文檔簡(jiǎn)介
目錄
第一章編制依據(jù)、編制范圍及設(shè)計(jì)概況................................1
1.1編制依據(jù)....................................................1
1.2編制范圍....................................................2
1.3設(shè)計(jì)概況....................................................2
1.3.1線路平縱斷面設(shè)計(jì)........................................2
1.3.2軌道設(shè)計(jì)................................................2
1.3.3隧道洞口設(shè)計(jì)............................................2
1.3.4隧道洞身設(shè)計(jì)............................................2
第二章工程概況....................................................3
2.1線路概況...................................................3
2.2主要技術(shù)標(biāo)準(zhǔn)................................................3
2.3主要工程數(shù)量.................................................4
2.4征地拆遷.....................................................4
2.5工程特點(diǎn)、重點(diǎn)及難點(diǎn)........................................5
2.5.1工程特點(diǎn)................................................5
2.5.2施工管理特點(diǎn)............................................5
2.5.3工程重、難點(diǎn)及應(yīng)對(duì)措施..................................8
第三章建設(shè)項(xiàng)目所在地區(qū)特征.......................................10
3.1自然特征....................................................10
3.1.1地形地貌...............................................10
3.1.2地層巖性...............................................10
3.1.3地質(zhì)構(gòu)造...............................................11
3.1.4地震動(dòng)參數(shù).............................................12
3.1.5水文地質(zhì)...............................................12
3.1.6不良地質(zhì)...............................................14
3.1.7氣象特征...............................................15
3.2交通運(yùn)輸....................................................15
3.3水源電源等利用...............................................15
3.3.1施工用水................................................15
3.3.2施工用電................................................16
3.3.3通訊....................................................16
3.4建筑材料供應(yīng).................................................16
3.5民風(fēng)民俗及衛(wèi)生防疫..........................................16
3.5.1民風(fēng)民俗..............................................16
3.5.2衛(wèi)生防疫..............................................16
第四章施工組織安排...............................................17
4.1總體施工目標(biāo)................................................17
4.1.1工期目標(biāo)..............................................17
4.1.2質(zhì)量目標(biāo)..............................................17
4.1.3安全目標(biāo)................................................17
4.1.4環(huán)境保護(hù)、水土保持及節(jié)能目標(biāo)............................17
4.1.5職業(yè)健康安全目標(biāo)........................................17
4.1.6技術(shù)創(chuàng)新目標(biāo)............................................18
4.2施工組織機(jī)構(gòu)及施工區(qū)段劃分..................................18
4.2.1組織機(jī)構(gòu)................................................18
4.2.2管理職責(zé)................................................18
4.2.2.1項(xiàng)目經(jīng)理............................................18
4.2.2.2項(xiàng)目副經(jīng)理..........................................19
4.2.2.3項(xiàng)目總工程師........................................20
4.2.2.4項(xiàng)目安全總監(jiān)........................................20
4.2.2.5工程技術(shù)部..........................................20
