第一章編制說明及依據(jù)................................................................6
§1編制依據(jù).........................................................................6
§2編制原則.........................................................................6
§3編制說明.........................................................................7
第二堂工??魂................................................................8
§1工程環(huán)境..........................................................................8
§1.1工程概述....................................................................8
§1.2周邊環(huán)境條件................................................................8
§1.3氣象條件....................................................................9
§2工程范圍.........................................................................9
§3工程設(shè)計概況.....................................................................9
§3.1基坑支護(hù)方案設(shè)計依據(jù).........................................................9
§3.2基坑支護(hù)設(shè)計方案的選取.......................................................10
§3.3鉆(沖)孔樁...................................................................10
§3.4攪拌樁施工...................................................................11
§3.5錨索.........................................................................11
§3.6錨桿及噴層施工...............................................................12
§3.7超前微型樁施工...............................................................12
§4工程地質(zhì)與水文地質(zhì)..............................................................12
§4.1工程地質(zhì)....................................................................12
§4.2水文地質(zhì)....................................................................13
§5.1施工工程量大、工期緊,資源投入大.............................................14
§5.2基坑地質(zhì)狀況復(fù)雜............................................................14
§5.3基坑攪拌樁止水為一重點.......................................................14
§5.4基坑變形監(jiān)測為一重點。.......................................................14
§5.5基坑四周管網(wǎng)多,保護(hù)及遷移為一重點。.........................................14
第三聿BI,海體鬃劃...........................................................14
§1施工總體策劃目標(biāo)................................................................14
§2施工總體安排....................................................................15
§2.1工程總體部署................................................................15
§2.1.1施工場地布置考慮...............................................................15
§2.1.2圍護(hù)結(jié)構(gòu)施工分區(qū)考慮...........................................................16
§2.1.3機(jī)械設(shè)備選擇考慮...............................................................16
§2.1.5預(yù)應(yīng)力錨索張拉時機(jī)考慮.........................................................16
§2.1.6施工臨時水電布置考慮...........................................................16
§2.2工程總體施工流程..........................................................17
§3施工準(zhǔn)備及施工總平面布置........................................................18
§3.1施工準(zhǔn)備..................................................................18
§3.2管線拆遷及保護(hù)............................................................19
§3.3施工總平面布置.............................................................19
