/sqm
2
Side
Maximumweirloading
118.722
cum/hr-meter
2
Side
Maximumaeratedheightoverweir
0.22592
meter
2
Maximum%approachtosystemlimit
44.1093
2
MaximumCsbasedonbubblingarea
0.0810644
m/sec
2
Property
Value
Unit
Sectionstartingstage
2
Sectionendingstage
5
Traytype
SIEVE
Numberofpasses
1
Trayspacing
0.8
meter
SectionDiameter
9
meter
Sectionheight
3.2
meter
Sectionpressuredrop
0.0425055
bar
Sectionheadloss
0.48366
meter
Trayswithweeping
None
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
3.3.HydraulicPlots
Page8of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page9of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page10of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page11of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
CS-2
TrayGeometry
Section
Downcomergeometry
Weirgeometry
Panels
Page12of60
2019/7/14
Property
Side
Center
Unit
Weirheight
0.08
0.08
meter
Weirlength
5.72364
9.97547
meter
Property
Side
Center
Unit
Downcomerclearance
0.095
0.095
meter
Downcomerwidthtop
0.9
0.7
meter
Downcomerwidthbottom
0.9
0.7
meter
Downcomerareatop
3.50118
6.99428
sqm
Downcomerareabottom
3.50118
6.99428
sqm
Property
Value
Unit
Traytype
SIEVE
Diameter
10
meter
Trayspacing
0.85
meter
Numberofpasses
2
Holediameter
0.0085
meter
Holearea/Activearea
0.07
Deckgaugethickness
10GAUGE
Deckgaugethicknessvalue
3.4036
mm
Cross-sectionalarea
78.5398
sqm
Activearea
64.5432
sqm
Netarea
71.5415
sqm
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page13of60
2019/7/14
Property
A
B
Unit
Flowpathlength
3.75
3.75
meter
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
4.2.ResultsSummary
Summary
Limitingconditions
Page14of60
2019/7/14
Property
Value
Unit
Tray
Location
Maximum%jetflood
78.3651
6
Maximum%downcomerbackup(aerated)
45.7238
6
Maximumdowncomerloading
223.245
cum/hr/sqm
6
Center
Maximumweirloading
136.403
cum/hr-meter
6
Side
Maximumaeratedheightoverweir
0.191686
meter
6
Maximum%approachtosystemlimit
44.3523
6
MaximumCsbasedonbubblingarea
0.0848665
m/sec
6
Property
Value
Unit
Sectionstartingstage
6
Sectionendingstage
9
Traytype
SIEVE
Numberofpasses
2
Trayspacing
0.85
meter
SectionDiameter
10
meter
Sectionheight
3.4
meter
Sectionpressuredrop
0.0719069
bar
Sectionheadloss
0.783047
meter
Trayswithweeping
None
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
4.3.HydraulicPlots
Page15of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page16of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page17of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page18of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
CS-3
TrayGeometry
Section
Downcomergeometry
Weirgeometry
Panels
Page19of60
2019/7/14
Property
Side
Center
Unit
Weirheight
0.03
0.03
meter
Weirlength
5.80865
9.97476
meter
Property
Side
Center
Unit
Downcomerclearance
0.1
0.1
meter
Downcomerwidthtop
0.93
0.71
meter
Downcomerwidthbottom
0.93
0.71
meter
Downcomerareatop
3.67417
7.09403
sqm
Downcomerareabottom
3.67417
7.09403
sqm
Property
Value
Unit
Traytype
SIEVE
Diameter
10
meter
Trayspacing
0.9
meter
Numberofpasses
2
Holediameter
0.0085
meter
Holearea/Activearea
0.065
Deckgaugethickness
10GAUGE
Deckgaugethicknessvalue
3.4036
mm
Cross-sectionalarea
78.5398
sqm
Activearea
64.0974
sqm
Netarea
71.3186
sqm
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page20of60
2019/7/14
Property
A
B
Unit
Flowpathlength
3.715
3.715
meter
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
5.2.ResultsSummary
Summary
Limitingconditions
Page21of60
2019/7/14
Property
Value
Unit
Tray
Location
Maximum%jetflood
77.5612
10
Maximum%downcomerbackup(aerated)
45.2965
10
Maximumdowncomerloading
221.299
cum/hr/sqm
10
Center
Maximumweirloading
135.135
cum/hr-meter
10
Side
Maximumaeratedheightoverweir
0.192001
meter
10
Maximum%approachtosystemlimit
44.2338
10
MaximumCsbasedonbubblingarea
0.0850892
m/sec
10
Property
Value
Unit
Sectionstartingstage
10
Sectionendingstage
18
Traytype
SIEVE
Numberofpasses
2
Trayspacing
0.9
meter
SectionDiameter
10
meter
Sectionheight
8.1
meter
Sectionpressuredrop
0.157215
bar
Sectionheadloss
1.7016
meter
Trayswithweeping
None
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
5.3.HydraulicPlots
Page22of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page23of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page24of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page25of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page26of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page27of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page28of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page29of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page30of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
CS-4
TrayGeometry
Section
Downcomergeometry
Weirgeometry
Panels
Page31of60
2019/7/14
Property
Side
Center
Unit
Weirheight
0.1
0.1
meter
Weirlength
5.03106
7.96477
meter
Property
Side
Center
Unit
Downcomerclearance
0.1
0.1
meter
Downcomerwidthtop
0.89