4.2.2.6辦公室..............................................21
4.2.2.7財(cái)務(wù)部..............................................21
4.2.2.8安全質(zhì)量部..........................................21
4.2.2.9計(jì)合部..............................................21
4.2.2.10設(shè)備物資部.........................................22
4.2.2.11試驗(yàn)室.............................................22
4.2.3施工區(qū)段劃分............................................22
4.3總體施工安排和主要階段工期..................................23
4.3.1總體施工安排............................................23
4.3.2主要節(jié)點(diǎn)工期............................................23
4.4施工準(zhǔn)備及建設(shè)協(xié)調(diào)方案......................................24
4.4.1施工準(zhǔn)備...............................................24
4.4.1.1技術(shù)準(zhǔn)備...........................................24
4.4.1.2施工隊(duì)伍準(zhǔn)備.......................................24
4.4.1.3設(shè)備、物資準(zhǔn)備.....................................25
4.4.1.4施工現(xiàn)場(chǎng)準(zhǔn)備.......................................26
4.4.2建設(shè)協(xié)調(diào)方案............................................26
4.4.2.1征地拆遷............................................26
4.4.2.2場(chǎng)地清理............................................26
4.4.2.3測(cè)量放線............................................27
4.4.2.4現(xiàn)場(chǎng)核對(duì)............................................27
4.4.2.5開工報(bào)告............................................27
4.4.2.6工程實(shí)施............................................27
4.4.2.7報(bào)檢簽證............................................27
4.4.2.8試驗(yàn)檢測(cè)............................................28
4.4.2.9質(zhì)量評(píng)定............................................28
4.4.2.10工程驗(yàn)收...........................................28
4.4.2.11土地復(fù)耕...........................................28
4.4.2.12工程保修...........................................29
4.5施工進(jìn)度計(jì)劃................................................29
4.5.1主要項(xiàng)目施工進(jìn)度指標(biāo)....................................29
4.5.2施工平面布置圖及形象進(jìn)度圖..............................30
4.5.2.1平面布置原則..........................................30
第五章臨時(shí)工程....................................................31
5.1施工便道.....................................................31
5.2臨時(shí)通訊.....................................................31
5.3臨時(shí)房屋.....................................................31
5.4混凝土拌和站.................................................32
5.5棄磴場(chǎng).......................................................32
5.6垃圾及污水處理...............................................32
第六章重、難點(diǎn)工程的施工方案、方法及其措施........................33
6.1采空區(qū)施工...................................................33
6.1.1施工方案................................................33
6.1.2施工方法及措施..........................................33
6.1.2.1超前地質(zhì)預(yù)報(bào)........................................33
6.1.2.2預(yù)加固施工..........................................34
6.1.2.3注漿效果檢查........................................34
6.2斷層破碎帶...................................................34
6.2.1施工方案................................................34
6.2.2施工方法及措施..........................................35
6.3弱巖爆地段施工.............................................35
6.4隧道施工安全注意事項(xiàng)........................................36
第七章施工方案....................................................37