§3.4交通疏解..................................................................21
§3.5施工總平面布置圖...........................................................21
§4現(xiàn)場管理與組織..................................................................21
§4.1現(xiàn)場項目法管理組織機(jī)構(gòu)....................................................21
§4.2項目管理機(jī)構(gòu)配置情況表.....................................................22
§4.3主要人員及部門管理職責(zé)劃分.................................................22
§4.4項目管理機(jī)構(gòu)配備情況輔助說明資料............................................23
§5相關(guān)單位協(xié)調(diào)配合措施............................................................23
§5.1與各承包商之間的接口界面協(xié)調(diào)................................................23
§5.2與監(jiān)理工程師的協(xié)調(diào)..........................................................24
§5.3與相鄰工程的協(xié)調(diào)............................................................24
§5.XX市政相關(guān)部門之間的協(xié)調(diào).....................................................24
§5.5與當(dāng)?shù)卣熬用裰g的協(xié)調(diào)..................................................24
第園量25
§1主要工程項目施工計劃進(jìn)度指標(biāo).....................................................25
§2工程施工計劃橫道圖...............................................................25
§3主要工期目標(biāo)....................................................................25
§3.1總工期......................................................................25
§3.2主要階段工期目標(biāo)............................................................25
繁5章資講劃.................................................................26
§1機(jī)械設(shè)備的投入計劃..............................................................26
§1.1主要施工機(jī)械設(shè)備、主要施工機(jī)械進(jìn)場計劃.....................................26
§1.2機(jī)械設(shè)備保證措施...........................................................27
§2勞動力的投入計劃及人員保證措施..................................................28
§2.1勞動力安排計劃..............................................................28
§2.2人員保證措施................................................................28
§3主要材料供應(yīng)計劃及材料保證措施..................................................29
§3.1主要材料進(jìn)場計劃表..........................................................29
§3.2材料保證措施................................................................29
§3工程項目資金計劃與合同用款估算計劃..............................................32
第六章美貌施工揍泰、工琶和解決為褰.................................................33
§1施工測量........................................................................33
§1.1原始數(shù)據(jù)驗算...............................................................33
§1.2平面控制布設(shè)...............................................................33
§1.3高程控制網(wǎng)布設(shè).............................................................33
§1.4測量儀器配備...............................................................33
§2深層攪拌樁施工..................................................................34
§2.1概述........................................................................34
§2.2施工工藝流程................................................................34
§2.3施工方法及技術(shù)措施..........................................................35
§2.4施工質(zhì)量控制...............................................................36
§2.5質(zhì)量檢驗...................................................................37
