版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、Mixing in WWTPMixing DutiesWhat is the job of the mixer in WWTP ?What is the reason mixing is needed ?Prevent settling of solids in a liquidKeep the bottom free from sedimentsKeep the solids in a homogeneous suspensionMixing Duty: SuspensionDrawdown of solids from surfacee.g. Particles lighter than
2、the liquidMixing of miscible liquids / Elimination of concentration differencesSpecified degree of homogeneitySpecified mixing timeMixing InflowBatch MixingMixing Duty: BlendingTransport of liquid & matterLiquid transport into and out of aerated zonesMixing Duty: CirculationMixing Duties in WWTPSand
3、 gritsControl level of suspensionKeep sludge in suspensionAllow sand to settleMechanical TreatmentEqualisation & Retention basinsKeep solids in SuspensionIntake pump station / Lifting stationKeep bottom cleanDraw-down of floating wasteIntake to WWTPMixing Duties in WWTPBiological TreatmentAnaerobic
4、zonesKeep activated sludge in suspensionMix inflowAnoxic zonesKeep activated sludge in suspensionMix inflowMixing Duties in WWTPBiological TreatmentAerated tanksKeep activated sludge in suspensionCirculate liquid over aerated zonesSBR (Sequence Batch Reactors)Mixers and aeration work alternatingKeep
5、 activated sludge in suspensionMix inflowMixing Duties in WWTPFlash mixingMixing chemicals into sludgeGiven homogeneity and timeChemical TreatmentFloc mixingSuspensionGently circulation to achieve flocculationMixing Duties in WWTPSludge Treatment / HandlingMixing / collecting tanksMixing inflowsKeep
6、 sludge homogeneousDigestersKeep sludge homogeneousThickening / Storage tanksKeep sludge homogeneousThe Products: Flygt Mixers“Banana blade” mixers“Compact” mixersCompact mixersCompact Stainless steel designSmall / medium size diametersDirect driven (multi-pole)Flexible installation on Guide barsEas
7、y accessible for inspection & serviceSuitable for all tank shapes and sizes4600 - series46104620463046404650466046704680Banana Blade MixersLarge diameter & slow speedGear drivenSuperior efficiency = Low power consumptionCorrosion resistant coatingGuide bars installationSuitable for larger tanks of a
8、ll shapes4410/4430 - series44104430Installation SystemsSingle Guidebar systemThe most commonly used. Allows very flexible positioning for almost any tank.The mixer can either be hanging on a chain or wire resting on a support beamLifting davits are available.Installation SystemsTripod Guidebar syste
9、mMainly for the banana blade mixers, where the torsion loads are greater. Can also be used for the 4600 series.Double Guidebar systemSpecially designed for the banana blade mixers.Installation SystemsCantilever systemCan be used for the 4610 and 4620 mixers. Are available up to 3 m length.Bottom mou
10、nting systemCan be used for the 4610 and 4620 mixers.Using Flygt Mixers in WWTPAnoxic zonesAerated tanksSludge Handling / StorageAnoxic ZonesNo aeration equipment in tankMixing is needed for:SuspensionMixing inflowsCommon tank shapesAnoxic Zones for BNRO2Return Activated SludgeInternal Re-circulatio
11、nWaste Activated SludgeInflowAnoxic zoneAerobic zoneSedimentationBNR - Biological Nitrogen RemovalAnoxic Zones - Selecting MixersTanks Size and ShapeVolume to mixLosses due to geometryKeep sludge in SuspensionMix inflowsMixing Requirements+=RequiredPerformance(Thrust N)?Customer PreferencesInvestmen
12、tLCCOperation & Maintenance+Anoxic Zones - Selecting MixersExample 1: Anoxic zone - Small rectangular tank10 m6 m3 mSR4410 Prop.=1.8m & 18 rpm Pcons=0.6 kWSR4630 Prop.=7 (w. Jetring) Pcons=1.3 kWA simplified LCC: Investment + Energy cost over 5 yearsAnoxic Zones - Selecting Mixers20 m10 m6 mSR4410 P
13、rop.=2.2m & 25 rpm Pcons=1.4 kWSR4650 Prop.=7 (w. Jetring) Pcons=4.8 kWA simplified LCC: Investment + Energy cost over 5 yearsExample 2: Anoxic zone - Large rectangular tankAerated TanksAeration equipment cover part or all of tank bottom.Mixing is needed for:SuspensioncirculationCommon tank shapesAe
14、rated TanksPartial bottom coverageSuspensionCirculation of liquid over aerated areasFull bottom coverage (SBR)Suspension when aeration is turned offMixers & Aeration never operate at the same timeAerated Tanks - Selecting MixersExample: Racetrack with bottom diffusers2 x SR4430 Prop.=2.5m & 35 rpm P
15、cons=6.9 kW (tot)2 x SR4660 Prop.=15 (w. Jetring) Pcons=18.9 kW (tot)Sizing is based on:Size & geometry of tankAeration Required velocityInvestment + Energy cost over 5 yearsAerated Tanks - Selecting MixersLarge tanksEnergy efficientLarge volume CirculationSmaller tanksWhen installation might be dif
16、ficultSludge Handling / StorageSludge with DS 1%up to 10-15%Mixing is needed for:Mixing inflowsPrevent stagnant areaskeep homogeneousCommon tank shapesSludge characteristicsHigh concentration High viscosityIncreased power consumptionHigh “yield stress”stagnant zones with too small mixersMixing SludgeToo small mixerstagnant zonesSludge Handling - Selecting MixersNot suitable for sludge mixingLarger investmentLower power consumptionBetter cooling of motor at high viscositysmaller investmentHigher power consumptionSuitable when risk of cloggingWithout JetringWith Jet
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 鋁合金門窗安裝合同書樣本
- 川氣利用合同供應(yīng)
- 室內(nèi)設(shè)計(jì)裝修合同書范例
- 股權(quán)轉(zhuǎn)讓股東協(xié)議書2024年
- 餐飲服務(wù)供應(yīng)合同
- 2024年物流員工勞動合同
- 土地房屋購買協(xié)議范本
- 中學(xué)教師合同書樣本
- 杭州市租房協(xié)議范本
- 二手房交易買賣合同范本2024年
- 期中模擬檢測(試題) 2024-2025學(xué)年五年級上冊數(shù)學(xué)北師大版
- 統(tǒng)編版(2024新版)七年級上冊歷史第三單元 秦漢時期:復(fù)習(xí)課件
- 體格檢查神經(jīng)系統(tǒng)檢查課件
- 【核心素養(yǎng)目標(biāo)】13.3.1.2 等腰三角形的判定教案人教版數(shù)學(xué)八年級上冊
- 北京版小學(xué)英語1至6年級詞匯
- 5.3 善用法律 課件-2024-2025學(xué)年統(tǒng)編版道德與法治八年級上冊
- 琉璃瓦安裝施工合同
- 心臟心內(nèi)膜肉瘤的藥物治療進(jìn)展與展望
- 光伏發(fā)電工程建設(shè)標(biāo)準(zhǔn)工藝手冊(2023版)
- DL∕T 875-2016 架空輸電線路施工機(jī)具基本技術(shù)要求
- NB-T+10908-2021風(fēng)電機(jī)組混凝土-鋼混合塔筒施工規(guī)范
評論
0/150
提交評論