7.1總體施工方案................................................37
7.1.1施工任務(wù)劃分............................................37
7.1.2施工方案................................................37
7.1.2.1輔助坑道施工方案....................................38
7.1.2.2隧道洞口施工方案....................................38
7.1.2.3正洞洞身施工方案....................................38
7.1.2.4施工排水方案........................................39
7.1.2.5施工通風(fēng)方案........................................39
7.1.2.6不良地質(zhì)地段及特殊地段施工方案......................39
7.1.2.7棟梁坡隧道機(jī)械化配套方案............................41
7.2隧道輔助坑道施工方法.........................................44
7.3隧道正洞施工方法............................................45
7.3.1洞口工程施工方法.......................................45
7.3.1.1洞口土石方開挖......................................45
7.3.1.2洞口邊仰坡防護(hù)......................................45
7.3.1.3洞口導(dǎo)向墻及大管棚施工..............................46
7.3.1.4進(jìn)洞施工方法及措施..................................48
7.3.1.5洞門施工............................................48
7.3.1.6明洞施工............................................48
7.3.2洞身施工................................................49
7.3.2.1洞身開挖方法........................................49
7.3.2.2隧道鉆爆開挖........................................60
7.3.2.3綜合洞室施工........................................64
7.3.3洞身支護(hù)................................................65
7.3.3.1超前小導(dǎo)管或超前錨管支護(hù)施工........................66
7.3.3.2噴射混凝土..........................................66
7.3.3.3砂漿錨桿............................................68
7.3.3.4中空組合注漿錨桿....................................68
7.3.3.5鋼筋網(wǎng)鋪設(shè)..........................................69
7.3.3.6鋼拱架施工..........................................70
7.3.4出硝與運(yùn)輸..............................................71
7.3.5結(jié)構(gòu)防排水施工..........................................71
7.3.5.1盲管施工............................................71
7.3.5.2防水層施工..........................................72
7.3.5.3止水帶施工..........................................75
7.3.5.4抗?jié)B混凝土..........................................76
7.3.5.5襯砌背后回填壓漿....................................76
7.3.5.6二次襯砌及附屬施工..................................76
7.3.6仰拱和填充施工..........................................77
7.3.7綜合接地施工及接觸網(wǎng)槽道................................78
7.3.7.1隧道二襯中的接地鋼筋設(shè)置...........................78
7.3.7.2隧道接地極設(shè)置.....................................79
7.3.7.3接地鋼筋間的連接...................................79
7.3.7.4接地端子設(shè)置.......................................80
7.3.7.5工藝要求...........................................80
7.3.7.6隧道接觸網(wǎng)槽道.....................................81
7.3.8拱墻襯砌施工............................................83
7.3.9附屬洞室施工............................................84
7.3.10預(yù)埋件施工.............................................84
7.3.11溝槽施工...............................................84
7.3.12施工通風(fēng)...............................................84
7.3.12.1通風(fēng)方式..........................................84
7.3.12.2風(fēng)量和風(fēng)阻力計(jì)算..................................85
7.3.12.3通風(fēng)設(shè)備選擇及配置................................87
7.3.12.4隧道進(jìn)出口通風(fēng)....................................88
7.3.12.51#、2#斜井通風(fēng)....................................88
7.3.12.6平導(dǎo)及出口通風(fēng)....................................89