§2.6施工中常見問題和處理.......................................................37
§3超前微型樁施工..................................................................38
§3.1概述.........................................................................38
§3.2施工工藝流程...............................................................38
§3.3施工方法及技術(shù)措施..........................................................39
§3.4工程質(zhì)量保證措施............................................................42
§4鉆(沖)孔樁工程.................................................................43
§4.1概述.......................................................................43
§4.2施工工藝流程...............................................................43
§4.3施工方法及技術(shù)措施.........................................................44
§4.4常見問題處理方案...........................................................50
§4.4.1施工法中孔壁坍塌及對策...................................................50
§4.4.2縮頸.....................................................................51
§4.4.3卡鉆.....................................................................51
§4.4.4導(dǎo)管脫落.................................................................52
§4.4.5斜孔.....................................................................52
§4.4.6掉錘.....................................................................52
§4.4.7鋼筋籠上浮...............................................................52
§4.4.8樁底沉渣量過多...........................................................53
§4.4.9導(dǎo)管進(jìn)水.................................................................53
§4.4.10斷樁....................................................................54
§5錨索施工工藝...................................................................54
§5.1概述........................................................................54
§5.2施工工藝流程...............................................................55
§5.3施工方法及技術(shù)措施.........................................................55
§5.4質(zhì)量控制...................................................................58
§5.5施工中常遇問題及處理.......................................................58
§6錨桿及噴層施工................................................................59
§6.1概述........................................................................59
§6.2施工工藝流程...............................................................60
§6.3施工方法及技術(shù)措施.........................................................60
§6.4質(zhì)量控制...................................................................62
§7基坑土石方挖運(yùn)..................................................................64
§7.1施工部署....................................................................64
§7.1.1施工準(zhǔn)備..................................................................64
§7.2土方開挖施工方法..........................................................66
§7.2367
§7.3基坑內(nèi)降排水...............................................................68
§7.4垂直運(yùn)輸工程...............................................................68
§7.4.1施工準(zhǔn)備........................................................................68
§7.4.2垂直運(yùn)輸安全管理措施............................................................68
§7.4.3技術(shù)安全規(guī)程....................................................................69