0.75
meter
Downcomerwidthbottom
0.89
0.75
meter
Downcomerareatop
3.05855
5.9912
sqm
Downcomerareabottom
3.05855
5.9912
sqm
Property
Value
Unit
Traytype
SIEVE
Diameter
8
meter
Trayspacing
0.8
meter
Numberofpasses
2
Holediameter
0.0085
meter
Holearea/Activearea
0.07
Deckgaugethickness
10GAUGE
Deckgaugethicknessvalue
3.4
mm
Cross-sectionalarea
50.2655
sqm
Activearea
38.1572
sqm
Netarea
44.2113
sqm
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page32of60
2019/7/14
Property
A
B
Unit
Flowpathlength
2.735
2.735
meter
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
6.2.ResultsSummary
Summary
Limitingconditions
Page33of60
2019/7/14
Property
Value
Unit
Tray
Location
Maximum%jetflood
77.0859
39
Maximum%downcomerbackup(aerated)
47.4988
39
Maximumdowncomerloading
218.658
cum/hr/sqm
39
Center
Maximumweirloading
130.194
cum/hr-meter
39
Side
Maximumaeratedheightoverweir
0.188058
meter
39
Maximum%approachtosystemlimit
37.7736
39
MaximumCsbasedonbubblingarea
0.0803356
m/sec
39
Property
Value
Unit
Sectionstartingstage
24
Sectionendingstage
39
Traytype
SIEVE
Numberofpasses
2
Trayspacing
0.8
meter
SectionDiameter
8
meter
Sectionheight
12.8
meter
Sectionpressuredrop
0.242357
bar
Sectionheadloss
2.85329
meter
Trayswithweeping
None
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
6.3.HydraulicPlots
Page34of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page35of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page36of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page37of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page38of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page39of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page40of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page41of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page42of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page43of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page44of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page45of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page46of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page47of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page48of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page49of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
CS-5
TrayGeometry
Section
Downcomergeometry
Weirgeometry
Panels
Page50of60
2019/7/14
Property
Side
Center
Unit
Weirheight
0.06
0.06
meter
Weirlength
8
9.85444
meter
Property
Side
Center
Unit
Downcomerclearance
0.045
0.045
meter
Downcomerwidthtop
2
1.7
meter
Downcomerwidthbottom
2
1.7
meter
Downcomerareatop
11.1824
16.9178
sqm
Downcomerareabottom
11.1824
16.9178
sqm
Property
Value
Unit
Traytype
SIEVE
Diameter
10
meter
Trayspacing
1
meter
Numberofpasses
2
Holediameter
0.015
meter
Holearea/Activearea
0.08
Deckgaugethickness
10GAUGE
Deckgaugethicknessvalue
3.4036
mm
Cross-sectionalarea
78.5398
sqm
Activearea
39.2573
sqm
Netarea
58.8986
sqm
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page51of60
2019/7/14
Property
A
B
Unit
Flowpathlength
2.15
2.15
meter
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
7.2.ResultsSummary
Summary
Limitingconditions
Page52of60
2019/7/14
Property
Value
Unit
Tray
Location
Maximum%jetflood
82.6014
19
Maximum%downcomerbackup(aerated)
42.4333
19
Maximumdowncomerloading
71.1632
cum/hr/sqm
19
Center
Maximumweirloading
75.2451
cum/hr-meter
19
Side
Maximumaeratedheightoverweir
0.154915
meter
19
Maximum%approachtosystemlimit
38.3096
19
MaximumCsbasedonbubblingarea
0.105446
m/sec
19
Property
Value
Unit
Sectionstartingstage
19
Sectionendingstage
21
Traytype
SIEVE
Numberofpasses
2
Trayspacing
1
meter
SectionDiameter
10
meter
Sectionheight
3
meter
Sectionpressuredrop
0.0481658
bar
Sectionheadloss
0.529263
meter
Trayswithweeping
None
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
7.3.HydraulicPlots
Page53of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page54of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page55of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
CS-6
TrayGeometry
Section
Downcomergeometry
Weirgeometry
Panels
Page56of60
2019/7/14
Property
Side
Center
Unit
Weirheight
0.08
0.08
meter
Weirlength
5.2915
7.94921
meter
Property
Side
Center
Unit
Downcomerclearance
0.08
0.08
meter
Downcomerwidthtop
1
0
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年西瓜買賣詳細(xì)協(xié)議模板
- 2024年預(yù)付款墊資協(xié)議格式草案
- 地質(zhì)勘查工作協(xié)議2024
- 二手房交易北京協(xié)議樣式2024年
- 2024年精裝地暖施工協(xié)議范本
- 2024年國(guó)內(nèi)集裝箱運(yùn)輸協(xié)議樣本
- 2024商業(yè)地產(chǎn)續(xù)租協(xié)議范本
- 2024年度農(nóng)產(chǎn)品專項(xiàng)采購(gòu)協(xié)議樣本
- 2024年學(xué)校周邊商業(yè)租賃協(xié)議樣本
- 2024年借款居間服務(wù)協(xié)議模板2
- 超聲病例討論.ppt
- 高中語文表現(xiàn)手法之烘托、渲染、襯托、對(duì)比的明顯區(qū)別
- 箱式變電站交接試驗(yàn)報(bào)告
- 泰達(dá)時(shí)代中心樓頂發(fā)光字施工方案
- LED燈具規(guī)格書中英文
- 畫直線和曲線說課稿
- 論我國(guó)農(nóng)村集體土地所有制度的完善-
- 不等式基本性質(zhì)
- BSP螺紋執(zhí)行什么標(biāo)準(zhǔn)與英制G螺紋有何區(qū)別RpRc
- 初中體育課——立定跳遠(yuǎn)教案
- 人民大學(xué)大眾汽車案例-4組
評(píng)論
0/150
提交評(píng)論