7.3.12.7施工通風(fēng)管理......................................89
7.3.13施工排水...............................................90
7.3.13.1順坡排水..........................................90
7.3.13.2反坡排水..........................................90
7.3.13.3污水處理池........................................90
7.3.14供風(fēng)、供水.............................................91
7.3.15管線布置...............................................91
7.3.15.1供電及照明........................................92
7.3.16棄砧與防護(hù).............................................92
7.4隧道不良地質(zhì)段及特殊地段施工................................93
7.4.1采空區(qū)段施工...........................................93
7.4.2斷層破碎帶施工..........................................94
7.4.3軟弱圍巖地段施工........................................95
7.4.4幾種注漿方案的特點(diǎn)及適用范圍............................96
7.4.5注漿方案的選擇原則與設(shè)計(jì)流程............................96
7.4.5.1超前帷幕注漿方案....................................98
7.4.5.2徑向注漿...........................................101
7.4.5.3局部注漿.........................................103
7.4.5.4頂水注漿...........................................104
7.4.5.5超前小導(dǎo)管注漿....................................105
7.4.5.6大管棚注漿.........................................105
7.4.6.7鉆孔與注漿設(shè)備配套.................................105
7.5隧道超前地質(zhì)預(yù)報(bào)............................................106
7.5.1不良地質(zhì)及預(yù)報(bào)方法.....................................106
7.5.2超前地質(zhì)預(yù)報(bào)技術(shù)工作流程及主要方法...................107
7.5.3地質(zhì)預(yù)報(bào)工作原理及內(nèi)容...............................109
7.5.3.1地質(zhì)素描...........................................109
7.5.3.2超前水平鉆探.......................................109
7.5.3.3TSP-203...............................................112
7.5.3.4紅外線探水.........................................114
7.5.3.5地質(zhì)雷達(dá)...........................................115
7.6隧道監(jiān)控量測(cè)................................................117
7.6.1隧道監(jiān)控量測(cè)的目的.....................................117
7.6.2監(jiān)控量測(cè)項(xiàng)目的設(shè)置.....................................118
7.6.3監(jiān)測(cè)工作的重點(diǎn).........................................121
7.6.4監(jiān)測(cè)數(shù)據(jù)的處理及反饋...................................121
7.6.5監(jiān)控量測(cè)頻率及測(cè)點(diǎn)增減調(diào)整.............................123
7.6.6監(jiān)測(cè)質(zhì)量保證措施.......................................124
7.7擬采用的新技術(shù)..............................................125
7.8隧道風(fēng)險(xiǎn)管理................................................126
7.8.1風(fēng)險(xiǎn)識(shí)別..............................................126
7.8.1.1自然災(zāi)害風(fēng)險(xiǎn)......................................126
7.8.1.2隧道不良地質(zhì)施工風(fēng)險(xiǎn)..............................126
7.8.1.3其它突發(fā)風(fēng)險(xiǎn)......................................126
7.8.2風(fēng)險(xiǎn)評(píng)估...............................................126
7.8.3風(fēng)險(xiǎn)處置...............................................126
7.8.4風(fēng)險(xiǎn)監(jiān)控...............................................126
7.8.5突發(fā)事件應(yīng)對(duì)...........................................127
7.8.5.1組織機(jī)構(gòu)...........................................127
7.8.5.2組織機(jī)構(gòu)人員職責(zé)...................................127
7.8.5.3風(fēng)險(xiǎn)預(yù)案...........................................128
7.8.5.4物資儲(chǔ)備...........................................128