篥上章BI嬲閽asm測...........................................................71
§1施工監(jiān)測目的及意義..............................................................71
§2監(jiān)測人員架構(gòu)....................................................................71
§3監(jiān)測內(nèi)容及技術(shù)措施..............................................................71
§3.1監(jiān)測內(nèi)容....................................................................71
§3.2監(jiān)測技術(shù)措施................................................................72
第八章BIWWS...................................................................................................77
§1工期保證措施....................................................................77
§1.1工期保證總體措施...........................................................77
§1.2主要分部工程的工期保證措施.................................................78
§1.3確保關(guān)鍵工期的保證措施.....................................................78
§2技術(shù)保證措施....................................................................79
§2.1技術(shù)管理體系................................................................79
§2.2測量管理....................................................................79
§2.3試驗管理....................................................................80
§2.4施工管理....................................................................80
§3質(zhì)量保證措施....................................................................80
§3.1工程質(zhì)量的管理目標(biāo)及保證體系...............................................81
§3.2工程質(zhì)量目標(biāo)的保證體系.....................................................86
§3.3施工質(zhì)量流程控制...........................................................87
§4安全保證措施....................................................................92
§4.1安全目標(biāo)....................................................................92
§4.2安全保證體系................................................................93
§4.3安全施工保證措施............................................................93
§4.4安全施工技術(shù)性措施..........................................................94
§4.5安全施工過程控制...........................................................101
§4.6安全應(yīng)急流程控制...........................................................102
§4.7危險源辨識..................................................................105
§4.8管線保護(hù)...................................................................106
§5文明施工保證體系及措施..........................................................107
§5.1文明施工目標(biāo)...............................................................107
§5.2施工現(xiàn)場文明管理...........................................................107
§5.2.1場容場貌管理....................................................................107
§5.2.2環(huán)境綠化管理....................................................................108
§5.2.3臨時道路管理....................................................................108
§5.2.4材料堆放管理....................................................................108
§5.2.5辦公生活區(qū)管理..................................................................109
§5.3環(huán)境保護(hù)措施...............................................................109
§5.3.1衛(wèi)生管理措施....................................................................109
§5.3.2污染控制措施.............................................................109