7.8.5.5人員保證...........................................129
7.8.5.6報(bào)告、處理程序.....................................129
第八章資源配置方案...............................................131
8.1主要材料供應(yīng)計(jì)劃............................................131
8.1.1主要材料供應(yīng)辦法......................................131
8.1.2主要材料運(yùn)到現(xiàn)場(chǎng)的方法................................131
8.1.3材料供應(yīng)保障措施.......................................131
8.1.4主要材料供應(yīng)計(jì)劃.......................................132
8.2主要設(shè)備供應(yīng)方案............................................132
8.2.1配備原則...............................................132
8.2.2配備配套選型...........................................133
8.2.3主要施工機(jī)械設(shè)備及試驗(yàn)檢驗(yàn)設(shè)備調(diào)配計(jì)劃.................134
8.2.4主要施工機(jī)械設(shè)備及試驗(yàn)檢驗(yàn)設(shè)備配備數(shù)量表...............134
8.3關(guān)鍵設(shè)備數(shù)量及進(jìn)場(chǎng)計(jì)劃......................................137
8.4勞動(dòng)力組織計(jì)劃..............................................137
8.4.1勞動(dòng)組織原則及勞動(dòng)力配置計(jì)劃...........................137
8.4.2勞動(dòng)組織原則...........................................137
8.4.3勞動(dòng)力管理和培訓(xùn).......................................137
8.4.3.1勞動(dòng)力管理.........................................137
8.4.3.2勞動(dòng)力技能培訓(xùn)方案.................................138
8.4.4特殊季節(jié)勞動(dòng)力保障措施................................138
8.4.5勞動(dòng)力組織計(jì)劃........................................139
8.5投資計(jì)劃...................................................139
第九章管理措施..................................................140
9.1標(biāo)準(zhǔn)化管理.................................................140
9.1.1標(biāo)準(zhǔn)化管理體系.........................................140
9.1.2標(biāo)準(zhǔn)化管理要求.........................................140
9.1.3標(biāo)準(zhǔn)化管理保證措施.....................................141
9.2質(zhì)量管理措施................................................141
9.2.1質(zhì)量管理體系...........................................141
9.2.2組織保證措施...........................................141
9.2.3思想保證措施...........................................143
9.2.4制度保證措施...........................................143
9.2.5經(jīng)濟(jì)保證措施...........................................146
9.2.6技術(shù)保證措施...........................................146
9.2.6.1開挖質(zhì)量保證措施...................................146
9.2.6.2支護(hù)質(zhì)量保證措施...................................149
9.2.6.3防排水施工質(zhì)量保證措施.............................150
9.2.6.4襯砌施工質(zhì)量保證措施...............................150
9.2.6.5確保溝槽施工質(zhì)量措施...............................151
9.2.6.6漿砌工程施工質(zhì)量措施...............................151
9.3安全管理措施................................................151
9.3.1安全保證體系...........................................151
9.3.2安全管理職責(zé)...........................................152
9.3.3安全管理制度...........................................156
9.3.4保證安全生產(chǎn)組織措施...................................157
9.3.5保證安全生產(chǎn)管理措施...................................157
9.3.5.1建立健全各項(xiàng)安全制度...............................158
9.3.5.2安全生產(chǎn)教育與培訓(xùn).................................158
9.3.5.3安全生產(chǎn)檢查.......................................158
9.3.5.4安全技術(shù)方案的編制與審批...........................160
9.3.5.5施工安全措施費(fèi).....................................160
9.3.5.6安全獎(jiǎng)罰措施.......................................160
9.3.6保證安全生產(chǎn)技術(shù)措施...................................160
9.3.6.1開挖施工安全保證措施...............................160
9.3.6.2火工品運(yùn)輸及爆破施工安全保證措施...................161
9.3.6.3裝楂及運(yùn)輸安全保證措施.............................163
9.3.6.4支護(hù)、襯砌安全保證措施.............................164
9.3.6.5隧道不良地質(zhì)地段安全保證措施.......................166
9.3.6.6通風(fēng)與防塵安全保證措施.............................167
9.3.6.7臨時(shí)用電及照明安全保證措施.........................167
9.3.6.8道床工程施工安全技術(shù)措施...........................169
9.3.6.9用電、有害氣體的控制及勞動(dòng)保護(hù)措施.................170
9.3.6.10冬、雨季施工安全保證措施..........................171
9.3.6.11突發(fā)事件應(yīng)急措施..................................171
9.3.6.12治安消防措施......................................174
9.3.6.13防汛防洪,洞內(nèi)排水措施.............................176
9.3.6.14防火安全保證措施..................................177
9.3.7安全應(yīng)急救援預(yù)案.......................................178
9.3.7.1總則...............................................178
9.3.7.2災(zāi)情預(yù)警和報(bào)告.....................................178
9.3.7.3應(yīng)急反應(yīng)機(jī)構(gòu).......................................179
9.3.7.4搶險(xiǎn)隊(duì)伍...........................................179
9.3.7.5災(zāi)害處置...........................................179
9.3.7.6搶險(xiǎn)步驟...........................................179
9.3.7.7防災(zāi)設(shè)備...........................................180
9.3.7.8災(zāi)情、事故搜集和報(bào)告...............................180
9.4確保工期的措施..............................................180
9.4.1積極做好施工準(zhǔn)備工作,確保工程按時(shí)開工..................180
9.4.2及時(shí)編制實(shí)施性施組,加強(qiáng)施組的動(dòng)態(tài)管理..................181
9.4.3按時(shí)投入各種生產(chǎn)資源...................................181
9.4.4依托信息化技術(shù),加強(qiáng)進(jìn)度監(jiān)控管理........................181
9.4.5開展勞動(dòng)競(jìng)賽活動(dòng).......................................182
9.4.6建立高效的施工組織機(jī)構(gòu)和管理體系.......................182
9.4.7加強(qiáng)物質(zhì)儲(chǔ)備,保證物質(zhì)供應(yīng)..............................183
9.5環(huán)保、水保措施..............................................183
9.5.1施工環(huán)保、水土保持管理組織機(jī)構(gòu).........................183
9.5.2施工環(huán)保、水土保持管理檢查制度.........................184
9.5.2.1施工環(huán)境、水土保持規(guī)劃制度.........................184
9.5.2.2環(huán)境保護(hù)、水土保持“三同時(shí)原則”...................184
9.5.2.3環(huán)境保護(hù)、水土保持目標(biāo)責(zé)任制.......................184
9.5.3環(huán)境保護(hù)措施...........................................184
9.5.3.1減小生態(tài)破壞.......................................185
9.5.3.2噪聲污染控制.......................................186
9.5.3.3水環(huán)境保護(hù).........................................186
9.5.3.4大氣環(huán)境保護(hù).......................................187
9.5.3.5固體廢棄物處理.....................................187
9.5.4水土保持措施...........................................187
9.6文物保護(hù)措施................................................189
9.7名木古樹、珍稀動(dòng)物保護(hù)措施..................................190
9.8文明施工....................................................190
9.8.1文明施工管理體系.......................................190
9.8.2文明施工措施...........................................191
9.8.2.1組織領(lǐng)導(dǎo)...........................................191
9.8.2.2健全管理制度.......................................191
9.8.2.3加強(qiáng)宣傳教育.......................................191
9.8.3.4文明施工技術(shù)措施...................................192
9.8.3.5環(huán)境衛(wèi)生管理.......................................193