§5.4突發(fā)事件處理方案...........................................................110
§5.4.1安全事故措施.............................................................110
§5.4.2治安管理措施.............................................................110
§5.4.3消防措施.................................................................111
§5.5周圍環(huán)境協(xié)調(diào)...............................................................113
§5.5.1防止擾民措施.............................................................113
§5.5.2糾紛應(yīng)急措施.............................................................113
§5.6節(jié)假日施工的保障措施......................................................114
§6成品保護(hù)保證措施...............................................................115
§6.1主要管理措施.............................................................115
§6.2技術(shù)措施...................................................................115
戮0應(yīng)急馥塞.............................................................116
§1應(yīng)急救援組織...................................................................116
§2應(yīng)急救援職責(zé)...................................................................116
§3安全應(yīng)急流程...................................................................116
§4應(yīng)急救援工作和報告程序.........................................................118
§5事故應(yīng)急救援電話...............................................................118
§6事故應(yīng)急救援材料物資...........................................................118
§7突發(fā)事故發(fā)生應(yīng)急處理方法.......................................................119
§8急救技術(shù)及常備藥品.............................................................119
§8.1急救技術(shù)..................................................................119
§8.2常備藥品..................................................................120
§9基坑坍塌事故的應(yīng)急措施.........................................................121
§10機(jī)械傷害事故的應(yīng)急措施........................................................122
§11高處墜落事故的應(yīng)急措施........................................................122
§12物體打擊事故的應(yīng)急措施........................................................123
§13觸電事故的應(yīng)急措施............................................................124
§14火災(zāi)事故的應(yīng)急措施............................................................125
§15附件...........................................................................126
§15.1附件一:施工總平面布置圖....................................................126
§15.2附件二:施工進(jìn)度計劃橫道圖..................................................126
§15.3附件三:土方分層開挖示意圖..................................................126
§15.4附件四:坡道口收口示意圖....................................................126
第一章編制說明及依據(jù)
§1編制依據(jù)
I.《碧桂園XX市花園中地塊基坑支護(hù)工程》招標(biāo)文件。
2.《碧桂園XX市花園中地塊基坑支護(hù)工程》招標(biāo)設(shè)計圖。
3.碧桂園XX市花園中地塊基坑支護(hù)工程招標(biāo)答疑紀(jì)要。
4.碧桂園XX市花園中地塊基坑支護(hù)工程現(xiàn)場調(diào)查資料。
5.國XXXX市現(xiàn)行有關(guān)法規(guī)、標(biāo)準(zhǔn)、技術(shù)規(guī)范、定額,以及特別是環(huán)境保護(hù)、水
土保持方面的政策和法規(guī)。
《混凝土結(jié)構(gòu)設(shè)計規(guī)范》(GB50010-2002)
《建筑結(jié)構(gòu)荷載規(guī)范》(GB50009-2001)
《巖土錨桿(索)技術(shù)規(guī)程》(CECS22:2005)
《地下工程防水技術(shù)規(guī)范》(GB50108-2001)
《建筑地基基礎(chǔ)設(shè)計規(guī)范》(GB50007-2002)
《建筑地基處理技術(shù)規(guī)范》(JCJ79-2002)
XX省《建筑地基基礎(chǔ)施工規(guī)范》(DBJ15)
《建筑基坑支護(hù)技術(shù)規(guī)程》(JGJ120-99)
《錨桿噴射混凝土支護(hù)技術(shù)規(guī)范》(GB50056-2001)
《鋼筋焊接及驗收規(guī)程》(JGJ18-2003)
6.我單位施工隊伍、技術(shù)裝備能力以及以往施工同類工程的實踐經(jīng)驗。
§2編制原則
1.遵循招標(biāo)文件條款,響應(yīng)招標(biāo)文件要求,確保實現(xiàn)業(yè)主要求的質(zhì)量、工期、安
全、環(huán)境保護(hù)、文明施工和造價等各方面的工程目標(biāo)。
2.指導(dǎo)思想是:施工方案可行、施工技術(shù)先進(jìn)、施工組織科學(xué)、重信譽(yù)、守合同,
優(yōu)質(zhì)、安全、按期完成。
3.嚴(yán)格執(zhí)行施工過程中涉及的相關(guān)規(guī)范、規(guī)程和技術(shù)標(biāo)準(zhǔn)。
4.貫徹執(zhí)行國家和XX市有關(guān)方面的方針政策、遵守法律法規(guī)、尊重當(dāng)?shù)氐拿耧L(fēng)
民俗。
5.重視生態(tài)環(huán)境,在施工期間及竣工后不發(fā)生水土流失,確保工程范圍外的原地
形、地貌不被破壞,道路恢復(fù)原狀。
6.重視工程范圍的工程地質(zhì)、水文地質(zhì)調(diào)查工作,建立以地質(zhì)資料為先導(dǎo)、以量
測為依據(jù)的信息化施工管理體系。
7.施組編制做到施工總體部署和分項工程施工組織相結(jié)合、重點工程和一般工
程相結(jié)合、特殊技術(shù)和普通技術(shù)相結(jié)合,總體上使施組具有重點突出、內(nèi)容全面、思
路清晰的特點。
8.充分發(fā)揮我單位專業(yè)優(yōu)勢,做到依靠科技,精心組織,合理安排,突破難點。確
保優(yōu)質(zhì)、安全、快速建成碧桂園XX市花園中地塊基坑支護(hù)工程。
§3編制說明
本施工組織設(shè)計根據(jù)既有施工條件進(jìn)行編制,主要說明如下:
1、必須保證業(yè)主按期提供場地。
2、施工場地布置及施工部署、具體施工工藝基本按投標(biāo)施工組織設(shè)計考慮實施。
3、根據(jù)施工招標(biāo)要求,本工程工期為75日歷天,施工組織計劃按此“關(guān)門工期”
考慮,對投標(biāo)時的施組安排、進(jìn)度指標(biāo)作了適當(dāng)調(diào)整。
4、根XX公司對本工程施工的項目組建的實際到位人員,調(diào)整現(xiàn)場管理組織機(jī)構(gòu)
及有關(guān)責(zé)任人,并根XX公司在進(jìn)一步研究后優(yōu)化施組進(jìn)行機(jī)械設(shè)備配備。
第二》工棚K況
§1工程環(huán)境
§1.1工程概述
工程名稱:碧桂園XX市花園中地塊基坑支護(hù)工程
建設(shè)地點:XX市禪城區(qū)嶺南大道東側(cè)
建設(shè)單位:XX市禪城區(qū)碧桂園房地產(chǎn)開發(fā)XX公司
設(shè)計單位:XX市泰基工程技術(shù)XX公司
擬建場地位于XX市禪城區(qū)嶺南大道東側(cè),交通便利。場地較大,基坑總體呈長方
型,長邊長約154.2m,短邊長約130m,周長約542.8m;現(xiàn)場地較平坦,經(jīng)現(xiàn)場實測,坑
頂絕對標(biāo)高為3.40m,相對標(biāo)高約為-L30m),基坑挖深考慮到底板墊層底(底板面相
對標(biāo)高為-9.30m,底板600厚、墊層100厚),基坑底相對標(biāo)高為TO.00m,基坑開挖深
約8.70mo
本基坑設(shè)計側(cè)壁安全等級:西側(cè)靠近嶺南大道的基坑安全等級為一級,其它區(qū)段
為二級,基坑支護(hù)結(jié)構(gòu)使用年限自支護(hù)結(jié)構(gòu)完工之日起計為1年;±0.00相當(dāng)于絕對
標(biāo)高4.700mo
§1.2周邊環(huán)境條件
基坑北側(cè):該側(cè)地下室邊線距地塊用地紅線為6.距北地塊地下室邊線約
56m,紅線外為規(guī)劃瀾石二路;
基坑?xùn)|側(cè):該側(cè)地下室邊線距地塊用地紅線為6.6m,距圍墻約9.4m,紅線外為規(guī)
劃路;
基坑南側(cè):該側(cè)地下室邊線距地塊用地紅線為5.3m,距南地塊地下室邊線約
32.8m,紅線外為規(guī)劃新民一路。該側(cè)空地擬作鋼筋堆場使用(要求距基坑邊不小于2m,
堆載小于50kPa)o
基坑西側(cè):該側(cè)地下室邊線距地塊用地紅線為6.3~9.3m,距圍墻約4.4m,圍墻外
為嶺南大道人行道。
基坑周邊管線分布詳見《周邊地下管網(wǎng)圖》。
§1.3氣象條件
根據(jù)我司查詢xx市相關(guān)氣象資料顯示,本區(qū)位于南亞熱帶季風(fēng)氣候區(qū),春秋風(fēng)和
日麗,夏炎冬暖,降水豐沛,日照充足,在季風(fēng)環(huán)流控制下,4?8月,受海洋氣流影響,
氣候炎熱,降水量大,多偏南風(fēng);每年9月至翌年3月,受大陸冷高壓影響,氣候干燥,
降水較少,多偏北風(fēng)。每年5?10月,多熱帶氣旋,中心最大風(fēng)力處達(dá)12級,甚至以上。
據(jù)XX市歷年統(tǒng)計資料,年平均氣溫21.9℃極端最高氣溫38.7℃,最低氣溫0.0℃;年
平均降水量1696.5mm,最大降水量2864.7mm,最小降水量1113.2mm,日最大降水量
284.9mm;年平均風(fēng)速1.9m/s,極大風(fēng)速35.4m/s;年平均影響佛山的熱帶氣旋3.2
個;年平均相對濕度77%。
§2工程范圍
本項目為碧桂園XX市花園中地塊基坑支護(hù)工程,基坑周長約542.8m,深度約
8.70m的基坑支護(hù)工程;
包括基坑支護(hù)(鉆(沖)孔樁、水泥攪拌樁、錨索、錨桿、腰梁、腰梁、壓頂梁、
噴錨網(wǎng)等)和土方開挖等;
施工場地布置。包括發(fā)包人提供的施工平面圖紙指定的施工臨設(shè)場地地面硬化、
臨時施工道路、施工場地排水、施工用水、施工用電;本工程所需的臨時設(shè)施搭設(shè)、
施工道路及臨時用水用電、施工排水、安全文明施工措施等;
后續(xù)施工單位進(jìn)行的施工場地及工程竣工資料交接和配合。
§3工程設(shè)計概況
§3.1基坑支護(hù)方案設(shè)計依據(jù)
1、《建筑基坑支護(hù)技術(shù)規(guī)范》(JGJ120-99);
2、《XX省建筑基坑支護(hù)工程技術(shù)規(guī)范》(DBJ/T15-20-97);
3、《混凝土結(jié)構(gòu)設(shè)計規(guī)范》(GB50010-2002);
4、《巖土錨桿〈索〉技術(shù)規(guī)程》(CECS22:2005);
5、《建筑樁基技術(shù)規(guī)范》(JGJ94-2008);
6、《建筑基坑工程監(jiān)測技術(shù)規(guī)范》(GB50497-2009);
7、《XX市禪城區(qū)東平大橋北側(cè)項目中地塊地下室?guī)r土工程勘察報告》;
8、業(yè)主提供的相關(guān)建筑結(jié)構(gòu)圖紙以及周邊環(huán)境平面圖。
§3.2基坑支護(hù)設(shè)計方案的選取
1、基坑挖深8.70m,且基坑西側(cè)緊臨已有嶺南大道,南側(cè)現(xiàn)為南地塊施工場地,北