9.9冬季施工措施................................................193
9.10雨季施工措施...............................................194
9.11信息化管理措施.............................................196
9.11.1信息化管理體系........................................196
9.11.2信息化管理要求........................................197
9.11.3信息化管理保證措施....................................197
9.11.4信息化設(shè)施建設(shè)........................................198
第十章引用的文件及施工規(guī)范.......................................199
10.1設(shè)計(jì)文件...................................................199
10.2施工規(guī)范...................................................199
第H^一章施工組織圖表.............................................202
附表1擬投入本工程的勞動(dòng)力計(jì)劃表..............................202
附圖1施工場(chǎng)地平面布置圖......................................202
附圖2總體施工形象進(jìn)度圖......................................202
附圖3施工任務(wù)劃分圖..........................................202
附圖4施工進(jìn)度網(wǎng)絡(luò)計(jì)劃圖......................................202
附圖5施工進(jìn)度橫道圖..........................................202
第十二章存在的問題及建議........................................203
第一章編制依據(jù)、編制范圍及設(shè)計(jì)概況
1.1編制依據(jù)
(1)《鐵路工程施工組織設(shè)計(jì)指南》(鐵建設(shè)[2009]226號(hào));
(2)XX公司招標(biāo)文件和投標(biāo)文件;
(3)《新建長(zhǎng)沙至昆明鐵路站前工程施工總價(jià)承包指導(dǎo)性施工組
織設(shè)計(jì)》及《關(guān)于下達(dá)新建滬昆鐵路指導(dǎo)性施工組織設(shè)計(jì)(2010度修
編版指導(dǎo)意見)的通知》;
(4)新建滬昆鐵路客運(yùn)專線長(zhǎng)沙至昆明段(貴州)站前工程施工
CKGZTJ-3標(biāo)段設(shè)計(jì)資料、施工招標(biāo)文件、答疑與補(bǔ)遺等全部資料;
(5)中鐵第二勘察設(shè)計(jì)院集團(tuán)XX公司《新建鐵路滬昆線招標(biāo)資料
棟梁坡隧道設(shè)計(jì)圖》(20_年7月)、《新建滬昆鐵路長(zhǎng)沙至昆明段棟
梁坡隧道洞口及輔助坑道施工資料》(供咨詢)(20—年9月)、《新建
滬昆鐵路客專長(zhǎng)沙至昆明段參考圖時(shí)速350公里隧道防排水》(供咨
詢)(20_年11月)及有關(guān)的設(shè)計(jì)文件和相關(guān)的施工圖紙;
(6)國(guó)家和鐵道部現(xiàn)行的有關(guān)設(shè)計(jì)規(guī)范、法律法規(guī)、施工規(guī)范、
施工指南、工程質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)及安全技術(shù)規(guī)程;
(7)現(xiàn)場(chǎng)踏勘調(diào)查的資料,本工程相關(guān)地質(zhì)勘察、水文資料。
(8)滬昆鐵路建設(shè)“六位一體”文件;
(9XX公司擁有的科技成果、機(jī)械設(shè)備、施工技術(shù)、施工工藝、
工法、管理水平及類似工程的施工經(jīng)驗(yàn),結(jié)合武廣、太中銀、石武、
京滬等國(guó)內(nèi)客運(yùn)專線及引進(jìn)國(guó)外高鐵先進(jìn)的施工技術(shù)、管理水平、施
工經(jīng)驗(yàn)等;
(10)鐵道部和XX省、XX省人民政府有關(guān)加快滬昆鐵路建設(shè)的會(huì)
議紀(jì)要;
(11)棟梁坡隧道施工現(xiàn)場(chǎng)踏勘所取得的有關(guān)工程地質(zhì)、水文地
質(zhì)、氣象、地材供應(yīng)情況、交通運(yùn)輸狀況,以及當(dāng)?shù)孛耧L(fēng)民俗、自然
環(huán)境、水土資源狀況等調(diào)查資料;
(12)施工合同及業(yè)主工期要求。
1.2編制范圍
新建滬昆鐵路客專貴州段CKGZTJ-3標(biāo)棟梁坡隧道,起訖里程為
DK499+055?DK508+349,全長(zhǎng)9294m。主要包括棟梁坡隧道進(jìn)口、1#
斜井、2#斜井、平導(dǎo)、隧道出口等工程。
1.3設(shè)計(jì)概況
1.3.1線路平縱斷面設(shè)計(jì)
線路平面曲線布設(shè)情況見表l-lo
線路縱斷面坡度布設(shè)情況見表l-2o
表IT線路平面曲線布設(shè)表
緩和曲線
序心ZH、HZ里程線型半徑(M)
長(zhǎng)度(M)
1D1K506+758.524?D1K509+152.984470右偏曲線10000
表1-2線路縱斷面坡度布設(shè)表
序號(hào)起止里程坡度(%。)長(zhǎng)度(M)
1DK499+055?DK503+5903.04535
2DK503+590?DK508+100-114510
3DK508+100?DK508+349-20249
1.3.2軌道設(shè)計(jì)
洞內(nèi)采用雙塊式無(wú)酢軌道,軌道結(jié)構(gòu)高度為515mm。隧道內(nèi)鋪設(shè)
60kg/m鋼軌。
1.3.3隧道洞口設(shè)計(jì)
本隧進(jìn)口明洞采用斜切式洞門、出口為單耳墻明洞。
1.3.4隧道洞身設(shè)計(jì)
棟梁坡隧道進(jìn)口DK499+055—+076段21m、出口DK508+334—+349
段15m明挖法施工,其余段落采用暗挖法,設(shè)計(jì)為復(fù)合結(jié)構(gòu)支護(hù)。
第二章工程概況
2.1線路概況
隧道進(jìn)口位于XX縣金堡鄉(xiāng)絞把村,斜井位于金堡鄉(xiāng)內(nèi),隧道出口
位于XX縣馬號(hào)鄉(xiāng)冰溪村坡腳組附近。隧區(qū)有鄉(xiāng)鎮(zhèn)公路,即鎮(zhèn)遠(yuǎn)至金
堡、鎮(zhèn)遠(yuǎn)一報(bào)京南北向貫穿整個(gè)區(qū)域,此外,隧道洞身穿越區(qū)域人煙
稀少,隧道進(jìn)、出口無(wú)簡(jiǎn)易公路相通,交通不便利。
圖2-1棟梁坡隧道線路位置圖
棟梁坡隧道全長(zhǎng)9294m,起訖里程為DK499+055~DK508+349,隧