側(cè)為施工用地,東側(cè)地下室邊線距工地圍墻約9.4m,距紅線6.6m。
2、場地較大,地質(zhì)條件起伏較大,部分區(qū)域含較厚的淤泥質(zhì)土及砂層,部分巖層埋
深較淺?;拥状蟛糠致溆趶?qiáng)風(fēng)化巖層。
根據(jù)上述場地周邊環(huán)境及地質(zhì)狀況特點,將本基坑安全等級西側(cè)靠近嶺南大道一
側(cè)定為一級,其它段定為二級?;又ёo(hù)根據(jù)各區(qū)段周邊環(huán)境、地質(zhì)條件不同及施工
工期等要求分別采用〃灌注樁+攪拌樁+一道(兩道)預(yù)應(yīng)力錨索”和〃攪拌樁+噴錨網(wǎng)〃的
支護(hù)方案。
§3.3鉆(沖)孔樁
支護(hù)樁施工說明:具體采用鉆孔、沖孔或旋挖成孔最終由甲方具體確定。
(一)、灌注樁成孔
1、灌注樁的機(jī)具選擇、護(hù)筒埋設(shè)、泥漿護(hù)壁、施工要領(lǐng)及清孔等要求應(yīng)按現(xiàn)行
規(guī)范和規(guī)程處理;
2、樁成型后必須清除孔底沉渣,清孔后沉渣厚度不得大于300,并應(yīng)立即灌注水
下碎。
(二)、灌注樁鋼筋籠制作及安裝
1、縱向受力鋼筋采用HRB400鋼筋,配筋按均勻配筋設(shè)計,配筋詳見大樣圖。保
護(hù)層厚50mm;
2、螺旋箍筋采用HPB235鋼筋,橫向加勁筋采用HRB335,縱橫鋼筋交接處焊接牢
固;
3、鋼筋籠外側(cè)需設(shè)混凝土墊塊或采用其他有效措施,以保障鋼筋保護(hù)層厚度的
準(zhǔn)確性。
(三)、灌注樁水下混凝土澆灌
1、本工程的擋土樁混凝土強(qiáng)度等級C25o水下砂的用料及配合比按現(xiàn)行規(guī)范和
規(guī)程處理;
2、本工程采用導(dǎo)管灌注水下混凝土,導(dǎo)管的構(gòu)造和使用以及灌注水下碎的施工
要領(lǐng)按現(xiàn)行規(guī)范和規(guī)程處理;
3、為確保水下混凝土的質(zhì)量,向?qū)Ч芄嘧⑺卤藭r建議采用碎輸送泵或采用其
它有效措施;
4、施工時應(yīng)按樁頂?shù)脑O(shè)計標(biāo)高掌握好混凝土的灌注量。建議灌注於完成面之標(biāo)
高比樁頂?shù)脑O(shè)計標(biāo)高高出0.8米;
5、灌注樁強(qiáng)度達(dá)到設(shè)計強(qiáng)度的70%(7天)后,方可進(jìn)行土方開挖。
§3.4攪拌樁施工
1、攪拌樁直徑為500,間距見大樣圖,樁的垂直偏差不得超過1%,樁位偏差不得
大于50mm;
2、攪拌樁施工中采用四噴四攪的施工方法,施工中參數(shù)如下:樁身強(qiáng)度2
1.OMPa;采用P.C.32.5R復(fù)合硅酸鹽水泥,每米水泥用量不少于50kg;水灰比0.45~
0.55;攪拌提升速度W0.5~0.8m/min。必須保證攪拌樁的搭接質(zhì)量,搭接時間不大于
24小時,如間歇時間過長,應(yīng)采用局部補(bǔ)樁或注漿措施;
3、基坑開挖時攪拌樁的齡期不少于15天。
§3.5錨索
1、錨索施工按《巖土錨桿(索)技術(shù)規(guī)范CECS22:2005》進(jìn)行;
2、成孔采用泥漿護(hù)壁成孔,若淤泥質(zhì)砂層較厚,泥漿護(hù)壁成孔困難時,須加套管
跟進(jìn);
3、錨索采用3~5x765鋼絞線,鋼絞線強(qiáng)度標(biāo)準(zhǔn)值為1860MPa。成孔直徑為150mm;
4、錨索長度需以入巖控制,采用一次注漿,注漿材料選用水灰比為0.5~0.55的
純水泥漿,并加入適量的早強(qiáng)劑、及膨脹劑,水泥標(biāo)號為P.C.32.5R復(fù)合硅酸鹽水泥,
注漿壓力為0.5^1.OMPa;
5、鋼絞線錨固段架線環(huán)與緊箍環(huán)每隔1m間隔設(shè)置,緊箍環(huán)系16號鐵絲繞制,不
少于兩圈,自由段每隔2m設(shè)置一道架線環(huán),以保證鋼絞線順直;
6、待砂漿注漿體、壓頂梁或腰梁達(dá)到設(shè)計強(qiáng)度的70%后(齡期約5天)方可進(jìn)行
錨索張拉;
7、錨索鎖定前先張拉至設(shè)計抗拔力的1.1倍,保持15min,然后卸荷至零,再重新
張拉至鎖定荷載預(yù)應(yīng)力進(jìn)行鎖定作業(yè)。錨索張拉荷載分級及觀測時間應(yīng)遵守規(guī)范進(jìn)
行。
8、錨索施工過程中為盡可能減少成孔對地層產(chǎn)生的影響,應(yīng)進(jìn)行跳打。
§3.6錨桿及噴層施工
1、錨桿施工按《巖土錨桿〈索〉技術(shù)規(guī)程CECS22:2005》進(jìn)行;
2、錨桿采用HRB400鋼筋,錨桿采用鉆機(jī)成孔,成孔直徑為*130mm;
3、錨桿注漿采用M20水泥砂漿,注漿壓力為0.5~1.OMPa,水泥標(biāo)號為P.C.32.5R
復(fù)合硅酸鹽水泥;
4、掛網(wǎng)噴射碎:鋼筋網(wǎng)采用66@200X200,加強(qiáng)筋采用]16,鋼筋網(wǎng)[6鋼筋采用綁
扎連接,加強(qiáng)筋及加強(qiáng)筋與土釘?shù)倪B接采用焊接。噴射砂強(qiáng)度等級為C20,噴層厚度為
100mm,分兩次噴射。碎面層向上翻過基坑頂1.0m,以形成護(hù)坡,大樣圖見設(shè)計圖所示。
5、若錨桿全在雜填土或砂層中,可采用嬲C48的鋼花管代替,壁厚3.5mm。鋼花
管采用打入式,要求壓力灌注純水泥漿,水灰比為0.5飛.55,水泥標(biāo)號為P.C.32.5R復(fù)
合硅酸鹽水泥,注漿壓力為0.5~1.OMPa,注漿體強(qiáng)度為15MPa,要求每m水泥摻入量不
少于40kg。
§3.7超前微型樁施工
1、超前微型樁用鉆機(jī)成6150的孔,成孔間距如圖,成孔垂直偏差不大于現(xiàn),用
清水清孔,直到孔口返出清水后灌注純水泥漿,水灰比為0.5~0.55o
2、灌漿后在孔內(nèi)置入鋼管,然后進(jìn)行二次補(bǔ)漿,將水泥漿收縮部分填滿。
3、鋼管采用6114X3的焊管。
§4工程地質(zhì)與水文地質(zhì)
§4.1工程地質(zhì)
場地位于珠江三角洲地區(qū),屬沖積平原地貌,場地地勢較為平整,場地內(nèi)未發(fā)現(xiàn)
有影響場區(qū)穩(wěn)定性的構(gòu)造形跡等不良地質(zhì)作用,場地的區(qū)域穩(wěn)定性較好。
場地鉆孔揭露深度范圍內(nèi)第四系土層為填土、沖積土,基巖為第三系地層,巖性
為泥質(zhì)粉砂巖,自上而下敘述如下:
1、第四系人工填土層:
素填土<1〉:灰黃色,松散,主要由粘性土組成,局部夾碎磚、石塊或中細(xì)砂,欠壓
實,為新近堆填,局部孔段頂部為碎地面,局部孔段為雜填土。
2、第四系沖積層:
a.粉砂灰色,飽和,松散,分選性較好,成分以石英砂為主,含少量淤泥質(zhì)
±o平均標(biāo)貫7擊。
b.淤泥<2-2〉:深灰色,飽和,流塑,有腐殖臭味,含腐殖質(zhì),夾薄層粉細(xì)砂,局部孔
段夾腐木。平均標(biāo)貫1.3擊。
c.粉質(zhì)粘土<2-3>:灰色,灰黃色,棕紅色,可塑,局部軟塑,以粉、粘粒組成為主,
含少量砂,粘性較好,稍有光澤,韌性中等,強(qiáng)度中等,局部孔段含砂。平均標(biāo)貫7.8擊。
d.細(xì)砂<2-4>:灰黃色,飽和,稍密~中密,分選性較差,成分以石英砂為主,呈次棱
角狀,局部孔段含粘性土。平均標(biāo)貫12擊。