道設(shè)計(jì)為單洞雙線隧道,線間距5.0m。隧道縱坡為對(duì)稱人字坡。隧道
共設(shè)計(jì)了2座斜井、1座平導(dǎo)、進(jìn)出口共7個(gè)工作面共同組織施工,
運(yùn)輸方式采用無(wú)軌運(yùn)輸。
2.2主要技術(shù)標(biāo)準(zhǔn)
鐵路等級(jí):客運(yùn)專線。
正線數(shù)目:雙線。
設(shè)計(jì)行車速度:250km/h,基礎(chǔ)設(shè)施預(yù)留進(jìn)一步提速條件。
正線線間距:5.0mo
最小曲線半徑:4000m。
最大坡度:20%。,特殊地段30%。。
列車類型:動(dòng)車組。
到發(fā)線有效長(zhǎng)度:650m。
列車運(yùn)行控制方式:自動(dòng)控制。
運(yùn)輸調(diào)度方式:綜合集中調(diào)度。
2.3主要工程數(shù)量
本隧道主要工程數(shù)量詳見表2-1、表2-2。
表2-1棟梁坡隧道實(shí)物工程及圍巖情況表
圍巖級(jí)別
序號(hào)名稱單位數(shù)量
IIIIVV
1棟梁坡隧道正洞m9294485028231621
2一號(hào)斜井m335026075
3二號(hào)斜井m58331020073
4平導(dǎo)m1130356355419
表2-2隧道正洞主要工程數(shù)量表
序號(hào)項(xiàng)目名稱單位數(shù)量
1正洞開挖M.1350516
2混凝土M3349574
3鋼筋Kg3344418
4土工布M2286737
5防水板M2286737
6①25中空注漿錨桿m349693
7中22砂漿注漿錨桿m226981
2.4征地拆遷
隧道紅線用地均為旱地、林地、荒地等,目前征拆工作已基本完
成。我部與有關(guān)部門完成征地拆遷手續(xù)后,根據(jù)施工需要,繪制生產(chǎn)、
生活用地詳細(xì)規(guī)劃圖,合理規(guī)劃布置場(chǎng)地。在進(jìn)行臨建施工前首先將
場(chǎng)地內(nèi)的地表植被和表層土鏟除,選擇合適地點(diǎn)有效保存,然后通過
人工配合機(jī)械設(shè)備對(duì)場(chǎng)地進(jìn)行平整。各項(xiàng)臨時(shí)設(shè)施必須布置在規(guī)劃的
場(chǎng)地內(nèi),修建符合規(guī)定標(biāo)準(zhǔn),做到場(chǎng)地整潔、道路平順、排水暢通、標(biāo)
志醒目、生產(chǎn)環(huán)境達(dá)到標(biāo)準(zhǔn)作業(yè)要求。
2.5工程特點(diǎn)'重點(diǎn)及難點(diǎn)
2.5.1工程特點(diǎn)
⑴區(qū)域地理位置條件復(fù)雜
隧道區(qū)域地處于山勢(shì)連綿帶區(qū),進(jìn)出口、斜井運(yùn)距較大,交通條件
較差,新建便道長(zhǎng),施工物流組織困難。
⑵工期緊、工序轉(zhuǎn)換頻繁
隧道施工戰(zhàn)線長(zhǎng),施工工期緊,給施工組織帶來(lái)了很大的難度。隧
道洞身穿越采空區(qū)、斷層破碎帶、順層偏壓等不良地質(zhì)帶,地質(zhì)條件
復(fù)雜,圍巖巖性差異性較大,圍巖軟硬不均,工序轉(zhuǎn)換頻繁,工藝復(fù)雜。
⑶客運(yùn)專線隧道技術(shù)含量高,質(zhì)量要求嚴(yán)、標(biāo)準(zhǔn)高
設(shè)計(jì)速度目標(biāo)值為基礎(chǔ)設(shè)施250km/h,預(yù)留進(jìn)一步提速條件。主
體結(jié)構(gòu)使用壽命期限為100年;隧道工后沉降要求達(dá)到標(biāo)準(zhǔn)規(guī)范;隧
道防排水采取“防、排、截、堵結(jié)合,限量排放,因地制宜,綜合治理”
等原則,防水要求高;隧道混凝土結(jié)構(gòu)耐久性根據(jù)設(shè)計(jì)使用年限、環(huán)
境條件和作用等級(jí)進(jìn)行設(shè)計(jì),選用質(zhì)量穩(wěn)定并有利于改善混凝土密實(shí)
性和抗裂性的水泥和骨料等原材料,盡可能降低混凝土的拌和水用量
和水膠比,并在混凝土組分中摻入適宜的礦物摻和料、高效減水劑和
引氣劑,根據(jù)環(huán)境條件及作用等級(jí),增加鋼筋混凝土保護(hù)層厚度。所以
基底沉降量控制嚴(yán),結(jié)構(gòu)防排水等級(jí)高,混凝土耐久性要求高。
⑷環(huán)保、水保、文明施工要求高
工程所在地水系較發(fā)達(dá)、植被發(fā)育,對(duì)施工環(huán)保、水保要求高,
堅(jiān)持做到“少破壞、多保護(hù),少擾動(dòng)、多防護(hù),少污染、多防治”,使
環(huán)境保護(hù)監(jiān)控項(xiàng)目與監(jiān)控結(jié)果達(dá)到設(shè)計(jì)文件及有關(guān)規(guī)定。
⑸沿路為貴州黔東南少數(shù)民族地區(qū),工程所在地少數(shù)民族多,施
工時(shí)
溫馨提示
- 1. 本站所有資源如無(wú)特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 6 讓我們的學(xué)校更美好第一課時(shí)教學(xué)設(shè)計(jì)-2023-2024學(xué)年道德與法治三年級(jí)上冊(cè)(部編版)
- 14《斜面》教學(xué)設(shè)計(jì)-2023-2024學(xué)年科學(xué)五年級(jí)下冊(cè)人教鄂教版
- 九年級(jí)化學(xué)下冊(cè) 第10單元 課題1《常見的酸和堿》教學(xué)設(shè)計(jì) (新版)新人教版
- Unit 2 No Rules No Order 大單元整體教學(xué)設(shè)計(jì)-2024-2025學(xué)年人教版英語(yǔ)七年級(jí)下冊(cè)
- 團(tuán)隊(duì)建設(shè)與入職培訓(xùn)1
- 三年級(jí)語(yǔ)文下冊(cè) 第三單元 12《一幅名揚(yáng)中外的畫》教學(xué)設(shè)計(jì) 新人教版
- 知識(shí)付費(fèi)產(chǎn)業(yè)發(fā)展
- 七年級(jí)地理上冊(cè) 3.3《世界的語(yǔ)言與宗教》教學(xué)設(shè)計(jì) 湘教版
- 七年級(jí)生物上冊(cè) 4.4.1《物質(zhì)運(yùn)輸?shù)妮d體》教學(xué)設(shè)計(jì) 魯科版五四制
- 《8 水果拼盤》(教學(xué)設(shè)計(jì))-2023-2024學(xué)年五年級(jí)下冊(cè)綜合實(shí)踐活動(dòng)長(zhǎng)春版
- 第16課-兩次鴉片戰(zhàn)爭(zhēng)說課稿(教學(xué)課件)高中歷史人教統(tǒng)編版中外歷史綱要上冊(cè)
- (完整版)電動(dòng)卷簾門施工方案及技術(shù)措施
- ERCP術(shù)前知情同意書
- 建筑工程計(jì)量與計(jì)價(jià)高職PPT完整全套教學(xué)課件
- 看板管理-精益生產(chǎn)
- 菜鳥WMS(大寶)操作手冊(cè) (修復(fù)的)
- 葫蘆島蘭家溝礦業(yè)有限公司(鉬礦)礦山地質(zhì)環(huán)境保護(hù)與土地復(fù)墾方案
- nc600產(chǎn)品說明書串口服務(wù)器使用
- 2022年07月甘肅張掖市引進(jìn)高層次急需人才23人筆試題庫(kù)含答案解析
- 不良資產(chǎn)處置法律實(shí)務(wù)
- 工程施工強(qiáng)制性條文執(zhí)行記錄表
評(píng)論
0/150
提交評(píng)論