3、第四系殘積層:本場區(qū)缺失。
4、第三系地層,巖性為泥質(zhì)粉砂巖。
a.全風(fēng)化泥質(zhì)粉砂巖本場區(qū)缺失。
b.強(qiáng)風(fēng)化泥質(zhì)粉砂巖<4-2>:棕紅色,局部灰黃色,具原巖結(jié)構(gòu),成份、強(qiáng)度已顯著
改變,巖芯呈硬土狀、半巖半土狀、巖狀,局部孔段為強(qiáng)風(fēng)化砂巖。其巖石堅硬程度為
極軟巖,巖體完整程度為極破碎。
c.中風(fēng)化泥質(zhì)粉砂巖<4-3>:棕紅色,砂質(zhì)結(jié)構(gòu),層狀構(gòu)造,裂隙稍發(fā)育,礦物成份
以石英為主,粘土礦物次之,巖芯呈塊狀、短柱狀、局部長柱狀,敲擊聲脆。其巖石堅
硬程度為軟巖,巖體完整程度為較破碎。
d.微風(fēng)化泥質(zhì)粉砂巖<4-4〉:棕紅色,砂質(zhì)結(jié)構(gòu),層狀構(gòu)造,礦物成份以石英為主,
粘土礦物次之,巖芯呈長柱狀,局部短柱狀,敲擊聲脆。其巖石堅硬程度為較軟巖,巖體
完整程度為較破碎。
§4.2水文地質(zhì)
擬建場地地下水類型主要為孔隙水,賦存于沖積層中的潛水,其富水性和透水性
較好,受大氣降水入滲或側(cè)向補(bǔ)給,以蒸發(fā)或滲流方式進(jìn)行排泄;另一類為裂隙水,主
要賦存于風(fēng)化巖的裂隙中。地下水對碎具微腐蝕性,對鋼筋混凝土結(jié)構(gòu)中的鋼筋具微
腐蝕性,對鋼結(jié)構(gòu)有弱腐蝕性。
§5工程重點和難點分析
§5.1施工工程量大、工期緊,資源投入大
本工程基坑開挖深度達(dá)8.70m,攪拌樁15051m,鉆(沖)孔樁共290根,預(yù)應(yīng)力錨索施
工長度約10295m,錨桿施工長度4424m,具有施工深度大,資源投入多的特點,工程施工
過程中,制約因素相當(dāng)多,如施工工序間的約束、資源的組織調(diào)配、施工隊伍的協(xié)調(diào)等,
對總工期有相當(dāng)大的影響等,都可能制約施工進(jìn)度,而工程總工期要求為135天,施工工
期非常緊。
§5.2基坑地質(zhì)狀況復(fù)雜
整個場地工程地質(zhì)情況比較復(fù)雜,對土方開挖、鉆(沖)孔樁及錨索施工均帶來不
利影響。
§5.3基坑攪拌樁止水為一重點
基坑地下水位高,為保證止水效果,攪拌樁施工質(zhì)量是關(guān)鍵,在攪拌樁施工過程
中安排施工經(jīng)驗豐富的施工人員進(jìn)行全程跟蹤管理,對攪拌樁垂直度、水泥用量、搭
接質(zhì)量進(jìn)行嚴(yán)格控制。
§5.4基坑變形監(jiān)測為一重點。
本基坑開挖較深加之基坑四周環(huán)境比較復(fù)雜,為控制基坑位移,加強(qiáng)適時監(jiān)測并
將監(jiān)測數(shù)據(jù)及時反饋給監(jiān)理及設(shè)計。
§5.5基坑四周管網(wǎng)多,保護(hù)及遷移為一重點。
根據(jù)設(shè)計文件可知,基坑四周管網(wǎng)很多,尤其是基坑西側(cè)及東側(cè),部分管線及配電
房在開工前要完成遷移工作,本基坑開挖前將協(xié)調(diào)xx市政部門摸清管網(wǎng)的具體走及
埋深,對受開挖移影響的管網(wǎng)進(jìn)行遷移或做好保護(hù)措施,在管網(wǎng)位置處設(shè)置明顯的標(biāo)
/士匕、O
第三章虹總體策劃
§1施工總體策劃目標(biāo)
1、總工期與關(guān)鍵工期:嚴(yán)格按項目法進(jìn)行工程管理,抓住關(guān)鍵工期合理組織施工。
在合同工期內(nèi)完成工程的施工、驗收并清理退場完畢。
2、工程質(zhì)量:建立“TQC”全面質(zhì)量管理小組XX公司將嚴(yán)格按照國家頒發(fā)的建
筑工程各專業(yè)施工質(zhì)量驗收規(guī)范和《建筑工程施工質(zhì)量驗收統(tǒng)一標(biāo)準(zhǔn)》(GB50300-2001)
和GB/T19001-IS09001:2008質(zhì)量管理體系建立完整的工程質(zhì)量保證體系,以先進(jìn)的工
法、工藝和嚴(yán)格的管理確保工程質(zhì)量。并做到:工程質(zhì)量合格率100%。
3、安全生產(chǎn):嚴(yán)格按XX省和XX市及我集團(tuán)的有關(guān)法規(guī)、規(guī)定進(jìn)行安全生產(chǎn)管
理。杜絕重大安全事故,年輕傷率控制在1在以下。
4、文明施工:嚴(yán)格按《XX市建設(shè)工程文明施工標(biāo)準(zhǔn)》的規(guī)定執(zhí)行實施。確保文
明施工達(dá)到XX省雙優(yōu)工地標(biāo)準(zhǔn)。
§2施工總體安排
§2.1工程總體部署
針對本工程項目施工特點及重難點,我部擬從以下方面進(jìn)行控制。以保證高效、
保質(zhì)、保量、按期完成施工任務(wù)。
§2.1.1施工場地布置考慮
基坑北側(cè):該側(cè)地下室邊線距地塊用地紅線為6.
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 《6 陶罐和鐵罐》教學(xué)設(shè)計-2023-2024學(xué)年語文三年級下冊統(tǒng)編版
- Unit 8 Our Clothes Topic 1 Section B 教學(xué)設(shè)計 2024-2025學(xué)年仁愛科普版英語八年級下冊
- 2024-2025學(xué)年九年級物理下冊 19.2廣播電視與通信教學(xué)設(shè)計2 (新版)粵教滬版
- Unit 4 Pets Story Time(教學(xué)設(shè)計)-2024-2025學(xué)年人教新起點版英語三年級上冊
- Unit 2 More than fun Developing ideas I 教學(xué)設(shè)計-2024-2025學(xué)年外研版(2024)七年級英語上冊
- 2024年高中英語 Unit 2 Lesson7 Project教學(xué)設(shè)計 牛津譯林版選擇性必修第二冊
- 2024秋八年級物理上冊 第6章 質(zhì)量和密度 第2節(jié) 密度教學(xué)設(shè)計(新版)新人教版
- 藝術(shù)培訓(xùn)招生方案
- 7《我們的衣食之源》(第一課時)(教學(xué)設(shè)計)2023-2024學(xué)年統(tǒng)編版道德與法治四年級下冊
- 一年級道德與法治下冊 第四單元 溫暖你我他 第十一課 小手拉小手教學(xué)設(shè)計 蘇教版
- 醫(yī)學(xué)教材 鼻竇病變的CT和MRI診斷思路解析
- 2024年河南省機(jī)關(guān)單位工勤技能人員培訓(xùn)考核高級工技師《職業(yè)道德》題庫
- 2023光伏并網(wǎng)柜技術(shù)規(guī)范
- 綜合港區(qū)海水淡化引水工程施工組織設(shè)計
- 《紅色故事會傳承革命精神》主題班會
- 結(jié)余結(jié)轉(zhuǎn)資金管理辦法
- 2021年化工企業(yè)典型事故案例分析
- 2024年GINA哮喘防治指南修訂解讀課件
- 兒童死亡報告制度
- 2024年長春汽車職業(yè)技術(shù)大學(xué)單招職業(yè)技能測試題庫附答案
- 奧數(shù)試題(試題)-2023-2024學(xué)年四年級下冊數(shù)學(xué)人教版
評論
0/150
提交評論